Contributions |
|
Number
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 788 ]
|
Complexity, Scalability, Independency, and Transparency
|
BT
|
Q12/15
|
2008-01-31 |
|
[ 787 ]
|
Proposal of PMD value that should be considered in 40Gb/s modulation formats
|
NTT
|
Q6/15
|
2008-01-31 |
|
[ 786 ]
|
40 GbE MTTFPA when using 512B/513B transcoding
|
NTT
|
Q11/15
|
2008-01-31 |
|
[ 785 ]
|
OTN enhancement accommodating Ethernet clients with bit transparency as well as block code transparency
|
NTT
|
Q11/15
|
2008-01-31 |
|
[ 784 ]
|
G.lt: Comments about "Draft text for G.lt" recommendation
|
Telecom Italia
|
Q4/15
|
2008-01-31 |
|
[ 783 ]
|
G.vdsl: inclusion of SOS mechanism in new G.993.2 amendment
|
Telecom Italia
|
Q4/15
|
2008-01-31 |
|
[ 782 ]
|
Proposed study items for packet based transport technologies for the next study period (2009-2012)
|
NTT
|
QNEW/15, Q14/15, Q13/15, Q12/15, Q11/15, Q9/15, Q3/15
|
2008-01-31 |
|
[ 781 ]
|
Proposed update for "Optical Transport Networks & Technologies Standardization Work Plan"
|
NTT
|
Q3/15
|
2008-01-31 |
|
[ 780 ]
|
Information on Raman gain distribution measurement technique
|
NTT
|
Q8/15
|
2008-01-31 |
|
[ 779 ]
|
Proposal regarding Q8/15 study items for the 2009-2012 study period
|
NTT
|
Q8/15
|
2008-01-31 |
|
[ 778 ]
|
Proposal regarding Q5/15 study items for the 2009-2012 study period
|
NTT
|
Q5/15
|
2008-01-31 |
|
[ 777 ]
|
Proposal of a draft for a new supplement regarding the general characteristics of optical fibre under actual use conditions
|
NTT
|
Q5/15
|
2008-01-31 |
|
[ 776 ]
|
Summary of correspondence activity on a new supplement regarding the general characteristics of an optical fibre under actual use conditions
|
NTT
|
Q5/15
|
2008-01-31 |
|
[ 775 ]
|
Additional measurement data for RZ-DQPSK modulation format at 43Gb/s
|
Fujitsu
|
Q6/15
|
2008-01-31 |
|
[ 774 ]
|
Proposal on the definition and measurement method of PDL tolerance for modulation format comparison
|
Fujitsu
|
Q6/15
|
2008-01-31 |
|
[ 773 ]
|
Proposal on requirements for the transportation of Ethernet client over OTN
|
KDDI
|
Q11/15
|
2008-01-31 |
|
[ 772 ]
|
Proposal for Study of Multi-protocol over GEM
|
ZTE
|
Q2/15
|
2008-01-31 |
|
[ 771 ]
|
Proposal for Security Aspect of PLOAM messaging in GPON System
|
ZTE
,
China Netcom
|
Q2/15
|
2008-01-31 |
|
[ 770 ]
|
G.VDSL2: On-line reconfiguration according PMD and PMS-TC layer
|
ZTE
|
Q4/15
|
2008-01-31 |
|
[ 769 ]
|
G.984.4: Management Entity of xDSL OLR function
|
ZTE
|
Q2/15
|
2008-01-31 |
|
[ 768 ]
|
Further Proposal for Key Consistency in GPON System
|
ZTE
,
China Netcom
|
Q2/15
|
2008-01-31 |
|
[ 767 ]
|
Correction to figure 10-6/G.806
|
Huawei
|
Q9/15
|
2008-01-31 |
|
[ 766 ]
|
G.hn: Application-driven Requirements for G.hn
|
Broadcom
,
TI
,
Matsushita
,
Intel
|
Q4/15
|
2008-01-31 |
|
[ 765 ]
|
G.hn: PHY level retransmission and acknowledgement
