International Telecommunication Union   ITU
Français  Espańol
 
Site map Contact Us Print version
  Home : ITU-R : WP4A.AR : Contributions  Recently posted -  Search Meeting Documents
   
ITU-R WP4A.AR  C 

ITU-R WP4A.AR

Efficient Orbit/Spectrum Utilization for FSS and BSS

Results:763 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16  - Next Next
Contributions  Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 313 ]  
 
Proposed amendment to preliminary draft CPM text for WRC-23 agenda item 1.15     Cameroon (Republic of) , Egypt (Arab Republic of) , Ghana , Rwanda (Republic of) , Saudi Arabia (Kingdom of) , South Africa (Republic of) , Tanzania (United Republic of)   AI1.15   2021-10-21
[ 312 ]  
 
Proposed amendments to working document on WRC-23 agenda item 1.15     Cameroon (Republic of) , Egypt (Arab Republic of) , Ghana , Rwanda (Republic of) , Saudi Arabia (Kingdom of) , South Africa (Republic of) , Tanzania (United Republic of)   AI1.15   2021-10-21
[ 311 ]  
 
Additional reply liaison statement to Working Party 5A on protection criteria of FSS to be used for studies under WRC-23 agenda item 1.3     Guinea (Republic of) , Ghana , Niger (Republic of the)   AI1.3   2021-10-20
[ 310 ]  
 
Working document towards a methodology for evaluating aggregate equivalent power flux-density into geostationary satellite networks in the fixed-satellite service from multiple non-geostationary satellite systems in the Q/V frequency bands and terms of reference for consultation meetings     SES     2021-10-20
[ 309 ]  
 
Working document towards a methodology for evaluating aggregate equivalent power flux-density into geostationary satellite networks in the fixed-satellite service from multiple non-geostationary satellite systems in the Ku and Ka frequency bands and terms of reference for consultation meetings     SES     2021-10-20
[ 308 ]  
 
View on studies related to modifications to RR No.21.16.6     United States of America     2021-10-20
[ 307 ]  
 
Working document towards draft CPM text for WRC-23 agenda item 1.17     United States of America   AI1.17   2021-10-20
[ 306 ]  
 
Proposed Topic to be considered under WRC-23 agenda item 7 - Use of a space station to bring frequency assignments to geostationary-satellite networks at different orbital locations into use     Egypt (Arab Republic of) , Saudi Arabia (Kingdom of)   AI7   2021-10-20
[ 305 ]  
 
Modification to draft CPM text for WRC-23 agenda item 1.16     Egypt (Arab Republic of)   AI1.16   2021-10-20
[ 304 ]  
 
Characteristics of mobile-satellite service (MSS) feeder downlinks in the fixed-satellite service (FSS) (space-to-Earth) for use in sharing studies     France   AI1.2   2021-10-20
[ 303 ]  
 
Working document towards a preliminary draft revision of Recommendation ITU-R S.1503-3 - Proposed alternative methodology that may be used when developing software tools for determining conformity of non-geostationary-satellite orbit fixed-satellite service systems or networks with limits contained in Article 22 of the Radio Regulations     France     2021-10-20
[ 302 ]  
 
Inclusion of amendments to Reoslution 770 (WRC-19) under agenda item 7     France   AI7   2021-10-20
[ 301 ]  
 
Proposals for supplemental links submission and validation methodology     France     2021-10-20
[ 300 ]  
 
Overview of Reports and Recommendations on aggregate interference effect involving NGSO and Non-GSO mitigation techniques     France     2021-10-20
[ 299 ]  
 
Liaison statement to Working Party 1C     France     2021-10-20
[ 298 ]  
 
Working document towards a preliminary draft new Recommendation/Report ITU-R S.[RES 770] - Functional description to be used in developing software tools for determining conformity of non-geostationary-satellite orbit fixed-satellite service systems or networks in Q/V band with criteria contained in Article 22.5L of the Radio Regulations     France     2021-10-20
[ 297 ]  
 
Proposed amendments to the Working Document towards a draft new Resolution [A116] (WRC-23) - Agenda item 1.16     France   AI1.16   2021-10-20
[ 296 ]  
 
Study on HAPS protection from Non-GSO to Non-GSO transmissions at 28 GHz     France   AI1.17   2021-10-20
[ 295 ]  
 
