International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG06 : Meeting 2007-11-19 : Temporary Documents  Recently posted -  Search Meeting Documents
   
ITU-T SG06  TD (2007-11-19) 

ITU-T SG06

Outside plant and related indoor installations

Study Period 2005

Meeting  from 2007-11-19 to 2007-11-23

held in Switzerland [Geneva]

Other Meetings : 2009-10-12  2008-12-01  2008-04-14  [ 2007-11-19 ]  2007-05-14  2006-09-19  2005-12-12  2005-01-31 

Results:61 total items.
Result page:  1 - 2  - Next Next
Temporary Documents  (GEN)   Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 322-GEN ]  
 
Final list of participants     TSB   QALL/6   2007-11-23
[ 321-GEN ]  
 
OUTGOING LS - Draft LS to ITU-T SG4 on OSS requirements works     Rapporteur Q4/6   Q4/6   2007-11-22
[ 320-GEN ]  
 
First revised draft for Qx/6 for next Study Period     Rapporteur Q4/6   Q4/6   2007-11-22
[ 319-GEN ]  
(Rev.1) 
Draft Report of the fourth meeting of Study Group 6 "Outside plant and related indoor installations" (Geneva, 19-23 November 2007)     TSB   QALL/6   2007-11-23
[ 318-GEN ]  
 
OUTGOING LS - Reply to Q1/15 onupdate on Access Network activities in SG6     Liaison Officer to SG15   QALL/6   2007-11-22
[ 317-GEN ]  
 
Draft new ITU-T Recommendation L.irud "Methods for inspecting and repairing underground PVC ducts" (for consent)     Editor Rec. L.irud   Q2/6   2007-11-22
[ 316-GEN ]  
 
Draft new ITU-T Recommendation L.35 Appendix II "Korean experience on access network installation procedures" (for agreement)     Editor Rec. L.35   Q2/6   2007-11-22
[ 315-GEN ]  
 
Draft new ITU-T Recommendation L.mct "Maintenance of cable tunnels" (for consent)     Editor Rec. L.mct   Q2/6   2007-11-22
[ 314-GEN ]  
(Rev.1) 
Draft WP 2/6 Report (Application of products)     Chairman WP2/6   Q9/6, Q8/6, Q7/6, Q6/6, Q5/6   2007-11-22
[ 313-GEN ]  
(Rev.1) 
Draft WP 1/6 Report (Infrastructures and Environment)     Chairman WP1/6   Q4/6, Q3/6, Q2/6, Q1/6   2007-11-22
[ 312-GEN ]  
 
Study plan of Q5/6 for the next study period     Rapporteur Q5/6   Q5/6   2007-11-22
[ 311-GEN ]  
(Rev.1) 
Technical Paper LS.GUIDE "Guide on the use of ITU-T L-series Recommendations" - Version 0.2     TSB   QALL/6   2007-11-23
[ 310-GEN ]  
 
First draft for Qx/6 for next Study Period     Rapporteur Q4/6   Q4/6   2007-11-22
[ 309-GEN ]  
 
Invitation to hold the next SG6 meeting in China, 14-18 April 2008     Chairman SG6   QALL/6   2007-11-22
[ 308-GEN ]  
 
Creating a Regional Group: Brazil's response to ITU-T Study Groups and Proposal of an Action Plan     SG6 Focal Point - Regional Groups   QALL/6   2007-11-22
[ 307-GEN ]  
(Rev.1) 
Study plan of Q7/6 for the next study period     Rapporteur Q7/6   Q7/6   2007-11-23
[ 306-GEN ]  
 
Draft of Q8/6 for next Study Period     Rapporteur Q8/6   Q8/6   2007-11-21
[ 305-GEN ]  
(Rev.1) 
Study plan of Q6/6 for the next study period     Rapporteur Q6/6   Q6/6   2007-11-21
[ 304-GEN ]  
 
ETSI TS 102 566 V1.1.1 (2007-09) - Common Requirements for Automated Distribution Frames (ADF) at the street cabinet     Chairman SG6   QALL/6   2007-11-21
[ 303-GEN ]  
 
Draft new ITU-T Recommendation L.cis "Installation of optical fibre cables inside sewer ducts"     Editor Rec. L.cis   Q7/6, Q2/6   N/A
[ 302-GEN ]  
(Rev.1) 
First draft of Q2/6 for next Study Period     Rapporteur Q2/6   Q2/6   2007-11-19
[ 301-GEN ]  
(Rev.1) 
Status of texts under WTSA-04 Resolution 1 Procedures     TSB   QALL/6   2007-11-19
[ 300-GEN ]  
 
LS - SG2, Lead Study Group on Service Definition, Numbering, and Routing; Lead Study Group for Telecommunication for Disaster Relief/Early Warning     ITU-T SG2   QALL/6   2007-11-13
[ 299-GEN ]  
 
