International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG05 : Meeting 2003-06-16 : Temporary Documents  Recently posted -  Search Meeting Documents
   
ITU-T SG05  TD-GEN (2003-06-16) 

ITU-T SG05

WP 1/5 (Preventing damages and safety) and WP 2/5 (Emission, immunity and electromagnetic fields)

Study Period 2001

Meeting  from 2003-06-16 to 2003-06-20

held in Italy [Camogli]

Other Meetings : 2004-01-12  [ 2003-06-16 ]  2002-10-07  2002-06-24  2001-12-11  2001-06-18  2000-12-05 

Results:71 total items.
Result page:  1 - 2  - Next Next
Temporary Documents  (GEN)   Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 71-GEN ]  
 
Information on the consent of K.bsp (K.57)     Rapporteur Q 9/5   Q9/5   2003-06-24
[ 70-GEN ]  
 
Final List of Participants     TSB   QALL/5   2003-06-24
[ 69-GEN ]  
(Rev.1) 
Proposed Liaison Statement to ITU-R and IEC TC 106 on consent of Recommendation K.mes     Rapporteur Q 3/5   Q3/5   2003-06-24
[ 68-GEN ]  
 
Report of Working Party 1/5 "Preventing damages and safety"     Chairman of WP1   Q10/5, Q11/5, Q13/5, Q4/5, Q5/5, Q6/5, Q9/5   2003-06-24
[ 67-GEN ]  
 
Reports of Q 12/5     Rapporteur Q 12/5   Q12/5   2003-06-24
[ 66-GEN ]  
(Rev.1) 
Agreed changes in K.48     Rapporteur Q 12/5   Q12/5   2003-06-24
[ 65-GEN ]  
(Rev.1) 
Draft Minutes about WP2 meeting (Italic part includes hope to be consent)     Chairman of WP2/5   Q1/5, Q12/5, Q2/5, Q3/5, Q7/5, Q8/5   2003-06-24
[ 64-GEN ]  
 
Report on Q 14 (Terminology)     Rapporteur Q 14/5   Q14/5   2003-06-24
[ 63-GEN ]  
(Rev.1) 
Proposal for an answer to ETSI TC ERM TG27     Chairman of WP1/5   Q5/5, Q9/5   2003-06-24
[ 62-GEN ]  
 
Proposal for an answer to UIC on its reply to our liaison statement     Rapporteur Q 9/5   Q9/5   2003-06-24
[ 61-GEN ]  
 
Agreed changes to K.20, K.21, K.44, K.45, K.pcp and K.hold     Rapporteur Q's 4/5 and 13/5   Q13/5, Q4/5   2003-06-24
[ 60-GEN ]  
 
Proposed changes for K.bb     Rapporteur Q 2/5   Q2/5   2003-06-24
[ 59-GEN ]  
 
Report on Q 6     Rapporteur Q 6/5   Q6/5   2003-06-24
[ 58-GEN ]  
(Rev.1-2) 
Agreed changes in K.43 and K.34     Rapporteur Q 12/5   Q12/5   2003-06-24
[ 57-GEN ]  
 
Summary of the new CENELEC-ETSI JWG standard and of rapporteur's discussion     Rapporteur Q 2/5   Q2/5   2003-06-24
[ 56-GEN ]  
(Rev.1) 
List of the revised points in draft new Recommendations K.colo and K.unb     Rapporteur Q 1/5   Q1/5   2003-06-24
[ 55-GEN ]  
 
Revisions of technical and editorial type to draft K.qual (presented in TD 19 (GEN) rev1)     Rapporteur Question 8/5   Q8/5   2003-06-24
[ 54-GEN ]  
(Rev.1) 
Revisions of editorial type to draft K.bsp (presented in TD 17)     Rapporteur Q 9/5   Q9/5   2003-06-24
[ 53-GEN ]  
 
ACEC Liaison Report     ACEC   QALL/WP2   2003-06-24
[ 52-GEN ]  
 
Draft of K.mm     Rapporteur Q 7/5   Q7/5   2003-06-24
[ 51-GEN ]  
 
CISPR/I Liaison report     CISPR   QALL/5   2003-06-24
[ 50-GEN ]  
 
WHO Liaison Report     WHO Liaison   QALL/5   2003-06-23
[ 49-GEN ]  
 
Editorial changes in K.48     Rapporteur Q 12/5   Q12/5   2003-06-23
[ 48-GEN ]  
 
Revised table A1-A3 of K.34     Rapporteur Q 12/5   Q12/5   2003-06-23
[ 47-GEN ]  
(Rev.1-2) 
Draft new Recommendation K.mes: Guidance to measurement and numerical prediction of electromagnetic fields for compliance with human exposure limits for telecommunication installations     Rapporteur Q 3   Q3/5   2003-06-23
[ 46-GEN ]  
 
