International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG15 : Meeting 2005-05-16 : Delayed Contributions  Recently posted -  Search Meeting Documents
   
ITU-T SG15  D (2005-05-16) 

ITU-T SG15

Optical and other transport network infrastructures

Study Period 2005

Meeting  from 2005-05-16 to 2005-05-27

held in Switzerland [Geneva]

Other Meetings : 2008-12-01  2008-02-11  2007-06-04  2006-10-30  2006-02-06  [ 2005-05-16 ]  2004-11-29 

Results:25 total items.
Delayed Contributions  [ Source: Alcatel ]   Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 446 ]  
 
Addition of subnetwork fragment to G.805 and G.8010     Alcatel   Q12/15   2005-05-06
[ 420 ]  
 
GFP CSF Considerations     Alcatel   Q12/15, Q11/15, Q9/15   2005-05-05
[ 419 ]  
 
Comments on G.motnni     Alcatel   Q11/15   2005-05-05
[ 418 ]  
 
Ethernet Counters     Alcatel   Q9/15   2005-05-05
[ 417 ]  
 
MPLS over Transport (Sn-Xv/MPLS_A)     Alcatel   Q9/15   2005-05-05
[ 416 ]  
 
Transport MPLS Definition     Alcatel   Q12/15, Q11/15, Q9/15   2005-05-05
[ 415 ]  
 
Integrating ETH layer and EVC sublayer in G.8010     Alcatel   Q12/15   2005-05-05
[ 394 ]  
 
G.VDSL: VDSL2 Performance loss in dual latency path operation with interleaving on both paths     Alcatel Bell   Q4/15   2005-05-04
[ 385 ]  
 
Application codes at 2.5 G in G.dapp     Alcatel   Q6/15   2005-05-04
[ 384 ]  
 
Spectral excursion of 2.5Gb/s DML for G.dapp     Alcatel   Q6/15   2005-05-04
[ 374 ]  
 
Draft VDSL2 text improvements for section 7, annex K and annex N     Alcatel Bell   Q4/15   2005-05-04
[ 373 ]  
 
VDSL2: Proposal for support of multiple bearer channels to be optional     Alcatel Bell   Q4/15   2005-05-04
[ 370 ]  
 
G.VDSL: VDSL2 Virtual Noise Mechanism: Proposed update of working text     Alcatel Bell   Q4/15   2005-05-04
[ 369 ]  
 
G.VDSL: VDSL2 PSD Mask Control: Proposed Update of working text     Alcatel Bell   Q4/15   2005-05-04
[ 362 ]  
 
ETH AIS processing in p2p and mp connections     Alcatel   Q9/15   2005-05-04
[ 347 ]  
 
Proposed text for G.pactiming Annex A     Alcatel   Q13/15   2005-05-03
[ 345 ]  
 
Considerations on Layer Adjacency Discovery     Alcatel SEL AG , Tellabs Oy , Lucent Technologies (Germany)   Q14/15   2005-05-03
[ 314 ]  
 
Ethernet Data Communication Channel (DCC)     Alcatel   Q14/15, Q12/15, Q11/15   2005-05-04
[ 276 ]  
 
Proposed text for G.pactiming     Alcatel   Q13/15   2005-05-02
[ 275 ]  
 
Requirements of G.modem synchroniser and desynchronizer     Alcatel   Q13/15   2005-05-02
[ 274 ]  
 
Add 2 Mbit/s output jitter specification in G.813     Alcatel   Q13/15   2005-05-02
[ 273 ]  
 
Fast Re-Route (FRR) protection when node and link fail in MPLS network     Alcatel Shanghai Bell   Q9/15   2005-05-02
[ 254 ]  
 
MPLS protection architecture     Alcatel   Q12/15   2005-05-04
[ 207 ]  
 
ADSL: REIN Coding for ADSL2+     Adtran , Infineon , Texas Instruments , BellSouth , Verizon , Alcatel USA , Aware , SBC   Q4/15   2005-04-27
[ 203 ]  
 
G.vdsl: Interleaving on the second latency path     Ikanos , Lucent Technologies , Conexant , Alcatel USA   Q4/15   2005-04-27
Results:25 total items.
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2024-5-17