Liaison report of the October meeting of SC86A     Liaison Officer for IEC SC86A   Q7/6, Q2/6   2007-11-09
[ 298-GEN ]  
 
LS - Cable construction and installation Recommendations     SC86A Liaison Officer   Q7/6, Q2/6   2007-11-09
[ 297-GEN ]  
 
Draft new Recommendation: "Operations support system requirements for infrastructure and network elements management using ID technology"     Rapporteur Q4/6   Q4/6   2007-11-09
[ 296-GEN ]  
(Rev.1-2) 
Draft revised Recommendation L.36, including comments by IEC 86A-B (for consent)     Rapporteur Q9/6   Q9/6   2007-11-09
[ 295-GEN ]  
 
L.36: draft revised text, including comments by IEC 86A-B ; change log     Rapporteur Q9/6   Q9/6   2007-11-09
[ 294-GEN ]  
(Rev.1) 
Draft revised Recommendation L.12, including comments by IEC 86A-B (for consent)     Rapporteur Q9/6   Q9/6   2007-11-07
[ 293-GEN ]  
 
L.12 : draft revised text, including comments by IEC 86A-B ; change log     Rapporteur Q9/6   Q9/6   2007-11-07
[ 292-GEN ]  
(Rev.1) 
Updated Draft new ITU-T Recommendation L.cobroa "Design, construction, and installation of copper networks for broadband access including copper networks connected to optical fibre networks" (for consent)     Rapporteur Q5/6   Q5/6   2007-11-07
[ 291-GEN ]  
 
LS - Report on the 6th FG IPTV meeting     FG IPTV   QALL/6   2007-11-02
[ 290-GEN ]  
(Rev.1-3) 
Revised draft for new Recommendation L.andb "Database for optical access network infrastructure" (for consent)     Editor Rec. L.andb   Q8/6   2007-10-29
[ 289-GEN ]  
 
Revised draft recommendation L.59 "Optical fibre cables for indoor application" (for consent)     Rapporteur Q7/6   Q7/6   2007-10-29
[ 288-GEN ]  
(Rev.1) 
Summary of replies to TSB Circular 156     Rapporteur Q7/6   Q7/6   2007-10-29
[ 287-GEN ]  
(Rev.1) 
Summary of replies to TSB Circular 157     Rapporteur Q7/6   Q7/6   2007-10-29
[ 286-GEN ]  
 
LS - Report to TSAG on Achievements of SG 17 as the Lead Study Group on Telecommunication Security since its meeting on 6-18 December 2006     ITU-T SG 17   QALL/6   2007-10-23
[ 285-GEN ]  
 
LS - LS on Action plan of the QoS flagship Group     ITU-T Study Group 12   QALL/6   2007-10-19
[ 284-GEN ]  
 
LS - LS on the Creation of a Focus Group on "From/In/To Cars Communications II"     ITU-T Study Group 12   QALL/6   2007-10-19
[ 283-GEN ]  
 
LS - Reply LS to TSAG and ITU-T Restructuring Correspondence Group     ITU-T Study Group 12   QALL/6   2007-10-19
[ 282-GEN ]  
 
LS - Technical Output of Focus Group on Identity Management (FG IdM)     ITU-T SG17   QALL/6   2007-10-03
[ 281-GEN ]  
 
LS - Rechartering of the NGN Management Focus Group     ITU-T SG4   QALL/6   2007-09-20
[ 280-GEN ]  
 
LS - Reply LS to TSAG on creation of ITU-T Restructuring Correspondence Group and request for inputs (TSAG-LS 23)     ITU-T SG4   QALL/6   2007-09-20
[ 279-GEN ]  
 
LS - Report of FG IPTV progress and request for comment     FG IPTV   QALL/6   2007-08-03
[ 278-GEN ]  
 
LS - Report of the 3rd JCA-NID meeting held in Geneva on the 3rd of July 2007     JCA-NID Convener   QALL/6   2007-08-03
[ 277-GEN ]  
 
LS - Aspects of common and critical interest to the satellite industry     ICG-SAT   QALL/6   2007-08-03
[ 276-GEN ]  
 
LS - Activities on standardization for Emergency Telecommunications     ICG SAT   QALL/6   2007-08-03
[ 275-GEN ]  
 
LS - New Questions on advanced multimedia systems and on multimedia application platforms and end systems for IPTV     ITU-T SG16   QALL/6   2007-07-13
[ 274-GEN ]  
 
LS - ITU-T activities on bridging the standardization gap     TDAG   QALL/6   2007-07-02
[ 273-GEN ]  
 
LS - Reply to TSAG on creation of ITU-T Restructuring Correspondence Group and request for inputs (TSAG-LS 23)     ITU-T SG15   QALL/6   2007-07-02
Results:61 total items.
Result page:  1 - 2  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2007-07-02