International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG13 : Meeting 2008-01-14 : Contributions  Recently posted -  Search Meeting Documents
   
ITU-T SG13  C (2008-01-14) 

ITU-T SG13

Project management and coordination; Architectures and internetworking principles; Multi-protocol networks and mechanisms; Network performance and resource management

Study Period 2005

Meeting  from 2008-01-14 to 2008-01-25

held in Korea (Rep. of) [Seoul]

Other Meetings : 2009-09-01  2009-01-12  2008-09-12  2008-05-22  2007-09-21  2007-04-16  2006-11-03  2006-07-17  2006-01-16  2005-08-29  2005-04-25  2004-12-07 

Results:260 total items.
Result page:   -  1 - 2 - 3 - 4 - 5 - 6  - Next Next
Contributions  Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 535 ]  
 
Proposed Modification of the Clause 8.1. General Architecture in Y.mpm     ETRI   Q4/13   2008-01-08
[ 534 ]  
 
Proposed text of Section 5. NGN release 2 services of 'Supplement NGN Release 2 Scope' document     ETRI   Q1/13   2008-01-08
[ 533 ]  
 
Proposed text of Section 4. NGN release 2 environment overview of 'Supplement NGN Release 2 Scope' document     ETRI   Q1/13   2008-01-08
[ 532 ]  
 
Proposed text of Section 2. References of 'Supplement NGN Release 2 Scope' document     ETRI   Q1/13   2008-01-08
[ 531 ]  
 
Proposed text of Section 2. References of 'Supplement NGN Release 2 Scope' document     ETRI   Q1/13   2008-01-08
[ 530 ]  
 
Proposed text of Bibliography of 'Supplement NGN Release 2 Scope' document     ETRI   Q1/13   2008-01-08
[ 529 ]  
 
Restructured text of Draft 'Supplement NGN Release 2 Scope' document     ETRI   Q1/13   2008-01-08
[ 528 ]  
 
Revised Text for Draft Recommendation Q.HCF (v0.8)     ETRI   Q2/19, Q6/13   2008-01-11
[ 527 ]  
 
Revision of Section 8.4 in Q.MMF     ETRI   Q2/19, Q6/13   2008-01-11
[ 526 ]  
 
Text on Transport Level Convergence for Draft Rec. FMC-IMS     Samsung Electronics   Q5/19, Q6/13   2008-01-11
[ 525 ]  
 
Proposed restructuring of Q.FMC-IMS     ZTE Corporation , Samsung Electronics Ltd.   Q5/19, Q6/13   2008-01-11
[ 524 ]  
 
Draft Recommendation Y.NGN-DSL: Roadmap for DSL based systems in Next Generation Networks     ETRI   Q3/13   2008-01-08
[ 523 ]  
 
Proposed Revisions in Section 6 "Requirement" of Y.mpls-mob     ETRI   Q2/13   2008-01-08
[ 522 ]  
 
Missing functional requirements and relationship of clause 8 with clause 7 of Y.ngn-mcastsf     ETRI   Q2/13   2008-01-08
[ 521 ]  
 
Proposed modifications on appendices of Y.ngn-mcastsf     ETRI   Q2/13   2008-01-08
[ 520 ]  
 
Proposal for adding policy enabling capability to open service environment     ETRI   Q2/13   2008-01-08
[ 519 ]  
 
New Question on Distributed IP Services Network(DISN)     China Mobile, ZTE Corporation, Huawei Technologies   FUTURES, QALL/13   2008-01-08
[ 518 ]  
 
New Question: Multi-connection in the heterogeneous access transport network environment     China Mobile, Huawei Technologies Co. Ltd   QALL/13, FUTURES   2008-01-08
[ 517 ]  
 
Proposed new Question on Impact of Intelligent Terminals to NGN Architecture     ZTE Corporation   Futures, QALL/13;   2008-01-08
[ 516 ]  
 
Non-NGN related high level requirements to support USN applications and services     ETRI   Q2/13   2008-01-08
[ 515 ]  
 
Proposed modifications to section 6.2 in Y.enet     ETRI   Q4/13   2008-01-08
[ 514 ]  
 
