Français
Español
Home
:
ITU-T
:
SG06
:
Contributions
Recently posted
-
Search Meeting Documents
ITU-T SG06 C
ITU-T SG06
Max # of documents displayed/page:
Outside plant
Study Period 2001
Results:
10
total items.
Contributions
[ AI/Question: Q5/6 ]
Number
Title
Source
AI/Question
Filter...
Clear filter
Date
[ 42 ]
Draft of study plan for Question 5/6 - Optical fibre cable network maintenance
Rapporteur of Q.5/6
Q5/6
2004-02-19
[ 33 ]
Draft new Recommendation L.53 (ex-L.mai): "Optical fibre maintenance criteria for access networks" (for consent)
Rapporteur Q.5/6
Q5/6
2003-02-17
[ 26 ]
Draft new Recommendation L.mai: "Optical fibre maintenance criteria for access networks"
Rapporteur Q5/6
Q5/6
2002-08-02
[ 25 ]
Issues on OTDR monitoring of active fibres
Italy
Q5/6
2002-08-02
[ 21 ]
Italian experience on remote fibre monitoring and testing
Italy
Q5/6
2002-08-01
[ 8 ]
Proposed appendix of Recommendation (L.40) "Optical fibre outside plant maintenance support and testing system"
Italy
Q5/6
2001-01-15
[ 7 ]
Proposed appendix of Recommendation (L.40) "Optical fibre outside plant maintenance support and testing system"
NTT
Q5/6
2001-01-15
[ 6 ]
Proposed study plan of Question 5/6 - Optical fibre cable network maintenance
NTT
Q5/6
2001-01-15
[ 3 ]
SDH Test Light module for SDH Ring OAN
Telkom-Indonesia
Q5/6
2001-01-15
[ 2 ]
Indonesian experience on optical fiber cable operation and maintenance support system
Telkom-Indonesia
Q5/6
2001-01-15
Results:
10
total items.
Multiple Document Download:
Check the boxes of the selected documents, then click "Zip and download"
User preferences:
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages
Yes
Formats
doc
pdf
zip
+ Other formats
Languages (maximum 2)
E
F
S
A
C
R
+ Multilingual
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)
Test ITU Translate for automated document translation
Top
-
Feedback
-
Contact Us
-
Copyright © ITU
2008 All Rights Reserved
Contact for this page :
TSB EDH
Updated : 2024-9-24