Delayed Contributions |
|
Number
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 582 ]
|
ADSL: Annex J: Impact of extended upstream systems on ADSL Annex A
|
Broadcom
|
Q4/15
|
2003-01-08 |
|
[ 581 ]
|
G.hs: G.994.1 Tones for ADSL2 ADL Annexes
|
Broadcom
|
Q4/15
|
2003-01-08 |
|
[ 580 ]
|
Draft revised Recommendation G.997.1 (for consent)
|
Editor Rec. G.997.1
|
Q4/15
|
2003-01-08 |
|
[ 579 ]
|
ADSL2: Issues in G.992.3 Annex C and G.adslplus Annex C
|
Centillium Communications
|
Q4/15
|
2003-01-08 |
|
[ 578 ]
|
ADSL2: Loop Diagnostics mode in G.992.3 Annex C
|
Centillium Communications
|
Q4/15
|
2003-01-08 |
|
[ 577 ]
|
ADSL2: Issues in G.992.3 L2 mode
|
Centillium Communications
|
Q4/15
|
2003-01-08 |
|
[ 576 ]
|
Proposed FEC schemes for Annex of new Rec. G.975.x
|
NEC
|
Q16/15, Q11/15, Q9/15, Q18/15
|
2003-01-08 |
|
[ 575 ]
|
Protection and Restoration of Inter Domain Failures for Rerouting Domains
|
BT
|
Q12/15
|
2003-01-08 |
|
[ 574 ]
|
Proposed modifications to G.691
|
Nortel Networks (Europe)
|
Q16/15
|
2003-01-08 |
|
[ 573 ]
|
Draft Revised Recommendation G.959.1 version 7.5 (for consent)
|
Editor Rec. G.959.1
|
Q16/15
|
2003-01-08 |
|
[ 572 ]
(Rev.1) |
ISDN and ADSL in Japan
|
BB Technology Corp.
|
Q4/15, Q3/15
|
2003-01-08 |
|
[ 571 ]
|
Transmitting filter for TCM ISDN
|
BB Technology Corp.
|
Q4/15, Q3/15
|
2003-01-08 |
|
[ 570 ]
|
TDD & FDD Near Customer Impact Into Upstream Channel Performance Reference Curb
|
BB Technology Corp.º
|
Q4/15
|
2003-01-08 |
|
[ 569 ]
|
ADSL: Proposed Appendix for an extension to G.992.1 Annex I to support higher data rates
|
Centillium Communications
|
Q4/15
|
2003-01-08 |
|
[ 568 ]
|
Proposed optical monitoring configuration, objectives, methods and implementation to be considered in draft Rec. G.optmon on optical monitoring
|
Italy
|
Q16/15
|
2003-01-07 |
|
[ 567 ]
|
List of the possible main system impairments and related optical parameters to be considered in draft Rec. G.optmon on optical monitoring
|
Italy
|
Q16/15
|
2003-01-07 |
|
[ 566 ]
|
Proposed modifications for section 12.1 (Transverse Compatibility) of G.Sup.dsn
|
Italy
|
Q16/15
|
2003-01-07 |
|
[ 565 ]
|
Delta document for G.omci.newservices (for consent)
|
Editor Rec. G.omci
|
Q2/15
|
2003-01-07 |
|
[ 564 ]
|
G.shdsl.bis:Proposal for Enhanced SHDSL using 16-TCPAM and 32-TCPAM
|
Adtran
,
Bellsouth
|
Q4/15
|
2003-01-07 |
|
[ 563 ]
|
Comparison of ADSL2 Annex J and Enhanced SHDSL in a Mixed Disturber Environment
|
Adtran
|
Q4/15
|
2003-01-07 |
|
[ 562 ]
|
Performance Evaluation of Dynamically Optimized Spectra for LDSL
|
Adtran
|
Q4/15
|
2003-01-07 |
|
[ 561 ]
|
G.shdsl.bis: Performance Evaluation of Proposed Enhanced SHDSL PSDs
|
Adtran
|
Q4/15
|
2003-01-07 |
|
[ 560 ]
|
G.shdsl.bis: Spectral Compatibility Evaluation of Proposed Enhanced SHDSL PSDs
|
Adtran
|
Q4/15
|
2003-01-07 |
|
[ 559 ]
|
G.shdsl.bis: Proposal for Enhanced SHDSL using 16-TCPAM and 32-TCPAM
|
Adtran
,
Metalink
,
Infineon
,
Conexant
|
Q4/15
|
2003-01-07 |
|
[ 558 ]
|
G.shdsl-bis: Applications and Deployment Scenarios
|
Adtran
,
Bellsouth
|
Q4/15
|
2003-01-07 |
|
[ 557 ]
|
Clarification of the measurement method for G.168 tests 3, 4, and 6
|
BT
|
Q6/15
|
2003-01-07 |
|