Moving away from the concept of Releases and Release Planning as we move into the 2009 - 2012 Study Period     Nortel Networks (Canada)   PLENARY, QALL/13   2008-01-08
[ 513 ]  
 
Proposal to accept SG 13 TD 288 (PLEN) as the baseline text for the IPTV services requirements draft Recommendation     Nortel Networks (Canada)   Q2/13   2008-01-08
[ 512 ]  
 
Consideration of IPTV Deliverables     Canada   QALL/13   2008-01-08
[ 511 ]  
 
Proposal to accept FG IPTV-DOC-0181 as the baseline text for the IPTV Architecture draft Recommendation     Nortel Networks (Canada)   Q3/13   2008-01-08
[ 510 ]  
 
Proposed text for a continuation of Q.1/13     Nortel Networks (Canada)   Q1/13   2008-01-08
[ 509 ]  
(Rev.1) 
Proposed text for Y.NGN-R2-Reqts "Requirements for IPv6 migration in NGN Release 2"     ETRI   Q9/13, Q2/13   2008-01-08
[ 508 ]  
 
New Transport Functions in NGN FRA R2     ETRI   Q3/13   2008-01-08
[ 507 ]  
 
Mobility functional elements in NGN FRA R2     ETRI   2/19, 3/13   2008-01-08
[ 506 ]  
 
Impact of NGN Architecture by Intelligent Terminals     ZTE Corporation   FUTURES, Q3/13   2008-01-08
[ 505 ]  
 
Proposal for content provider functions within Y.NGN-FRA R2     ZTE Corporation   Q3/13   2008-01-08
[ 504 ]  
 
Proposed deployment mode of Y.cmr     ZTE Corporation   Q8/13   2008-01-08
[ 503 ]  
 
Supplement to Appendix V in Y.RACF R2     ZTE Corporation   Q4/13   2008-01-08
[ 502 ]  
 
Proposal to add the PD-FE selection function of TRC-FE and PE-FE     ZTE Corporation   Q4/13   2008-01-08
[ 501 ]  
 
Proposal to add the function of processing the resource control granularity     ZTE Corporation   Q4/13   2008-01-08
[ 500 ]  
 
Proposal to add new resource control scenarios for nomadism     ZTE Corporation   Q4/13   2008-01-08
[ 499 ]  
 
Modification to the hand-over procedure     ZTE Corporation   Q4/13   2008-01-08
[ 498 ]  
 
CPE-requested QoS resource reservation procedure triggered by TRE-FE     ZTE Corporation   Q4/13   2008-01-08
[ 497 ]  
 
Proposed Summary content for Y.cmr     ZTE Corporation   Q8/13   2008-01-08
[ 496 ]  
 
Rationale and scenario for CIRs aggregation function     ZTE Corporation   Q2/13   2008-01-08
[ 495 ]  
 
Proposed use case for Y.cmr     ZTE Corporation   Q8/13   2008-01-08
[ 494 ]  
 
Proposal to add cache function to CTF     ZTE Corporation   Q2/13   2008-01-08
[ 493 ]  
 
Proposal to add a scenario of RACF based charging and accounting     ZTE Corporation   Q2/13   2008-01-08
[ 492 ]  
 
Proposed modifications of draft Recommendation Q.HCF (version 0.6)     ZTE Corporation   Q2/19, Q5/13   2008-01-08
[ 491 ]  
 
Proposed definition for Y.cmr     ZTE Corporation   Q8/13   2008-01-08
[ 490 ]  
 
Proposed changes to resource control procedure consideration for Y.racf-mpls     ZTE Corporation   Q4/13   2008-01-08
[ 489 ]  
 
Proposed architecture and functional requirements for PBA     ZTE Corporation   Q2/13   2008-01-08
[ 488 ]  
 
Propose to extend multicast service control scenario of Y.ngn-mcastfa     ZTE Corporation   Q3/13   2008-01-08
[ 487 ]  
 
Propose to extend multicast applications service control of Y.ngn-mcastfa     ZTE Corporation   Q3/13   2008-01-08
[ 486 ]  
 
Proposal to modification to Section 10.3.3.15 of Y.NGN-FRA R2     ZTE Corporation   Q3/13   2008-01-08
Results:260 total items.
Result page:   -  1 - 2 - 3 - 4 - 5 - 6  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2024-9-24