International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG15 : Meeting 2007-06-04 : Contributions  Recently posted -  Search Meeting Documents
   
ITU-T SG15  C (2007-06-04) 

ITU-T SG15

Optical and other transport network infrastructures

Study Period 2005

Meeting  from 2007-06-04 to 2007-06-15

held in Switzerland [Geneva]

Other Meetings : 2008-12-01  2008-02-11  2006-10-30  2006-02-06  2005-05-16  2004-11-29 

Results:332 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7  - Next Next
Contributions  Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 549 ]  
 
WITHDRAWN - See C397     N/A     N/A
[ 548 ]  
 
G.vdsl: Comparison between improved Logging and Histograms     Alcatel-Lucent Bell   Q4/15   2007-05-25
[ 547 ]  
 
G.VDSL, G.ploam: Improved Impulse Noise Logging: Proposed Working Text     Alcatel-Lucent Bell   Q4/15   2007-05-25
[ 546 ]  
 
G.vdsl: Calculations and impact of non-consecutive impulse noise     Alcatel-Lucent Bell   Q4/15   2007-05-25
[ 545 ]  
 
G.ploam: Full Proposed Text for Equalized FEXT UPBO method in VDSL2     Alcatel-Lucent Bell   Q4/15   2007-05-25
[ 544 ]  
 
G.vdsl: Single Method for FEXT Cancellation     Alcatel-Lucent Bell   Q4/15   2007-05-25
[ 543 ]  
 
G.vdsl: Information required for decision on FEXT cancellation     Alcatel-Lucent Bell, , Ericsson , Nokia Siemens Networks,   Q4/15   2007-05-25
[ 542 ]  
 
G.vdsl: Impact of a disorderly leaving event on a precoded VDSL2 system     Alcatel-Lucent Bell   Q4/15   2007-05-25
[ 541 ]  
 
G.vdsl: Need for backward compatibility with respect to FEXT cancellation methods     Alcatel-Lucent Bell   Q4/15   2007-05-25
[ 540 ]  
 
G.vdsl: On the tracking speed required for changing crosstalk channels     Alcatel-Lucent Bell   Q4/15   2007-05-25
[ 539 ]  
 
G.vdsl: Information required for decision on FEXT cancellation : method based on reporting of Hchannel(f)     Alcatel-Lucent Bell   Q4/15   2007-05-25
[ 538 ]  
 
G.vdsl: Information required for decision on FEXT cancellation : method based on reporting of Error(f)     Alcatel-Lucent Bell   Q4/15   2007-05-25
[ 537 ]  
 
Considerations of FEC using 32 byte interleaved RS(255,239) codecs for OTU4 in G.709     ETRI   Q11/15   2007-05-26
[ 536 ]  
 
G.VDSL: Improved Impulse Noise Logging: Overview     Alcatel-Lucent Bell   Q4/15   2007-05-25
[ 535 ]  
 
Proposal on state transition tables for T-MPLS linear protection switching     ETRI, , Huawei Technologies   Q9/15   2007-05-25
[ 534 ]  
 
Proposal to study Ethernet transparency over OTN     NTT   Q11/15   2007-05-25
[ 533 ]  
 
Items under study in Q12     BT   Q12/15   2007-05-25
[ 532 ]  
 
Proposed clarification of GFP mapping for OSI protocols     Tellabs Oy   Q11/15   2007-05-25
[ 531 ]  
 
Support of 1 Gbps and 10Gbps Ethernet remote failures via GFP CMF/CSF     Tellabs Oy   Q11/15, Q9/15   2007-05-25
[ 530 ]  
 
Proposal to continue consideration of OTU4 bit rate     NTT   Q6/15, Q11/15   2007-05-25
[ 529 ]  
 
Proposal to clarify the characteristics of Ethernet transport over OTN     NTT , NEC , Mitsubishi , NICT , KDDI   Q11/15   2007-05-25
[ 528 ]  
 
WITHDRAWN - See C527     N/A     N/A
[ 527 ]  
 