|
CopperGate Communications
|
Q4/15
|
2008-01-31 |
|
[ 764 ]
|
G.hn: Media Access Rules for Contention Slots
|
CopperGate Communications
|
Q4/15
|
2008-01-31 |
|
[ 763 ]
|
G.hn: Sub-burst slot groups and scheduling policies
|
CopperGate Communications
|
Q4/15
|
2008-01-31 |
|
[ 762 ]
|
G.hn: Transmission opportunities and sub-burst slots
|
CopperGate Communications
|
Q4/15
|
2008-01-31 |
|
[ 761 ]
|
G.hn: Proposal for detailed text on the Media Access Plan (MAP)
|
CopperGate Communications
|
Q4/15
|
2008-01-31 |
|
[ 760 ]
|
G.hn: MAP distribution and MAC cycles
|
CopperGate Communications
|
Q4/15
|
2008-01-31 |
|
[ 759 ]
|
G.hn: Identification of G.hn Devices and Flows in a Domain
|
CopperGate Communications
|
Q4/15
|
2008-01-31 |
|
[ 758 ]
|
G.hn: 12-bit constellation
|
CopperGate Communications
|
Q4/15
|
2008-01-31 |
|
[ 757 ]
|
G.hn: OFDM Symbol generation
|
CopperGate Communications
,
Intellon
|
Q4/15
|
2008-01-31 |
|
[ 756 ]
|
G.hn: FEC scheme
|
CopperGate Communications
,
Intellon
|
Q4/15
|
2008-01-31 |
|
[ 755 ]
|
Updated proposals for 1310 nm 40G application code P1L1 3C1 in G.959.1
|
Finisar
|
Q6/15
|
2008-01-31 |
|
[ 754 ]
|
Proposal for G.8261 Appendix X
|
JDSU
|
Q13/15
|
2008-01-31 |
|
[ 753 ]
|
G.hn: Proposal and working text for G.hn Scrambler
|
Intellon
|
Q4/15
|
2008-01-31 |
|
[ 752 ]
|
G.hn: Proposal and working text for G.hn Robust Communication Mode
|
Intellon
|
Q4/15
|
2008-01-31 |
|
[ 751 ]
|
G.hn: Proposal and working text for G.hn Header Encoding
|
Intellon
|
Q4/15
|
2008-01-31 |
|
[ 750 ]
|
G.hn: Performance of the proposed Turbo Coding Scheme
|
Intellon
|
Q4/15
|
2008-01-31 |
|
[ 749 ]
|
G.hn: Proposal and working text for G.hn payload FEC scheme
|
Intellon
|
Q4/15
|
2008-01-31 |
|
[ 748 ]
|
Addressing packet based methods and profiles in future Q13 work
|
Ericsson
|
Q13/15
|
2008-01-31 |
|
[ 747 ]
|
Editorials and improvements in G.8261
|
Ericsson
|
Q13/15
|
2008-01-31 |
|
[ 746 ]
|
A proposed correction to the state transition of revertive operation in G.8031
|
Republic of Korea
|
Q9/15
|
2008-01-31 |
|
[ 745 ]
|
A5 Reference Proforma for revised G.7712/Y.1703 Recommendation
|
Cisco
|
Q14/15
|
2008-01-30 |
|
[ 744 ]
|
G.lt: Attenuation Measurement
|
Ericsson
,
BT
|
Q4/15
|
2008-01-30 |
|
[ 743 ]
|
G.lt: Uncalibrated Echo Response Measurement
|
Ericsson
|
Q4/15
|
2008-01-30 |
|
[ 742 ]
|
G.lt: Quiet Line Noise Measurement
|
Ericsson
,
BT
|
Q4/15
|
2008-01-30 |
|
[ 741 ]
|
ADSL, VDSL, SHDSL: Next-Generation LINK/PHY Layer Interface
|
Alcatel-Lucent Bell N.V
|
Q4/15
|
2008-01-30 |
|
[ 740 ]
|
G.lt: Test Management and Communications
|
BT
,
Ericsson
|
Q4/15
|
2008-01-30 |
|
[ 739 ]
|
G.lt: Impulse Noise Measurement
|
BT
|
Q4/15
|
2008-01-30 |
Results:289 total items. Result page:
Previous -
1 -
2 -
3 -
4 -
5 -
6
- Next
|
Multiple Document Download: Formats and Languages to be included (when available):