Study on FS protection from NGSO to NGSO/GSO transmissions at 28 GHz     France   AI1.7   2021-10-20
[ 294 ]  
 
Working document towards draft CPM Text for WRC-23 agenda item 1.17     France   AI1.17   2021-10-20
[ 293 ]  
 
Working document towards a preliminary draft new Recommendation [RES76_AGGLIM]     France     2021-10-20
[ 292 ]  
 
Working document towards draft CPM text for WRC-23 agenda item 7, Topic E     Bosnia and Herzegovina , Croatia (Republic of) , Georgia , Moldova (Republic of) , North Macedonia (Republic of) , Rwanda (Republic of) , Serbia (Republic of ) , South Sudan   AI7E   2021-10-20
[ 291 ]  
 
Downlink adjacent band protection criteria for WRC-23 agenda item 1.2     SES , Eutelsat S.A. , HISPASAT, S.A. , Inmarsat Plc. , Intelsat LLC   AI1.2   2021-10-20
[ 290 ]  
 
Sharing studies for satellite-to-satellite transmissions in the frequency bands 18.1-18.6 GHz, 18.8-20.2 GHz and 27.5-30 GHz     SES   AI1.17   2021-10-20
[ 289 ]  
 
Coordination of submissions in accordance with Resolution 559 (WRC-19)     Benin (Republic of) , Botswana (Republic of) , Cameroon (Republic of) , Comoros (Union of the) , Democratic Republic of the Congo , Djibouti (Republic of) , Eswatini (Kingdom of) , Ghana , Kenya (Republic of) , Lesotho (Kingdom of) , Malawi , Mali (Republic of) , Mauritius (Republic of) , Mozambique (Republic of) , Namibia (Republic of) , Niger (Republic of the) , Rwanda (Republic of) , Senegal (Republic of) , Somalia (Federal Republic of) , South Africa (Republic of) , Sudan (Republic of the) , Tanzania (United Republic of) , Uganda (Republic of) , Zambia (Republic of) , Zimbabwe (Republic of)     2021-10-20
[ 288 ]  
 
Working document towards draft CPM text for WRC-23 agenda item 7, Topic F - Excluding uplink service area in AP30A for R1&3 and AP30B     Benin (Republic of) , Botswana (Republic of) , Cameroon (Republic of) , Comoros (Union of the) , Democratic Republic of the Congo , Djibouti (Republic of) , Eswatini (Kingdom of) , Ghana , Kenya (Republic of) , Lesotho (Kingdom of) , Malawi , Mali (Republic of) , Mauritius (Republic of) , Mozambique (Republic of) , Namibia (Republic of) , Niger (Republic of the) , Rwanda (Republic of) , Senegal (Republic of) , Somalia (Federal Republic of) , South Africa (Republic of) , Sudan (Republic of the) , Uganda (Republic of) , Zambia (Republic of) , Zimbabwe (Republic of)     2021-10-20
[ 287 ]  
 
Proposal for a Table of content document towards a preliminary draft new Recommendation/Report ITU-R S.[MITIGATION MEASURE]     Niger (Republic of the) , Ghana , Papua New Guinea     2021-10-20
[ 286 ]  
 
Proposal for WRC-23 agenda item 7 - Long-term Protection of Assignments in the Regions 1 and 3 BSS Plans, Allotments in the FSS Plan and those intended to enter into these Plans from an Incoming Network     Benin (Republic of) , Botswana (Republic of) , Cameroon (Republic of) , Comoros (Union of the) , Côte d'Ivoire (Republic of) , Djibouti (Republic of) , Eswatini (Kingdom of) , Ghana , Kenya (Republic of) , Malawi , Mali (Republic of) , Mozambique (Republic of) , Niger (Republic of the) , Nigeria (Federal Republic of) , Rwanda (Republic of) , Senegal (Republic of) , Somalia (Federal Republic of) , South Africa (Republic of) , South Sudan , Sudan (Republic of the) , Tanzania (United Republic of) , Uganda (Republic of) , Zambia (Republic of) , Zimbabwe (Republic of)     2021-10-20
[ 285 ]  
 
Working material for the development of methodology to examine GSO a ESIM conformity with PFD limits     SAS ASTRA AB , Inmarsat Plc.     2021-10-20
[ 284 ]  
 
