International Telecommunication Union   ITU
Français  Espańol
 
Site map Contact Us Print version
  Home : ITU-R : WP4B : Contributions  Recently posted -  Search Meeting Documents
   
ITU-R WP4B  C 

ITU-R WP4B

Systems, air interfaces, performance and availability objectives for FSS, BSS and MSS, including IP-based applications and satellite news gathering

Results:196 total items.
Result page:  Previous -  1 - 2 - 3 - 4  - Next Next
Contributions  Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 121 ]  
 
Question ITU-R 136-2/6     SG 6     2013-10-22
[ 120 ]  
+Ann.1-11 
Report on the thirty-fifth meeting of Working Party 4B (Geneva, 30 September - 4 October 2013)     Chairman, WP 4B     2013-10-04
[ 119 ]  
 
Final List of Participants - Working Party 4B (Geneva, 30 September - 4 October 2013)     Director, BR     2013-10-04
[ 118 ]  
 
List of documents issued (Documents 4B/94 - 4B/118)     BR Study Groups Department     2013-09-27
[ 117 ]  
 
Edits to draft new Recommendation ITU-R S.[DIGCID] on Carrier ID - A carrier identification system for fixed-satellite service (FSS) occasional use (OU) carrier earth station transmissions to geostationary-satellite orbit space stations in the 4/6 GHz and 11-12/13/14 GHz FSS bands to allow the identification of the source and eliminate unacceptable interference     United States of America     2013-09-22
[ 116 ]  
 
Working document towards a preliminary draft new Report or Recommendation on short term error performance     United States of America     2013-09-22
[ 115 ]  
 
Proposed modification of Recommendation ITU-R M.1850-1 - Interface H specifications update (section 4.3)     United States of America     2013-09-22
[ 114 ]  
 
Draft reply liaison statement to ITU-R Working Party 5D - (Copied to ITU-D Study Group 2 Question 25/2, ITU-T Study Group 13 Question 15/13 and ITU-R Working Party 4B for information) - Handbook on "Global trends in IMT"     China (People's Republic of)     2013-09-23
[ 113 ]  
 
[Preliminary] draft new Recommendation ITU-R M.[IMT-ADVANCED-SAT] - Detailed specifications of the radio interfaces for the satellite component of International Mobile Telecommunications-Advanced (IMT-Advanced): BMSat     China (People's Republic of)     2013-09-23
[ 112 ]  
 
Liaison statement - Request to provide security contacts     ITU-T SG 17     2013-09-23
[ 111 ]  
 
Recommendation ITU-R SM.1541-5 - Unwanted emissions in the out-of-band domain     SG 1     2013-09-19
[ 110 ]  
 
Working Document towards a preliminary draft new Report "Multi-dimensional signal mapping technique for satellite communications"     Japan   46-3/4   2013-09-18
[ 109 ]  
 
Working Document towards a draft revision of Report ITU-R S.2173 - Multi-carrier based transmission techniques for satellite systems     Japan   46-3/4   2013-09-18
[ 108 ]  
 
Working Document towards a preliminary draft new Recommendation ITU-R S.[DIGCID] - A carrier identification system for digital-modulation transmissions for fixed-satellite service (FSS) occasional use (OU) carrier earth station transmissions to geostationary-satellite orbit space stations in the 4-6 GHz and 11-12/13/14 GHz FSS bands to identify harmful interference     Japan   271/4   2013-09-18
[ 107 ]  
 
Proposed modification to Working Document (for Working Party 4B for information purpose only) - Possible modification of Recommendation ITU-R S.1432-1 and development of long-term and short term interference criteria     Japan     2013-09-18
[ 106 ]  
 
Proposed draft new Recommendation ITU-R M.[IMT-ADVANCED-SAT] - Detailed specifications of the radio interfaces for the satellite component of International Mobile Telecommunications-Advanced (IMT-Advanced)     Korea (Republic of)     2013-09-17
[ 105 ]  
 
Liaison Statement to ITU-R WP 4B about "Terminology used for networks using both satellite and terrestrial links"     European Telecommunications Standards Institute     2013-09-13
[ 104 ]  
 
Liaison statement to ITU-R Study Groups 4, 6 and 7 and to ITU-T Study Group 5 - The effect on Telecommunications of an extreme solar event     WP 3L     2013-07-25
[ 103 ]  
 
Liaison statements on new versions of the Access Network Transport (ANT) Standardization overview and Work plan     ITU-T SG 15     2013-07-25
[ 102 ]  
 
Liaison statement to ITU-D Study Group 2 Question 25/2, ITU-T Study Group 13 Question 15/13, ITU-R Working Party 4B - Work progress on development of Handbook on "Global trends in IMT"     WP 5D     2013-07-22
[ 101 ]  
 
