International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG15 : Delayed Contributions  Recently posted -  Search Meeting Documents
   
ITU-T SG15  D 

ITU-T SG15

Optical and other transport networks

Study Period 2001

Results:982 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16 - 17 - 18 - 19 - 20  - Next Next
Delayed Contributions  Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 557 ]  
 
Clarification of the measurement method for G.168 tests 3, 4, and 6     BT   Q6/15   2003-01-07
[ 556 ]  
 
Clarification of the comfort noise requirement in Test 9 of G.168     BT   Q6/15   2003-01-07
[ 555 ]  
 
Proposals to complete the definition of G.168 Test 2C part (c)     BT   Q6/15   2003-01-07
[ 554 ]  
 
Clarification of the test method for Test 15 of G.168     BT   Q6/15   2003-01-07
[ 553 ]  
 
Clarification of the requirement in Test 13 of G.168     BT   Q6/15   2003-01-07
[ 552 ]  
 
Relationship between ERL and echo loss in G.168     BT   Q6/15   2003-01-07
[ 551 ]  
 
Reference to incorrect Figures in G.168 Test 2C     BT   Q6/15   2003-01-07
[ 550 ]  
 
Clarification of the measurement start-time in Tests 2C, 3A and 3B of G.168     BT   Q6/15   2003-01-07
[ 549 ]  
 
G.shdsl.bis: Draft Recommendation Baseline Text (for consent)     Editor Rec. G.shdsl.bis   Q4/15   2003-01-07
[ 548 ]  
 
Draft new Recommendation G.989.3 version 1.3 (for consent)     Editor Rec. G.989.3   Q4/15   2003-01-07
[ 547 ]  
 
ADSL: Inclusion of T1 crosstalk disturbers in OJ-060R1 for evaluation of LDSL systems     Globespan Virata Inc. , Texas Instruments , Paradyne Corp.   Q4/15   2003-01-07
[ 546 ]  
 
ADSL: Performance of Extended FDM mask and ADSL 2, as per OJ-200R1, OJ-200R2, OJ-201, OJ-60R2     Globespan Virata Inc.   Q4/15   2003-01-07
[ 545 ]  
 
Comments on Contribution OJ-052R1     Globespan Virata Inc.   Q4/15   2003-01-07
[ 544 ]  
 
Proposed Edits to the Example PSDs in Draft Appendix V for use in TCM ISDN Environment     Globespan Virata Inc.   Q4/15   2003-01-07
[ 543 ]  
 
G.hs: ADSL: Proposed additional spectral shaping option in G.992.1 Annex I and supporting new handshake code points     Globespan Virata Inc.   Q4/15   2003-01-07
[ 542 ]  
 
PSD for Annex I of G.992.1     Globespan Virata Inc.   Q4/15   2003-01-07
[ 541 ]  
 
Performance of Selectable Mask System for LDSL     Globespan Virata Inc. , Texas Instruments   Q4/15   2003-01-07
[ 540 ]  
 
Spectral Compatibility of Selectable Mask System for LDSL     Globespan Virata Inc. , Texas Instruments   Q4/15   2003-01-07
[ 539 ]  
 
ADSL: Initialization changes to support LDSL     Globespan Virata Inc. , Texas Instruments   Q4/15   2003-01-07
[ 538 ]  
 
Additional Ethernet layer network     Siemens AG   Q12/15   2003-01-06
[ 537 ]  
 
Failure Processing on SPC connections using RSVP-TE signaling mechanism in G.7713.2     ZTE Corporation   Q14/15   2003-01-06
[ 536 ]  
 
Concerns on Disruption Time of Services carried by Virtual Concatenation Method inside SDH Network     ZTE Corporation   Q13/15, Q11/15, Q9/15   2003-01-06
[ 535 ]  
 
Extensional Scheme on SSM (Synchronization Status Message)     ZTE Corporation   Q13/15, Q11/15   2003-01-06
[ 534 ]  
 
Proposal for the General Network Representation of the IEEE 802.1 Based Data Transport Network     ZTE Corporation   Q12/15   2003-01-06
[ 533 ]  
 