Proposals on WRC-23 agenda item 1.17     Russian Federation   AI1.17   2021-10-20
[ 283 ]  
 
Proposals on WRC-23 agenda item 1.15 - ?roposed amendments to Preliminary draft ??? text for WRC-23 agenda item 1.15 - (Annex 30 to WP 4A Chairman's Report     Russian Federation   AI1.5   2021-10-20
[ 282 ]  
 
Proposed amendments to working document on WRC-23 agenda item 7, Topic C     Germany (Federal Republic of)   AI7C   2021-10-20
[ 281 ]  
 
Impact of NGSO FSS service provider to NGSO user on EESS (passive) in the 18.6-18.8 GHz band     European Space Agency , European Organisation for the Exploitation of Meteorological Satellites   AI1.17   2021-10-20
[ 280 ]  
 
Impact of NGSO FSS service provider to NGSO user on EESS (passive) in the 18.6-18.8 GHz band - WRC-23 agenda item 1.17     European Space Agency , European Organisation for the Exploitation of Meteorological Satellites   AI1.17   2021-10-20
[ 279 ]  
 
Impact of NGSO FSS satellites communicating with Aeronautical and Maritime ESIM over the oceans on EESS (passive) in the 18.6-18.8 GHz band     European Space Agency , European Organisation for the Exploitation of Meteorological Satellites   AI1.16   2021-10-20
[ 278 ]  
 
Impact from FSS earth stations on aircraft and vessels in 12.75-13.25 GHz into EESS (active) in 13.25-13.75 GHz     European Space Agency , European Organisation for the Exploitation of Meteorological Satellites   AI1.15   2021-10-20
[ 277 ]  
 
ITU-R Small Satellite Handbook     European Space Agency     2021-10-20
[ 276 ]  
 
WRC-23 agenda item 7, Topic E     Luxembourg , Netherlands (Kingdom of the) , Norway , Spain , Sweden   AI7E   2021-10-20
[ 275 ]  
 
haring and compatibility study between Aeronautical and Maritime ESIM communicating with non-GSO FSS systems and the fixed and mobile services in the frequency band 27.5-29.1 GHz under WRC-23 agenda item 1.16 [NON-GSO_ESIM]     Luxembourg   AI1.16   2021-10-20
[ 274 ]  
 
Proposed amendments to the draft new Resolution [A116] (WRC-23)     Luxembourg   AI1.16   2021-10-20
[ 273 ]  
 
WRC-23 agenda item 7, Topic F     Luxembourg   AI7F   2021-10-20
[ 272 ]  
 
Working document towards draft CPM text for WRC-23 agenda item 7, Topic B     Luxembourg   AI7B   2021-10-20
[ 271 ]  
 
Liaison statement to Working Party 5B (copied to Working Party 4A), reply to ITU-R Document 5B/646 Annex 23     International Civil Aviation Organization     2021-10-19
[ 270 ]  
 
Working document towards a preliminary draft new Report ITU-R S.[AGGREGATE NGSO-GSO INTERFERENCE METHODOLOGY] - Methodologies for the evaluation of aggregate interference caused by multiple non-GSO FSS systems into GSO FSS, MSS and BSS networks in the 50/40 GHz bands     Canada     2021-10-20
[ 269 ]  
 
Proposed amendments to the Working Document towards a draft new Resolution [A116] (WRC-23) - Agenda item 1.16     Canada   AI1.16   2021-10-20
[ 268 ]  
 
Working document towards a preliminary draft new Recommendation ITU-R S.[INTERFERENCE-NGSO]     Canada     2021-10-20
[ 267 ]  
 
Considerations on mitigation techniques between non-GSO FSS systems in the bands 10.7-50.4 GHz     Canada     2021-10-20
[ 266 ]  
 
Proposal for PFD limits applicable to ESIMS operating with non-GSO FSS systems to protect terrestrial services operating in the frequency band 27.5-29.1 GHz     Canada   AI1.16   2021-10-20
[ 265 ]  
 
Proposed modifications to the working document towards draft CPM text for WRC-23 agenda item 7, Topic B     Canada   AI7B   2021-10-20
[ 264 ]  
 
Proposed modifications to the working document towards a preliminary draft new Report on WRC-23 agenda item 7, Topic A     Canada   AI7A   2021-10-20
Results:763 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  ITU-R Web coordinator
Updated : 2024-04-22