International Telecommunication Union   ITU
Français  Espańol
 
Site map Contact Us Print version
  Home : ITU-R : WP5D : Contributions  Recently posted -  Search Meeting Documents
   
ITU-R WP5D  C 

ITU-R WP5D

IMT Systems

Results:26 total items.
Contributions  [ Source: WP 5A ]   Documents / Contributions
 
Number 
Title Source Date
[ 1062 ]  
 
Liaison statement to Working Party 4A (copied for information Working Parties 5C and 5D) - Working document towards a preliminary draft new Recommendation ITU-R SF.[INTERF.AREA]     WP 5A   2015-08-26
[ 1061 ]  
 
Liaison statement to Working Party 5D - New Report ITU-R M.2377 - Objectives and requirements for Public Protection and Disaster Relief radiocommunications systems     WP 5A   2015-08-26
[ 1060 ]  
 
Liaison statement to Working Party 1A (copy for information to Working Parties 1B, 1C, 4A 4C, 5B, 5C, 5D, 6A, 7B, 7C and 7D) - Working document toward a preliminary draft new Report ITU-R SM.[CHAR-UNWANTED]     WP 5A   2015-08-26
[ 1059 ]  
 
Liaison statement to Working Party 1B (copy to ITU-D Study Group 1 and ITU-R Working Party 5D for information) - Working document towards a preliminary draft new Report ITU-R SM.[INNOVATIVE REGULATORY TOOLS] - Innovative regulatory tools to support enhanced shared use of the spectrum     WP 5A   2015-08-26
[ 1058 ]  
 
Liaison statement to Working Parties 4A, 4C, 5B, 5C, 5D, 7B and 7D - On proposed revisions to Recommendation ITU-R M.1732     WP 5A   2015-08-26
[ 841 ]  
 
Liaison statement to Working Party 1A (copy for information to Workign Parties 1B, 1C, 4A, 4C, 5B, 5C, 5D, 6A, 7B, 7C and 7D) - Characteristics of the unwanted emissions in the out-of-band and spurious domains for digital modulation technology used in broadband communications systems     WP 5A   2014-11-10
[ 839 ]  
 
Liaison statement to Working Party 5D - Preliminary draft new Report ITU-R M.[PPDR] "Public protection and disaster relief communications" and draft revision of Recommendation ITU-R M.2009     WP 5A   2014-11-07
[ 646 ]  
 
Liaison statement to Working Party 5D - Working document toward a preliminary draft new Report ITU-R M.[PPDR] "Public protection an disaster relief communications"     WP 5A   2014-06-03
[ 645 ]  
 
Liaison statement to Working Party 5D on local coverage operation of broadband wireless access systems in the bands below 6 GHz     WP 5A   2014-06-03
[ 644 ]  
 
Liaison statement to ITU-T FG Innovation, TSAG and Study Group 17 (copy for information to ITU-R Study Group 5, Working Parties 5B, 5C and 5D) - New standardization activities for the International Telecommunication Union - Standardization Sector (ITU-T)     WP 5A   2014-06-03
[ 642 ]  
 
Liaison statement to Working Party 1B (copied to Working Parties 5B, 5C and 5D for information) - Spectrum management principles and spectrum engineering techniques for dynamic access to spectrum by radio systems employing cognitive capabilities     WP 5A   2014-05-30
[ 551 ]  
 
Liaison statement to Working Party 5D - Radio interface standards for broadband wireless access systems in the fixed service operating below 66 GHz     WP 5A   2013-12-06
[ 550 ]  
 
Reply liaison statement to Working Party 5C (copy to Working Party 5D and ITU-T Study Groups 13 and 15) - Development of a draft new Report ITU-R F.[FS.IMT/BB] - Fixed service backhaul networks for IMT and other terrestrial mobile broadband systems     WP 5A   2013-12-06
[ 547 ]  
 
Liaison statement to Working Parties 5C, 5D and 6A - The use of mobile braoadband networks for electronic news gathering (ENG) applications in the mobile service     WP 5A   2013-12-05
[ 331 ]  
 
Liaison statement to ITU-T Study Group 5 (Question 14/5) (copy to ITU-D Study Group 2 and ITU-R Working Party 5D for information) - Use of spectrum and radio technology low cost sustainable telecommunication infrastructure for rural communications in developing countries     WP 5A   2013-06-05
[ 329 ]  
 
Liaison statement to Joint Task Group 4-5-6-7 (copy for information to Working Parties 4A, 4B, 4C, 5B, 5C, 5D, 6A, 7B, 7C, 7D, 1A, 3K, 3M) - Reply liaison statement on spectrum requirements for terrestrial mobile broadband (excluding IMT) related to WRC-15 Agenda item 1.1     WP 5A   2013-06-04
[ 328 ]  
 
Liaison statement to Working Party 5D - Response from Working Party 5A to the ICT sectorial consultation on the role of ICTs to promote the inclusion of persons with disabilities     WP 5A   2013-06-04
[ 216 ]  
 
Liaison statement to Working Parties 4A, 7B, 7C and 7D (copy to Working Parties 5B, 5C and 5D) - WRC-15 Agenda item 1.6 - Characteristics of and protection criteria for mobile systems operating in the frequency range 14.5-15.35 GHz     WP 5A   2012-11-21
[ 213 ]  
 
Liaison statement to Joint Task Group 4-5-6-7 (copy to Working Parties (4A, 4B, 4C, 5B, 5C 5D, 6A, 7B, 7C, 7D 1A, 3K 3M) for information) - WRC-15 Agenda item 1.1 - Working Party 5A initial information on spectrum requirements studies for WRC-15 Agenda item 1.1     WP 5A   2012-11-16
[ 212 ]  
 
Liaison statement to Joint Task Group 4-5-6-7 (copy to Workin Parties (4A, 4B, 4C 5B, 5C, 5D, 6A, 7B, 7C, 7D, 1A, 3K, 3M) for information) - WRC-15 Agenda item 1.1 - Sharing considerations for the 5-6 GHz frequency range for WRC-15 Agenda item 1.1     WP 5A   2012-11-16
[ 37 ]  
 
Liaison statement to Working Party 5D on the revision of Report ITU-R M.2117 "Software-defined radio in the land mobile, amateur and amateur satellite services"     WP 5A   2012-06-05
[ 36 ]  
 
Liaison statement to relevant Working Parties of Study Group 5 on further studies on cognitive radio systems (CRS) (copy for information to relevant Working Parties of Study Groups 1, 4, 6 and 7)     WP 5A   2012-06-05
[ 35 ]  
 
Liaison statement to ITU-T Study Group 15 regarding G.wnb, narrow-band wireless home networking (copy to ITU-R Study Group 1, Working Party 5D)     WP 5A   2012-06-05
[ 34 ]  
 
Liaison statement to Working Parties 5B, 5C and 5D (copy to Working Parties 1B, 4A, 4B, 4C, 6A, 7B, 7C, 7D for information) - Preparations for WRC-15 Agenda item 1.3 in response to decisions of CPM15-1     WP 5A   2012-06-05
[ 28 ]  
 
Liaison statement to Working Party 5B - (Copy to WP 5C and WP 5D for information) - WRC-15 Agenda item 1.15     WP 5A   2012-05-25
[ 26 ]  
 
Reply liaison statement to Working Party 4C (copy for information to Working Party 5D) - Impact of increased MSS emissions in the 2 483.5-2 500 MHz band     WP 5A   2012-05-22
Results:26 total items.
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  ITU-R Web coordinator
Updated : 2024-4-28