Link-state Pass Through scheme for packet service transport over SDH network     Huawei Technologies Co.   Q12/15, Q11/15, Q9/15   2003-01-06
[ 532 ]  
 
Proposal for routing with congruent time slot constraint in G.7715/Y.1706     Huawei Technologies Co.   Q14/15, Q12/15   2003-01-06
[ 531 ]  
 
Add Flow Control Mechanism on SDH trail     Huawei Technologies Co.   Q12/15   2003-01-06
[ 530 ]  
 
Adding RPR layer to G.etna architecture     Huawei Technologies Co.   Q12/15   2003-01-06
[ 529 ]  
 
XYZ Link Connection Protection:One Additional Requirements for XYZ Layer     Huawei Technologies Co.   Q12/15, Q9/15   2003-01-06
[ 528 ]  
 
North American Spectrum Compatibility rules as defined for ADSL necessary but not sufficient to protect ADSL service from interference from new technologies     Ericsson AB   Q4/15   2003-01-06
[ 527 ]  
 
Objective Measures for the Characterization of the Basic Functioning of Noise Reduction Algorithms     Nokia   Q6/15   2003-01-06
[ 526 ]  
 
ADSL2, ADSL+: MEDLEY PRBS Proposal     Aware   Q4/15   2003-01-06
[ 525 ]  
 
G.ploam: Proposed parameters for G.ploam     Aware   Q4/15   2003-01-06
[ 524 ]  
 
ADSL+: Proposal for MIB-Controlled PSD Mask parameters (PSD Toolbox)     Aware , Broadcom , Alcatel USA   Q4/15   2003-01-06
[ 523 ]  
 
GMPLS Routing for ASON Networks     Alcatel , Cisco Systems (USA)   Q14/15, Q12/15   2003-01-06
[ 522 ]  
 
GMPLS OSPF-TE Routing for ASON     Alcatel , Cisco Systems (USA)   Q14/15, Q12/15   2003-01-06
[ 521 ]  
 
Proposed framework of recommendation for RZ formats based STM-64 multi-channel systems     MII China   Q16/15, Q15/15   2003-01-08
[ 520 ]  
 
Proposal to specify RZ formats based STM-64 multi-channel systems     MII China   Q16/15   2003-01-08
[ 519 ]  
 
Protection and Restoration     BT   Q12/15   2003-01-06
[ 518 ]  
 
Domains     BT   Q12/15   2003-01-06
[ 517 ]  
 
ADSL: Proposed Amendment to G.992.2 Annex C for improved robustness and extended reach (for consent)     Centillium Communications , Globespan Virata   Q4/15   2003-01-07
[ 516 ]  
 
ADSL2: Channel discovery phase in G.992.3 Annex C     Centillium Communications   Q4/15   2002-12-23
[ 515 ]  
 
ADSL2: NSC=512 & 1024 for G.adslplus Annex C     Centillium Communications   Q4/15   2002-12-23
[ 514 ]  
 
ADSL: Proposed changes to Draft G.992.1 Revision: Annex C, Annex I and Appendix V (for consent)     Centillium Communications , Globespan Virata   Q4/15   2003-01-07
[ 513 ]  
 
ADSL2: Optional NSC=1024 mode for G.992.1 Annex I     Centillium Communications   Q4/15   2002-12-23
[ 512 ]  
 
ADSL: Additional pilot tone for G.992.1 Annex I     Centillium Communications   Q4/15   2002-12-23
[ 511 ]  
 
G.hsbis: Proposed enhancement to G.994.1 Annex C startup signals     Centillium Communication , Globespan Virata   Q4/15   2002-12-23
[ 510 ]  
 
ADSL2: Feasibility and benefit of Extended Bit loading beyond 15 bits/bin     Centillium Communications   Q4/15   2002-12-23
[ 509 ]  
 
Circuit Emulation over Ethernet Networks     SBC , Agere Systems , Nortel Networks (USA)   Q19/15, Q12/15, Q2/15, Q1/15   2002-12-20
[ 508 ]  
 
Transport Mechanism based on LAPD for Automatic Discovery Messages     Nortel Networks (USA)   Q14/15, Q12/15   2002-12-20
Results:982 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16 - 17 - 18 - 19 - 20  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2003-10-13