International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG05 : Delayed Contributions  Recently posted -  Search Meeting Documents
   
ITU-T SG05  D 

ITU-T SG05

WP 1/5 (Preventing damages and safety) and WP 2/5 (Emission, immunity and electromagnetic fields)

Study Period 2001

Results:37 total items.
Delayed Contributions  Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 37 ]  
 
Comments to revision of K.20 and K.21     Deutsche Telekom AG   Q13/5   2003-06-06
[ 36 ]  
 
Proposal for revision of Performance Criteria in K.49     Ministry of Communications and IT, India   Q12/5   2003-06-06
[ 35 ]  
 
Consideration of Immunity criteria for ADSL system     NTT   Q12/5   2003-06-05
[ 34 ]  
 
EMC troubles caused by interference below 150kHz     NTT   Q12/5   2003-06-05
[ 33 ]  
 
Comments to revision of K.44     Deutsche Telekom AG   Q13/5   2003-06-05
[ 32 ]  
 
Comments on mains power coordination test     Deutsche Telekom AG   Q13/5   2003-06-05
[ 31 ]  
 
Applicability of the Recomendation ITU-T K.52 in Venezuela     Conatel-República Bolivariana de Venezuela   Q3/5   2003-06-05
[ 30 ]  
 
Methodology and Schedule to define the Preliminary List of Questions for the 2005-2008 Study Period     Chairman of Study Group 5   QALL/5   2003-06-04
[ 29 ]  
 
Discussion about the main power port coordination test using 10/350 µs current generator     Huawei Technologies Co. Ltd.   Q13/5, Q4/5   2003-06-04
[ 28 ]  
 
The supplement to the Earthing Handbook about DC power distribution configuration     Huawei Technologies Co. Ltd.   Q6/5   2003-06-04
[ 27 ]  
 
Proposal of modifications to K.30     China Telecom   Q13/5   2003-06-04
[ 26 ]  
 
Considerations of using 10/350µs waveshape for telecom equipment's mains power port in K.20, K.21, K.44 and K.45     China Telecom   Q13/5, Q4/5   2003-06-04
[ 25 ]  
 
PROPOSAL OF EMC REQUIREMENTS BELOW 150 kHz     NTT   Q1/5, Q12/5   2002-09-26
[ 24 ]  
 
PROPOSAL OF RECOMMENDATION K.11 MODIFICATION     HUAWEI TECHNOLOGIES CO., LTD   Q5/5   2002-09-20
[ 23 ]  
 
Measured emission from a VDSL system     NTT   Q2/5   2002-06-13
[ 22 ]  
 
A comparison of detection methods in the measurement of emission from broadband access systems     NTT   Q2/5   2002-06-13
[ 21 ]  
 
Lightning surge characteristics induced in a subscriber line at a telecommunication center end in a tropical area     NTT   Q4/5   2002-06-13
[ 20 ]  
 
Experience on resistibility of new access nodes     SONERA, Finland   Q13/5, Q4/5   2002-05-17
[ 19 ]  
 
Bahrain's GSM Base station radiation field strength measurement survey     State of Bahrain   Q3/5   2001-11-29
[ 18 ]  
 
Proposals on Question 4/5     NTT   Q4/5   2001-11-29
[ 17 ]  
 
Proposal for revision of Recommendation K.20     Huawei Technologies Co., Ltd   Q4/5   2001-11-29
[ 16 ]  
 
Review of Recommendations K.15 and K.17     Deutsche Telekom AG   Q13/5   2001-11-29
[ 15 ]  
 
The proposal to change radio frequency electromagnetic field immunity requirements in EMC Recommendations     MII (China)   Q12/5   2001-11-29
[ 14 ]  
 
Interference and countermeasure among the different system radio stations at the same position in multiple operator environment     MII (China)   Q1/5   2001-11-29
[ 13 ]  
 
The proposal to add voltage dips, short interruptions and voltage variations on DC input power port immunity requirements in EMC Recommendations     MII (China)   Q12/5   2001-11-29
[ 12 ]  
 
Draft new Recommendation K.idc: Overvoltage and overcurrent requirements for interconnecting elements, terminations and protection holders     Deutsche Telekom AG   Q13/5, Q4/5   2001-11-29
[ 11 ]  
 
Power contact - Proposed modifications to IEC document given in Annex A of TD64 (June 2001)     ALCATEL   Q11/5   2001-11-29
[ 10 ]  
 
Proposed changes to Recommendation K.12     China Telecom   Q12/5   2001-06-06
[ 9 ]  
 
Unbalance of cables in NTT     NTT   Q1/5, Q2/5   2001-06-06
[ 8 ]  
 
Proposal for revision of Recommendation K.34     NTT   Q12/5   2001-06-06
[ 7 ]  
 
EMC evaluation for an ADSL system     NTT   Q1/5, Q2/5   2001-06-06
[ 6 ]  
 
EMC requirement below 150 kHz     NTT   Q12/5   2001-06-06
[ 5 ]  
 
Considerations about life test for gas discharge tubes     Brazil   Q13/5   2001-06-06
[ 4 ]  
 
Proposal to test with faster risetimes     Australia   Q13/5, Q4/5   2001-06-06
[ 3 ]  
 
The advice to set up a new Recommendation for Wideband data and High Performance Radio Local Area Network EMC requirements     MII (China)   Q2/5   2000-11-23
[ 2 ]  
 
The advice to set up a new Recommendation for Fixed Radio Links and ancillary equipment and Services EMC requirements     MII (China)   Q1/5   2000-11-23
[ 1 ]  
 
Comments on new Questions     NTT   QALL/5   2000-11-23
Results:37 total items.
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2003-06-06