International Telecommunication Union   ITU
Français  Espańol
 
Site map Contact Us Print version
  Home : ITU-R : WP7C : Contributions  Recently posted -  Search Meeting Documents
   
ITU-R WP7C  C 

ITU-R WP7C

Remote Sensing Systems

Results:8 total items.
Contributions  [ Source: WP 7D ]   Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 377 ]  
 
Reply liaison statement to Working Party 5A (copy for information to Working Party 7C) - Working document towards a preliminary draft new Report ITU-R M.[100GHZ.RSTT.COEXIST]     WP 7D     2019-06-03
[ 292 ]  
(Rev.1) 
Reply liaison statement to Working Party 4A (copy to Working Parties 5B, 5C, 5D, 6A, 7B, 7C for information - Working document towards a preliminary draft new Report ITU-R S.[50/40 GHz adjacent band studies] - Protection of EESS (passive) and RAS systems for non-GSO fixed satellite systems operating in the 37.5-42.5 GHz, 47.2-50.2 GHz and 50.4-51.4 GHz frequency bands     WP 7D   AI1.6   2018-05-21
[ 290 ]  
 
Reply liaison statement to Working Party 5B (copy to Working Parties 5A and 7C) Foreign Object Debris detection system operating in the band 92-100 GHz     WP 7D     2018-05-18
[ 289 ]  
 
Reply liaison statement to Working Party 5A (copied to Working Parties 5B and 7C for information) - Coexistence between high-speed railway radiocommunication system between train and trackside operating in the frequency bands 92-94 GHz, 94.1-100 GHz and 102-109.5 GHz, and active and passive services     WP 7D     2018-05-18
[ 198 ]  
 
Reply liaison statement to Working Party 5B (copy to Working Parties 5A, 7C) - Foreign Object Debris (FOD) detection system operating in the band 92-100 GHz     WP 7D     2017-10-30
[ 145 ]  
 
Liaison statement to Working Party 1A (copy for information to Working Parties 1B, 4A, 4C, 5A, 5B, 6A, 7B, 7C) - Proposed modification to the working document towards a preliminary draft new Report ITU-R SM.[SHARING-METHODS] - Methods for sharing between radiocommunication services     WP 7D     2017-04-07
[ 92 ]  
 
Liaison statement to Working Party 4A (copy to Working Parties 3M, 4B, 5A, 5B, 5C, 5D, 6A and 7C) - WRC-19 agenda items 1.6 and 9.1, issue 9.1.9     WP 7D   AI9.1, AI1.6   2016-11-01
[ 40 ]  
 
Liaison statement to Working Parties 3K and 3M (for action) and Study Group 5 and Working Parties 1A, 4A, 4C, 5A, 5B, 5C, 5D, 6A and 7C (for information)     WP 7D     2016-04-11
Results:8 total items.
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  ITU-R Web coordinator
Updated : 2024-6-6