International Telecommunication Union   ITU
Français  Espańol
 
Site map Contact Us Print version
  Home : ITU-R : WP7A : Contributions  Recently posted -  Search Meeting Documents
   
ITU-R WP7A  C 

ITU-R WP7A

Time Signals and Frequency Standard Emissions

Results:83 total items.
Result page:  1 - 2  - Next Next
Contributions  Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 83 ]  
 
Recommendation ITU-R SM.1541-6 - Unwanted emissions in the out-of-band domain     SG 1     2015-10-12
[ 82 ]  
 
Recommendation ITU-R F.758-6 - System parameters and considerations in the development of criteria for sharing or compatibility between digital fixed wireless systems in the fixed service and systems in other services and other sources of interference     SG 5     2015-10-12
[ 81 ]  
 
Liaison statement to Working Party 1A (Copy to Working Parties 1B, 1C, 5B, 7A and 7D) - Radio frequency ranges for wireless power transmission using technologies other than a radio frequency beam     WP 6A     2015-08-03
[ 80 ]  
 
Reply liaison statement to Working Party 1A (copied for information to Working Parties 1B, 5A, 5C, 6A, 7A and 7D) - Radio frequency ranges for wireless power transmission using technologies other than radio frequency beam     WP 5B     2015-07-20
[ 79 ]  
 
Reply liaison statement to Working Party 4C, Study Group 4 and Study Group 5 (with information to Working Parties 3M, 4A, 4B, 5A, 5B, 7A, 7B, 7C and 7D) - WRC-15 agenda item 1.10     WP 5C     2015-07-16
[ 78 ]  
 
Liaison statement to Working Party 5C (copy to Working Parties 4C, 5A, 5B, 7A, 7B, 7C and 7D) - WRC-15 agenda item 1.8     WP 4A     2015-07-01
[ 77 ]  
 
Liaison statement to Working Parties 3M, 4A, 4B, 5A, 5B, 5C, 7A, 7B, 7C and 7D - WRC-15 agenda item 1.10     WP 4C     2015-06-23
[ 76 ]  
 
Liaison statement to Working Parties 1B, 5B, 5C, 6A, 7A and 7D - Radio frequency ranges for wireless power transmission using technologies other than radio frequency beam     WP 1A     2015-06-23
[ 75 ]  
 
Draft revision of Recommendation ITU-R TF.538-3 - Measures for random instabilities in frequency and time (phase)     SG 7     2015-05-27
[ 74 ]  
+Ann.1 
Report of the meeting of Working Party 7A (Geneva, 20-25 May 2015)     Chairman, WP 7A     2015-05-25
[ 73 ]  
 
Final list of participants - Working Party 7A (20-25 May 2015)     Director, BR     2015-05-25
[ 72 ]  
 
List of documents issued (Documents 7A/67 - 7A/72)     BR Study Groups Department     2015-05-19
[ 71 ]  
 
Preliminary draft revision of Recommendation ITU-R TF.538-3 - Measures for random instabilities in frequency and time (phase)     Italy     2015-05-11
[ 70 ]  
 
Liaison statement to Working Parties 4A, 4C, 5A, 5B, 5C, 5D, 6A, 6B, 6C, 7A, 7B, 7C and 7D - Revision of Recommendation ITU-R P.619 - Propagation data required for the evaluation of interference between stations in space and those on the surface of the Earth     WP 3M     2015-05-08
[ 69 ]  
 
Predicted radio signal coverage for existing standard frequency and time signal (SFTS) services operating at 40, 60 and 77.5 kHz     United States of America   244/7   2015-05-05
[ 68 ]  
 
Report of the tenth meeting of the Joint IMO/ITU Experts Group on maritime radiocommunication matters     International Maritime Organization     2014-10-15
[ 67 ]  
+Ann.1-3 
Report of the meeting of Working Party 7A (Geneva, 1-7 October 2014)     Chairman, WP 7A     2014-10-07
[ 66 ]  
 
Final list of participants - Working Party 7A (Geneva, 1-7 October 2014)     Director, BR     2014-10-07
[ 65 ]  
 
List of documents issued (Documents 7A/56 - 7A/65)     BR Study Groups Department     2014-09-30
[ 64 ]  
 
Contribution to the discussion on Question ITU-R 244/7 - Interference between standard frequency and time signal services operating between 20 and 90 KHz     Japan   244/7   2014-09-24
[ 63 ]  
 
Information document on the Leap Second Issue - URSI Commission A Resolution     Scientific Committee on Frequency Allocations for Radio Astronomy and Space Science     2014-09-24
[ 62 ]  
 
Information note to ITU-R Working Party 7A Question ITU-R 249/7 - Time and frequency information from "Enhanced" long range AID to navigation (eLoran)     United Kingdom of Great Britain and Northern Ireland     2014-09-23
[ 61 ]  
 