[ 556 ]
|
Clarification of the comfort noise requirement in Test 9 of G.168
|
BT
|
Q6/15
|
2003-01-07 |
|
[ 555 ]
|
Proposals to complete the definition of G.168 Test 2C part (c)
|
BT
|
Q6/15
|
2003-01-07 |
|
[ 554 ]
|
Clarification of the test method for Test 15 of G.168
|
BT
|
Q6/15
|
2003-01-07 |
|
[ 553 ]
|
Clarification of the requirement in Test 13 of G.168
|
BT
|
Q6/15
|
2003-01-07 |
|
[ 552 ]
|
Relationship between ERL and echo loss in G.168
|
BT
|
Q6/15
|
2003-01-07 |
|
[ 551 ]
|
Reference to incorrect Figures in G.168 Test 2C
|
BT
|
Q6/15
|
2003-01-07 |
|
[ 550 ]
|
Clarification of the measurement start-time in Tests 2C, 3A and 3B of G.168
|
BT
|
Q6/15
|
2003-01-07 |
|
[ 549 ]
|
G.shdsl.bis: Draft Recommendation Baseline Text (for consent)
|
Editor Rec. G.shdsl.bis
|
Q4/15
|
2003-01-07 |
|
[ 548 ]
|
Draft new Recommendation G.989.3 version 1.3 (for consent)
|
Editor Rec. G.989.3
|
Q4/15
|
2003-01-07 |
|
[ 547 ]
|
ADSL: Inclusion of T1 crosstalk disturbers in OJ-060R1 for evaluation of LDSL systems
|
Globespan Virata Inc.
,
Texas Instruments
,
Paradyne Corp.
|
Q4/15
|
2003-01-07 |
|
[ 546 ]
|
ADSL: Performance of Extended FDM mask and ADSL 2, as per OJ-200R1, OJ-200R2, OJ-201, OJ-60R2
|
Globespan Virata Inc.
|
Q4/15
|
2003-01-07 |
|
[ 545 ]
|
Comments on Contribution OJ-052R1
|
Globespan Virata Inc.
|
Q4/15
|
2003-01-07 |
|
[ 544 ]
|
Proposed Edits to the Example PSDs in Draft Appendix V for use in TCM ISDN Environment
|
Globespan Virata Inc.
|
Q4/15
|
2003-01-07 |
|
[ 543 ]
|
G.hs: ADSL: Proposed additional spectral shaping option in G.992.1 Annex I and supporting new handshake code points
|
Globespan Virata Inc.
|
Q4/15
|
2003-01-07 |
|
[ 542 ]
|
PSD for Annex I of G.992.1
|
Globespan Virata Inc.
|
Q4/15
|
2003-01-07 |
|
[ 541 ]
|
Performance of Selectable Mask System for LDSL
|
Globespan Virata Inc.
,
Texas Instruments
|
Q4/15
|
2003-01-07 |
|
[ 540 ]
|
Spectral Compatibility of Selectable Mask System for LDSL
|
Globespan Virata Inc.
,
Texas Instruments
|
Q4/15
|
2003-01-07 |
|
[ 539 ]
|
ADSL: Initialization changes to support LDSL
|
Globespan Virata Inc.
,
Texas Instruments
|
Q4/15
|
2003-01-07 |
|
[ 538 ]
|
Additional Ethernet layer network
|
Siemens AG
|
Q12/15
|
2003-01-06 |
|
[ 537 ]
|
Failure Processing on SPC connections using RSVP-TE signaling mechanism in G.7713.2
|
ZTE Corporation
|
Q14/15
|
2003-01-06 |
|
[ 536 ]
|
Concerns on Disruption Time of Services carried by Virtual Concatenation Method inside SDH Network
|
ZTE Corporation
|
Q13/15, Q11/15, Q9/15
|
2003-01-06 |
|
[ 535 ]
|
Extensional Scheme on SSM (Synchronization Status Message)
|
ZTE Corporation
|
Q13/15, Q11/15
|
2003-01-06 |
|
[ 534 ]
|
Proposal for the General Network Representation of the IEEE 802.1 Based Data Transport Network
|
ZTE Corporation
|
Q12/15
|
2003-01-06 |
|
[ 533 ]
|
Link-state Pass Through scheme for packet service transport over SDH network
|
Huawei Technologies Co.
|
Q12/15, Q11/15, Q9/15
|
2003-01-06 |
Results:982 total items. Result page:
Previous -
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10 -
11 -
12 -
13 -
14 -
15 -
16 -
17 -
18 -
19 -
20
- Next
|
Multiple Document Download: Formats and Languages to be included (when available):