Spectral excursion measurements with NRZ-DPSK modulation format     Alcatel-Lucent, Germany   Q6/15   2007-05-25
[ 526 ]  
 
Comments on G.SUP42     Mitsubishi electric Corp.   Q1/15   2007-05-25
[ 525 ]  
 
Proposal for Ethernet Rings Protection Switching Mechanisms     NTT , Nokia Siemens Networks GmbH & Co. KG   Q9/15   2007-05-25
[ 524 ]  
 
Proposal of ERP initial state     NTT   Q9/15   2007-05-25
[ 523 ]  
 
Proposal of identification of APS frame     NTT   Q9/15   2007-05-25
[ 522 ]  
 
Proposal of range restrictions for transmission of APS frame     NTT   Q9/15   2007-05-25
[ 521 ]  
 
G.lt: Management of Line Test     BT   Q4/15   2007-05-25
[ 520 ]  
 
G.vdsl: Proposal for New Recommendation on FEXT Cancellation for use with VDSL2 Transceivers     Actelis Networks   Q4/15   2007-05-25
[ 519 ]  
 
G.vdsl2: Upzide's answers to Alcatel's vectoring questions.     Upzide Labs   Q4/15   2007-05-25
[ 518 ]  
 
G.vdsl2: Upzide's answers to Adtran's vectoring questions.     Upzide Labs   Q4/15   2007-05-25
[ 517 ]  
 
WITHDRAWN - See C495     N/A   Q13/15   N/A
[ 516 ]  
 
G.gen: High INPmin using retransmission     British Telecommunications plc   Q4/15   2007-05-25
[ 515 ]  
 
WITHDRAWN - See C494     N/A     N/A
[ 514 ]  
 
Proposed study items for packet based transport technologies for the next study period (2009-2012)     NTT   Q12/15, Q11/15, Q9/15, Q3/15   2007-05-25
[ 513 ]  
 
Proposed update for "Optical Transport Networks & Technologies Standardization Work Plan"     NTT   Q3/15   2007-05-25
[ 512 ]  
 
A proposed modification to the response to DNR in G.8031v2     ETRI   Q9/15   2007-05-25
[ 511 ]  
 
G.vdsl: Update of the channel estimation matrix during the insertion of a new user     France Telecom   Q4/15   2007-05-25
[ 510 ]  
 
Correspondence activity on the alignment of nomenclature in G.666 and G.650.2     Deutsche Telekom   Q5/15, Q7/15   2007-05-25
[ 509 ]  
 
Appendix I of G.666: Polarisation control in front of the PMD emulator     Deutsche Telekom   Q7/15   2007-05-25
[ 508 ]  
 
Upgradeability considerations for Supplement G.Sup.41     France Telecom   Q8/15   2007-05-25
[ 507 ]  
 
Proposal to Update IETF RFC Reference in G.7712     Cisco Systems Inc.   Q14/15   2007-05-25
[ 506 ]  
 
Explanation of G.pacxyz structure for the scope chapter of the recommendations     Deutsche Telekom   Q13/15   2007-05-25
[ 505 ]  
 
Synchronization signal and E-SSM path continuity     Cisco   Q13/15   2007-05-25
[ 504 ]  
 
Option for E-OAM supporting E-SSM transmission     Cisco   Q13/15   2007-05-25
[ 503 ]  
 
G.VDSL: Further information for the SOS proposal     Sumitomo Electric Industries Ltd., , NEC Corporation   Q4/15   2007-05-25
[ 502 ]  
 
G.VDSL,Ploam: Modifications in G.993.2 and G.997.1 for SOS functionality     Sumitomo Electric Industries Ltd., , NEC Corporation   Q4/15   2007-05-25
[ 501 ]  
 
G.gen: ADSL PEIN Events Captured on BT Lines     BT   Q4/15   2007-05-24
[ 500 ]  
 
Proposals for EEC Network Limits (Clause 7.2.1 in G.8261)     Ericsson   Q13/15   2007-05-24
Results:332 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2024-9-26