Preliminary draft revision of Recommendation ITU-R TF.1153-3 "The operational use of two-way satellite time and frequency transfer employing pseudorandom noise codes"     France , Germany (Federal Republic of) , United States of America     2014-09-21
[ 60 ]  
 
Preliminary draft new Report on the ITU/BIPM workshop on the future of the International Time Scale     United States of America     2014-09-21
[ 59 ]  
 
Working document toward preliminary draft revision of Recommendation ITU-R TF.460-6 - Standard-frequency and time-signal emissions     Russian Federation     2014-09-18
[ 58 ]  
 
Liaison statement to Working Party 4C (copied for information to Working Parties 3M, 4A, 4B, 5C, 7A, 7B, 7C and 7D) - WRC-15 agenda item 1.10     WP 5A     2014-06-03
[ 57 ]  
 
Liaison statement to Working Parties 4C and 5B (copy for information to Working Parties 3M, 4A, 4B, 5A, 7A, 7B, 7C and 7D) - WRC-15 agenda item 1.10     WP 5C     2014-05-28
[ 56 ]  
+Ann.1-2 
Report on the meeting of Working Party 7A (Geneva, 6-13 May 2014)     Chairman, WP 7A     2014-05-13
[ 55 ]  
 
Final List of Participants - Working Party 7A (Geneva, 6-13 May 2014)     Director, BR     2014-05-13
[ 54 ]  
 
List of documents issued (Documents 7A/42 - 7A/54)     BR Study Groups Department     2014-05-01
[ 53 ]  
 
Proposed modification to the preliminary draft CPM text on WRC-15 agenda item 1.14     United Kingdom of Great Britain and Northern Ireland     2014-04-29
[ 52 ]  
 
Proposals on update of draft CPM text for WRC-15 agenda item 1.14     Russian Federation     2014-04-28
[ 51 ]  
 
Report of the ITU/BIPM workshop on the future of the international time scale     International Bureau of Weights and Measures     2014-04-25
[ 50 ]  
 
Proposed revisions to preliminary draft CPM text on WRC-15 agenda item 1.14     Japan     2014-04-25
[ 49 ]  
 
Dissemination of two time scales in parallel     International Bureau of Weights and Measures , France     2014-04-24
[ 48 ]  
 
Proposed modification to the preliminary draft CPM text on WRC-15 agenda item 1.14     International Bureau of Weights and Measures , France , United States of America     2014-04-24
[ 47 ]  
 
Liaison statement to Working Parties 3M, 4A, 4B 5A, 5C, 7A, 7B, 7C and 7D - WRC-15 agenda item 1.10     WP 4C     2014-03-24
[ 46 ]  
 
Report of the ninth meeting of the Joint IMO/ITU Experts Group on maritime radiocommunication matters     International Maritime Organization     2013-11-01
[ 45 ]  
 
Future of universal time scale     Director, BR     2013-10-18
[ 44 ]  
 
Draft revision of Recommendation ITU-R TF.374-5 - Precise frequency and time-signal transmissions     Chairman, SG 7     2013-09-24
[ 43 ]  
 
Recommendation ITU-R SM.1541-5 - Unwanted emissions in the out-of-band domain     SG 1     2013-09-19
[ 42 ]  
+Ann.1-2 
Report of the meeting of Working Party 7A (Geneva, 11-17 September 2013)     Chairman, WP 7A     2013-09-18
[ 41 ]  
 
Final list of participants - Working Party 7A (Geneva, 11 - 17 September, 2013)     Director, BR     2013-09-17
[ 40 ]  
 
Proposed draft Revision of Question ITU-R 236/7 - The future of the UTC time scale     Chairman, WP 7A   236/7   2013-09-12
[ 39 ]  
 
Information on the preparation of texts for the draft CPM Report to WRC-15     Chairman, CPM-15     2013-09-10
[ 38 ]  
 
List of documents issued (Documents 7A/28 - 7A/37)     BR Study Groups Department     2013-09-05
[ 37 ]  
 
Proposed revision to draft CPM text on WRC-15 agenda item 1.14     United Kingdom of Great Britain and Northern Ireland     2013-09-04
[ 36 ]  
 
Proposals on WRC-15 agenda item 1.14     Russian Federation     2013-09-03
[ 35 ]  
 
Preliminary draft revision of Recommendation ITU-R TF.374-5 "Precise frequency and time-signal transmissions"     Germany (Federal Republic of)     2013-09-02
[ 34 ]  
 
An introduction to Universal Coordinated Time and the use of leap seconds as related to WRC-15 agenda item 1.14     United States of America     2013-09-02
Results:83 total items.
Result page:  1 - 2  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  ITU-R Web coordinator
Updated : 2015-11-17