International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG13 : Contributions  Recently posted -  Search Meeting Documents
   
ITU-T SG13  C 

ITU-T SG13

Project management and coordination; Architectures and internetworking principles; Multi-protocol networks and mechanisms; Network performance and resource management

Study Period 2005

Results:86 total items.
Result page:  1 - 2 - 3 - 4  - Next Next
Contributions  [ Questions: Q4/13 ]   Documents / Contributions
 
Number 
Received Source Title Questions
[ 551 ]  
 
2008-01-11 China Telecom   Proposal on adding study item and task in Q13/SG12 for IPTV performance monitoring     Q4/13, IPTV-GSI  
[ 545 ]  
 
2008-01-09 ETRI   Proposed General Architecture in Y.ngn-account-R2     Q4/13, Q2/13  
[ 543 ]  
 
2008-01-08 ETRI   Proposed Modification of the Clause 9 Procedures in Y.mpm     Q4/13  
[ 542 ]  
(Rev.1) 
2008-01-08 ETRI   Additional description on Rn and Rc reference point for y.racf-mpls centralized architecture     Q4/13  
[ 541 ]  
 
2008-01-08 ETRI   Proposed Modification of the Clause 7. Reference Measurement Network Model in Y.mpm     Q4/13  
[ 537 ]  
 
2008-01-08 ETRI   Proposed Modification of the Clause 8.3. Reference Points in Y.mpm     Q4/13  
[ 536 ]  
 
2008-01-08 ETRI   Proposed Modification of the Clause 8.2. Functional Architecture in Y.mpm     Q4/13  
[ 535 ]  
 
2008-01-08 ETRI   Proposed Modification of the Clause 8.1. General Architecture in Y.mpm     Q4/13  
[ 515 ]  
 
2008-01-08 ETRI   Proposed modifications to section 6.2 in Y.enet     Q4/13  
[ 503 ]  
 
2008-01-08 ZTE Corporation   Supplement to Appendix V in Y.RACF R2     Q4/13  
[ 502 ]  
 
2008-01-08 ZTE Corporation   Proposal to add the PD-FE selection function of TRC-FE and PE-FE     Q4/13  
[ 501 ]  
 
2008-01-08 ZTE Corporation   Proposal to add the function of processing the resource control granularity     Q4/13  
[ 500 ]  
 
2008-01-08 ZTE Corporation   Proposal to add new resource control scenarios for nomadism     Q4/13  
[ 499 ]  
 
2008-01-08 ZTE Corporation   Modification to the hand-over procedure     Q4/13  
[ 498 ]  
 
2008-01-08 ZTE Corporation   CPE-requested QoS resource reservation procedure triggered by TRE-FE     Q4/13  
[ 490 ]  
 
2008-01-08 ZTE Corporation   Proposed changes to resource control procedure consideration for Y.racf-mpls     Q4/13  
[ 485 ]  
 
2008-01-08 ZTE Corporation   Proposal on modification of Rn and TRE-FE of Y.RACF     Q4/13  
[ 484 ]  
 
2008-01-08 ZTE Corporation   Proposal on modification of function overview of Y.MPLS-RACF     Q4/13  
[ 480 ]  
 
2008-01-08 ZTE Corporation   Proposal for Resource Control Scenarios for Mobility in RACF     Q4/13  
[ 478 ]  
 
2008-01-08 ZTE Corporation   Modification to the procedure for pull mode in Y.RACF R2     Q4/13  
[ 477 ]  
 
2008-01-08 ZTE Corporation   Add a information component to Rs in Y.RACF R2     Q4/13  
[ 454 ]  
 
2008-01-07 ETRI   Initial Draft on Requirements for Flow Aggregate Parameter Exchange in NGN     Q4/13  
[ 453 ]  
 
2008-01-07 ETRI   Proposed initial document for RACF-MPLS for centralized architecture     Q4/13  
[ 452 ]  
(Rev.1) 
2008-01-07 ETRI   Considerations on mobility aspects of clause 9.3 in Y.RACF(Y.2111)     Q4/13  
[ 446 ]  
 
2008-01-07 Huawei Technologies Co., Ltd.   Proposed changes to Appendix IV     Q4/13  
Results:86 total items.
Result page:  1 - 2 - 3 - 4  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

 

Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2014-9-30