International Telecommunication Union   ITU
Français  Espańol
 
Site map Contact Us Print version
  Home : ITU-R : WP7B : Contributions  Recently posted -  Search Meeting Documents
   
ITU-R WP7B  C 

ITU-R WP7B

Space Radiocommunication Applications

Results:339 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14  - Next Next
Contributions  Documents / Contributions
 
Number 
Received Source Title Questions
[ 314 ]  
 
2014-09-19 United States of America   Preliminary draft new Report ITU-R SA.[GSO EESS-SPACE -7GHz] - Compatibility between GSO EESS (Earth-to-space), the fixed service, the mobile service, the space research service, or the space operation service in the band 7 190-7 235 MHz     N/A  
[ 313 ]  
 
2014-09-19 United States of America   Proposed reply liaison statement to Working Party 4A - SRS/FSS sharing in the 37.5-38 GHz band     211/7  
[ 312 ]  
 
2014-09-19 United States of America   Proposed liaison statement to Working Party 4A - PDN Report on WRC-15 agenda item 1.9.1     N/A  
[ 311 ]  
 
2014-09-19 United States of America   Draft liaison statement to Working Party 5C - Revisions of Recommendations ITU-R F.1247-3, ITU-R F.1249-3 and ITU-R F.1509-2     N/A  
[ 310 ]  
 
2014-09-19 United States of America   Draft revision of Document 7B/293 Annex 6 "Preliminary draft new Report ITU-R SA.[NANO/PICOSAT CHARACTERISTICS]"     254/7  
[ 309 ]  
 
2014-09-19 United States of America   Draft revision of Document 7B/293 Annex 7 "Preliminary draft new Report ITU-R SA.[NANO/PICOSAT CURRENT PRACTICE]"     254/7  
[ 308 ]  
 
2014-09-19 United States of America   Liaison statement to Working Party 4A and the Special Committee (copy for information to Working Parties 5A and 6A) - WRC-15 agenda item 9.1 (9.1.8)     N/A  
[ 307 ]  
 
2014-09-19 Netherlands (Kingdom of the)   Proposed modifications to ITU-R Question 254/7     N/A  
[ 306 ]  
 
2014-09-01 WP 4A   Liaison statement to Working Party 7B - WRC-15 agenda item 1.9.1     N/A  
[ 305 ]  
 
2014-09-01 WP 4A   Liaison statement to Working Party 7B - WRC-15 agenda item 1.6     N/A  
[ 304 ]  
 
2014-08-04 Indonesia (Republic of)   Views on WRC-15 agenda item 1.11     N/A  
[ 303 ]  
 
2014-07-17 WP 4C   Liaison statement to Working Party 7B - WRC-15 agenda item 9.1, issue 9.1.1     N/A  
[ 302 ]  
 
2014-06-19 WP 1B   Liaison statement to Working Parties 4A, 4C, 5A, 5B, 5C, 5D, 6A, 7B, 7C and 7D - Working document towards a preliminary draft new Report ITU-R SM.[DYNAMIC ACCESS] - Spectrum management principles and spectrum engineering techniques for dynamic access to spectrum by radio systems employing cognitive capabilities     N/A  
[ 301 ]  
 
2014-06-19 WP 1A   Liaison statement to Working Parties 4A, 4C, 5A, 5B, 5C, 5D, 6A, 7B, 7C and 7D (copy to Working Parties 1B and 1C) - Characteristics of the unwanted emissions in the out-of-band and spurious domains for digital modulation technology used in broadband communication systems     N/A  
[ 300 ]  
 
2014-06-06 WP 5B   Reply liaison statement to Working Party 7B - Protection of SRS Earth stations from transmitting aircraft stations in the 2 200-2 290 MHz band     N/A  
[ 299 ]  
 
2014-06-03 WP 5A   Liaison statement to Working Party 4C (copied for information to Working Parties 3M, 4A, 4B, 5C, 7A, 7B, 7C and 7D) - WRC-15 agenda item 1.10     N/A  
[ 298 ]  
 
2014-05-28 WP 5C   Liaison statement to Working Party 7B - Revisions of Recommendations ITU-R F.1247-3, ITU-R F.1249-3 and ITU-R F.1509-2     N/A  
[ 297 ]  
 
2014-05-28 WP 5C   Liaison statement to Working Parties 4C and 5B (copy for information to Working Parties 3M, 4A, 4B, 5A, 7A, 7B, 7C and 7D) - WRC-15 agenda item 1.10     N/A  
[ 296 ]  
 
2014-05-28 WP 5C   Liaison statement to Working Party 4C (copy to Working Parties 3M, 4A, 4B, 5A, 5B and 7B for information) - WRC-15 agenda item 1.9.2     N/A  
[ 295 ]  
 
2014-05-28 WP 5C   Reply liaison statement to Working Party 4A (copy to Working Parties 5A and 7B for information) - WRC-15 agenda item 1.9.1     N/A  
[ 294 ]  
 
2014-05-15 WP 7D   Liaison statement to Working Party 1B (copy to Working Parties 1A, 7B and 7C for information) - Working document towards a preliminary draft new Report ITU-R SM.[DYNAMIC ACCESS] - Spectrum management principles and spectrum engineering techniques for dynamic access to spectrum by radio systems employing cognitive capabilities     N/A  
[ 293 ]  
+Ann.1-11 
2014-05-13 Chairman, WP 7B   Report of the meeting of Working Party 7B (Geneva, 6-13 May 2014)     N/A  
[ 292 ]  
 
2014-05-13 Director, BR   Final List of Participants - Working Party 7B (Geneva, 6-13 May 2014)     N/A  
[ 291 ]  
 
2014-05-01 BR Study Groups Department   List of documents issued (Documents 7B/226 - 7B/291)     N/A  
[ 290 ]  
 
2014-04-30 SG 5   Recommendation ITU-R F.1336-4 - Reference radiation patterns of omnidirectional, sectoral and other antennas for the fixed and mobile services for use in sharing studies in the frequency range from 400 MHz to about 70 GHz     N/A  
Results:339 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

 

Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  ITU-R Web coordinator
Updated : 2014-12-16