Status of work of IEC TC 106     Rapporteur Q 3   Q3/5   2003-06-23
[ 45-GEN ]  
 
Liaison report on CENELEC TC 210     CENELEC Liaison Rapporteur   Q9/5   2003-06-23
[ 44-GEN ]  
 
Received comments on K.48     Rapporteur Q 12/5   Q12/5   2003-06-23
[ 43-GEN ]  
 
Proposed text for K.48: inclusion of ADSL equipments     Rapporteur Q 12/5   Q12/5   2003-06-23
[ 42-GEN ]  
 
Comments to revision of K.12 and K.11     Rapporteur   Q13/5   2003-06-23
[ 41-GEN ]  
 
Mitigation handbook for telecommunication installation (Chapter 9)     Rapporteur   Q10/5   2003-06-23
[ 40-GEN ]  
 
Mitigation handbook for telecommunication installation (Chapters 1-8)     Rapporteur   Q10/5   2003-06-23
[ 39-GEN ]  
 
Examples of a coupling/decoupling network for a lightning surge resistibility test     Rapporteur of Q 6   Q13/5, Q4/5   2003-06-23
[ 38-GEN ]  
(Rev.1) +Add.1 
List of Temporary Documents     TSB   QALL/5   2003-06-23
[ 37-GEN ]  
 
Process for development and approval of Amendments and Edition 2 of the Handbook on deployment of IMT-2000     Q.5/SSG Rapporteur   QALL/5   2003-06-23
[ 36-GEN ]  
 
Draft revised Recommendation K.46: "Protection of Telecommunication Lines using Metallic Symmetric Conductors against Lightning Induced Surges"     Rapporteur Question 5/5   Q5/5   2003-06-23
[ 35-GEN ]  
 
Draft new Recommendation K.rbs: "The Protection of Radio Base Stations against Lightning Discharges"     Rapporteur Question 5/5   Q5/5   2003-06-23
[ 34-GEN ]  
 
Examples for the mitigation handbook     Rapporteur Q's 4/5 and 13/5   Q10/5   2003-06-23
[ 33-GEN ]  
 
Agenda for Q's 4 and 13     Rapporteur Q's 4/5 and 13/5   Q13/5, Q4/4   2003-06-23
[ 32-GEN ]  
 
ETSI TC ERM TG27 Comments on ITU-T SG5 Documents     Liaison Rapporteur   Q5/5, Q9/5   2003-06-23
[ 31-GEN ]  
(Rev.1) 
Draft Recommendation K.bb: Generic Emission Recommendation for Telecommunication Networks     Rapporteur Q 2/5   Q2/5   2003-06-23
[ 30-GEN ]  
 
Q's 4 and 13 for the 2005 - 2008 Study Period     Rapporteur Q's 4/5 and 13/5   QALL/5   2003-06-23
[ 29-GEN ]  
 
Draft new Recommendation K.unb - "EMC, Resistibility and Safety Requirements and Procedure for Connection to Unbundled Cables"     Rapporteur Q 1/5   Q1/5   2003-06-23
[ 28-GEN ]  
 
Draft new Recommendation K.colo - "EMC, Resistibility and Safety Requirements and Procedures for Co-located Telecommunication Installation "     Rapporteur Q 1/5   Q1/5   2003-06-23
[ 27-GEN ]  
 
Draft new Recommendation K.hold: Overvoltage and Overcurrent Requirements for Termination Modules, with Interconnecting Elements and/or Protection Holders     Rapporteur   Q13/5, Q4/5   2003-06-23
[ 26-GEN ]  
 
Proposed text for a new Recommendation K.swp "Safe working practices for outside equipment in particular environment"     Chairman of SG 5   Q11/5   2003-06-23
[ 25-GEN ]  
(Rev.1) 
Proposal to amend Recommendation K.54     Chairman of SG 5   Q9/5   2003-06-23
[ 24-GEN ]  
 
Proposed text for a New Recommendation K.pcp "Protection at Customer Premises"     Rapporteur Q's 4/5 and 13/5   Q13/5, Q4/5   2003-06-23
[ 23-GEN ]  
 
Proposed text for K.45 "Resistibility of Telecommunication Equipment installed in the Access and Trunk Networks to Overvoltages and Overcurrents"     Rapporteur Q's 4/5 and 13/5   Q13/5, Q4/5   2003-06-23
[ 22-GEN ]  
 
Proposed text for K.44 "Resistibility tests for Telecommunication Equipment exposed to overvoltages and overcurrents - Basic Recommendation"     Rapporteur Q's 4/5 and 13/5   Q13/5, Q4/5   2003-06-23
Results:71 total items.
Result page:  1 - 2  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2024-5-19