International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG13 : Contributions  Recently posted -  Search Meeting Documents
   
ITU-T SG13  C 

ITU-T SG13

Project management and coordination; Architectures and internetworking principles; Multi-protocol networks and mechanisms; Network performance and resource management

Study Period 2005

Results:564 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16 - 17 - 18 - 19 - 20 - 21 - 22 - 23  - Next Next
Contributions  Documents / Contributions
 
Number 
Received Source Title Questions
[ 264 ]  
 
2007-04-10 KT   Proposed addition of two service features in Y.RTCONV     Q2/13  
[ 263 ]  
 
2007-04-10 Samsung Electronics   Mobile IPTV over Wireless Networks in NGN     QALL/13  
[ 262 ]  
 
2007-04-10 Samsung Electronics   Proposed text for FMC-IMS on service level convergence between PS domains     Q6/13  
[ 261 ]  
 
2007-04-10 Huawei   Comments on MIP/MEP ID     Q5/13  
[ 260 ]  
 
2007-04-10 Huawei   Configuration of MEL Hierarchy in T-MPLS     Q5/13  
[ 259 ]  
 
2007-04-10 Huawei   Proposed modified texts for NGN R1 Description     Q1/13  
[ 258 ]  
 
2007-04-10 Huawei   Proposed changes to security consideration for Y.123.qos     Q4/13  
[ 257 ]  
 
2007-04-10 Huawei   Multicasting Extension of NACF     Q4/13  
[ 256 ]  
 
2007-04-10 Huawei   The updated texts of Y.ngn-mcastfa (Functional Architecture of NGN Multicast)     Q8/13  
[ 255 ]  
 
2007-04-10 Huawei   Proposal to modify scenarios to Y.ngn-rtconv     Q2/13  
[ 254 ]  
 
2007-04-10 Huawei   Multicast Dynamic Scenario     Q4/13  
[ 253 ]  
 
2007-04-10 Huawei   The proposal for the HGWC-FE and related interfaces     Q3/13  
[ 252 ]  
 
2007-04-10 Huawei   Initiating Work on P2P IPTV     Q2/13  
[ 251 ]  
 
2007-04-10 Huawei   Clarification to service feature to Y.ngn-rtconv     Q2/13  
[ 250 ]  
 
2007-04-10 Huawei   Clarification to Multimedia Conference to Y.ngn-rtconv     Q2/13  
[ 249 ]  
 
2007-04-10 Huawei   ATM and Frame Relay network interworking with Ethernet     Q7/13  
[ 248 ]  
 
2007-04-10 Nokia Siemens Networks GmbH & Co KG (Germany)   Comments and Proposed modifications of draft Y.2201 "NGN Release 1 requirements"     Q2/13  
[ 247 ]  
 
2007-04-10 Nokia Siemens Networks GmbH & Co KG (Germany)   Comments and Proposed modifications of draft Y.2701 "NGN security requirements"     Q15/13  
[ 246 ]  
 
2007-04-10 Nokia Siemens Networks GmbH & Co KG (Germany)   Comments and Proposed modification of title and scope of Draft Q.nacf-sec     Q7/11, Q15/13  
[ 245 ]  
 
2007-04-10 RAD Data Communications   Y.gina, Y.ppi, and Y.1401rev - a way forward     Q7/13  
[ 244 ]  
 
2007-04-10 VeriSign   Text for Draft Rec. Y.IdMsec, NGN Identity Management Security     Q15/13  
[ 243 ]  
 
2007-04-10 ZTE   Requirement of QoS Control in Metro network     Q4/13  
[ 242 ]  
 
2007-04-10 ZTE   Proposed text for section 12 of Y.PTDN     Q13/13  
[ 241 ]  
 
2007-04-10 ZTE   Proposed some modifications in Y.NGN AAA     Q15/13  
[ 240 ]  
 
2007-04-10 ZTE   Proposed QoS capability within PTDN     Q13/13  
Results:564 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16 - 17 - 18 - 19 - 20 - 21 - 22 - 23  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

 

Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2008-01-17