International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG05 : Contributions  Recently posted -  Search Meeting Documents
   
ITU-T SG05  C 

ITU-T SG05

ICT and climate change

Study Period 2009

Results:520 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11  - Next Next
Contributions  Documents / Contributions
 
Number 
Received Source Title AI/Question
[ 270 ]  
 
2011-04-16 NTT   Proposal of basic insulation condition of ICT equipment for Recommendation of L.spec DC     Q19/5  
[ 269 ]  
 
2011-04-16 Italy   Contribution to the L.1400 series of methodologies     Q18/5  
[ 268 ]  
(Rev.1) 
2011-04-16 Telefon AB - LM Ericsson   L.Methodology Organizations and its relation to ISO 14064-1     Q18/5  
[ 267 ]  
 
2011-04-16 Telefon AB - LM Ericsson   Considerations on uncertainty and the use of LCA for goods, networks, services and organizations (Input to L.Methodology_Goods, networks and services and L.Methodology_ICT in organizations)     Q18/5  
[ 266 ]  
 
2011-04-16 NTT   Proposal of approach to developing method for estimating energy efficiency of Data Centre     Q17/5  
[ 265 ]  
 
2011-04-16 NTT   Necessity of minimum data sets of monitoring information of Data Centre equipment     Q17/5  
[ 264 ]  
 
2011-04-16 NTT   Proposed best practice for correcting air flow direction in rack mount equipment     Q17/5  
[ 263 ]  
 
2011-04-16 US   Comments on the draft revision of L.1000     Q21/5  
[ 262 ]  
 
2011-04-16 US   Proposed new work item to support phase 2 of L.1000     Q21/5  
[ 261 ]  
 
2011-04-16 ETRI   Proposal for improvement of L.methodology_ICT goods, networks and services     Q18/5  
[ 260 ]  
 
2011-04-16 ETRI   Proposal for some editorial and technical improvements of L.methodology_ICT_projects     Q18/5  
[ 259 ]  
 
2011-04-16 ETRI   Proposal for simplification of GHG reduction- and energy consumption saving-relevant terminologies     Q18/5  
[ 258 ]  
 
2011-04-16 ETRI   Liaison report on ITU-T L.DC to ISO/IEC JTC 1 SG-EEDC     Q17/5  
[ 257 ]  
 
2011-04-15 Telekomunikacja Polska   Material proposed to be included in Recommendation K.guide     Q3/5  
[ 256 ]  
 
2011-04-15 Telekomunikacja Polska   Development of the software EMFACDC for Recommendation K.mag     Q11/5  
[ 255 ]  
 
2011-04-15 Telekomunikacja Polska   Updated version of the software EMF-estimator (v 2.0.0)     Q3/5  
[ 254 ]  
 
2011-04-15 Japan   Propose of recommended configuration of HVDC power supply system for recommendation L.spec DC     Q19/5  
[ 253 ]  
 
2011-04-15 Japan   Technical report of relationship between grounding systems and human touch current for Recommendation L.spec DC     Q19/5  
[ 252 ]  
 
2011-04-15 Japan   Proposal on the detailed discussion about the description of the methodology     Q18/5  
[ 251 ]  
 
2011-04-15 Japan   Proposal of energy and space efficient cooling system for urban data centers     Q20/5, Q17/5  
[ 250 ]  
 
2011-04-15 Germany   Proposed draft new Recommendation on "Energy efficiency metric for base stations" (Contribution 213)     Q17/5  
[ 249 ]  
 
2011-04-15 Germany   Watt guard     Q3/5  
[ 248 ]  
 
2011-04-15 Germany   Comments of the German NC concerning TD669 / Draft k.hnwr     Q8/5, Q6/5, Q5/5, Q4/5, Q13/5, Q10/5  
[ 247 ]  
 
2011-04-15 NTT   Introduction of isolation transformer     Q4/5  
[ 246 ]  
 
2011-04-15 NTT   Necessity of resistibility tests for internal ports and required test levels against lightning surges     Q4/5  
[ 245 ]  
 
2011-04-15 NTT   Malfunction mechanisms of telecommunication equipment in customer premises     Q4/5  
[ 244 ]  
 
2011-04-15 Korea (Rep. of)   Collaboration and harmonization issue with IEC/TR 62726 of IEC TC 111     Q18/5  
[ 243 ]  
 
2011-04-15 Korea (Rep. of)   Collaboration and harmonization issue with IEC/TR 62725 of IEC TC 111     Q18/5  
[ 242 ]  
 
2011-04-15 Korea (Rep. of )   Consideration for battery standardization     Q21/5  
[ 241 ]  
 
2011-04-15 Korea (Rep. of)   Proposal for draft revision of Recommendation ITU-T L.1000     Q21/5  
[ 240 ]  
 
2011-04-15 Korea (Rep. of)   Discussion on L.1000 revision     Q21/5  
[ 239 ]  
 
2011-04-15 Korea (Rep. of )   Proposal for improving Clause 7 and 8 of L.rareMetals     Q21/5  
[ 238 ]  
 
2011-04-15 Korea (Rep. of)   Proposal of revised text for clause 6 of L.rareMetals     Q21/5  
[ 237 ]  
 
2011-04-15 Korea (Rep. of)   Proposal for Clause 10 and 11 of L.methodology_ICT_projects     Q18/5  
[ 236 ]  
 
2011-04-15 Korea (Rep. of)   Proposal for improvement of L.methodology ICT in organizations     Q18/5  
[ 235 ]  
 
2011-04-15 Korea (Rep. of)   Gap analysis and an overall map of assessment methodologies     Q18/5  
[ 234 ]  
 
2011-04-15 Korea (Rep. of)   Proposal for the work scope of L.methodology ICT in countries     Q18/5  
[ 233 ]  
 
2011-04-15 Korea (Rep. of)   Proposal for update of the draft Recommendation L.DC     Q17/5  
[ 232 ]  
 
2011-04-15 Korea (Rep. of)   Proposal for update of Clause 8.1.3.1 of L.methodology_ICT in organizations, "Draft Recommendation ITU-T L.methodology_ICT in Organizations"     Q18/5  
[ 231 ]  
 
2011-04-15 Korea (Rep. of)   Proposal for considering uncertainty estimation of the in-situ measurement     Q3/5  
[ 230 ]  
 
2011-04-15 China   The specifications of 240V direct current power supply system for telecommunications     Q19/5  
[ 229 ]  
 
2011-04-15 China   The specification of DC power feeding system interface     Q19/5  
[ 228 ]  
 
2011-04-15 China   Study and proposal for the drafting of K.henv     Q8/5, Q16/5, Q12/5  
[ 227 ]  
 
2011-04-15 China   L.1000 research results on Chinese market for mobile phone     Q21/5  
[ 226 ]  
 
2011-04-15 China   Comments to L.1000 revision draft     Q21/5  
[ 225 ]  
 
2011-04-15 UK   Study Item Skeleton Document: Using ICTs to enable countries to adapt to climate change: 'Survey of the types of ICT and standards available'     Q23/5  
[ 224 ]  
 
2011-04-15 UK   Methodology to evaluate the GHG Impact of ICT in Cities- Skeleton Version Draft B     Q18/5  
[ 223 ]  
 
2011-04-15 Nokia   Additional information for phase 2 of L.1000     Q21/5  
[ 222 ]  
 
2011-04-15 Nokia   Nokia response to the proposal to develop a universal battery recommendation     Q21/5  
[ 221 ]  
 
2011-04-15 Finland   Relationship between charger output current and cost     Q21/5  
Results:520 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2012-09-27