Liaison statement to Study Group 4, Working Party 5B, Study Group 7 and ICAO - Request for measured data in connection with Question ITU-R 233/3 and Recommendation ITU-R P.528     WP 3K   233/3   2013-07-05
[ 100 ]  
 
Liaison statement to Working Parties 4B and 5B on airborne propagation - WRC-15 agenda item 1.5     WP 3M     2013-07-01
[ 99 ]  
 
Liaison statement to ITU-R Working Party 4B - Information about the use of FSS systems in disaster response and relief     ITU-T FG DR&NRR     2013-06-13
[ 98 ]  
 
Liaison statement to Joint Task Group 4-5-6-7 (copy for information to Working Parties 4A, 4B, 4C, 5B, 5C, 5D, 6A, 7B, 7C, 7D, 1A, 3K, 3M) - Reply liaison statement on spectrum requirements for terrestrial mobile broadband (excluding IMT) related to WRC-15 agenda item 1.1     WP 5A     2013-06-04
[ 97 ]  
 
Liaison statement on technical characteristics of wireless aids for hearing impaired people operating in the VHF and UHF frequency range (COM 16-LS 14) [to ITU-R WP 5A and ITU-T SG 16]     ITU-T JCA-AHF     2013-05-23
[ 96 ]  
 
Liaison statement to Working Parties 4B and 5B - Guidance on the application of recommendations on radio wave propagation to unmanned aircraft systems (WRC-15 agenda item 1.5)     WP 3M     2013-05-17
[ 95 ]  
 
Liaison statement on nomination of JCA-AHF representatives     ITU-T JCA-AHF     2013-05-14
[ 94 ]  
+Ann.1-11 
Report on the thirty-fourth meeting of Working Party 4B (Geneva, 29 April - 3 May 2013)     Chairman, WP 4B     2013-05-03
[ 93 ]  
 
Final list of participants - Working Party 4B (29 April - 3 May 2013)     Director, BR     2013-05-03
[ 92 ]  
 
Liaison Statement from ITU-D Question 22-1/2 to ITU-T SGs 5 and 15, ITU-T FG on DR&NRR and ITU-R Working Party 4B     ITU-D SG 2     2013-05-01
[ 91 ]  
 
List of documents issued (Documents 4B/55 - 4B/91)     BR Study Groups Department     2013-04-26
[ 90 ]  
 
[Draft] new Recommendation ITU-R S.[GENACC] - Access procedures for fixed-satellite service (FSS) occasional use (OU) carrier earth station transmissions to geostationary-satellite orbit space stations in the 4/6 GHz and 11-12/13/14 GHz FSS bands     United States of America     2013-04-19
[ 89 ]  
 
Preliminary draft new Report ITU-R S.[VSAT] - Use of very small aperture terminals (VSATs)     United States of America     2013-04-19
[ 88 ]  
 
WRC-15 Agenda item 1.5 - Working document on the assessment of the availability achieved by typical FSS links in the 17.3 - 20.2 GHz and 27.5 - 30.0 GHz bands     United Kingdom of Great Britain and Northern Ireland     2013-04-22
[ 87 ]  
 
Draft reply liaison statement to ITU-R Working Party 5B - WRC-15 Agenda item 1.5     Germany (Federal Republic of)     2013-04-22
[ 86 ]  
 
ICT sectorial consultation on the role of ICTS to promote the inclusion of persons with disabilities - Request for inputs from relevant ITU-R Study Groups     Note by the Secretary-General     2013-04-19
[ 85 ]  
 
Working document towards a preliminary draft new Recommendation ITU-R M.[IMT-ADVANCED-SAT] - Detailed specifications of the radio interfaces for the satellite component of International Mobile Telecommunications-Advanced (IMT-Advanced): LTE-Satellite     China (People's Republic of)     2013-04-19
[ 84 ]  
 
Question ITU-R 136-1/6 - Worldwide broadcasting roaming     SG 6     2013-04-19
[ 83 ]  
 
Proposed addition to the preliminary draft new Recommendation ITU-R S.[GENACC] - Access procedures for fixed-satellite service occasional use (OU) carrier earth station transmissions to geostationary-satellite orbit space stations     Japan     2013-04-18
[ 82 ]  
 
Draft new Report ITU-R S.[VSAT] - Use of very small aperture terminals (VSATs)     Japan     2013-04-18
[ 81 ]  
 
Working document - Proposal on revision of the preliminary draft new Report ITU-R S.[VSAT] - Use of very small aperture terminals (VSATs)     Russian Federation     2013-04-17
[ 80 ]  
 
Status report of the Focus Group on Disaster Relief Systems, Network Resilience and Recovery (FG-DR&NRR)     ITU-T FG-DR&NRR     2013-04-17
[ 79 ]  
 
Proposed draft new Report ITU-R M.[SAT-IMT-OUTCOME] - Outcome of the evaluation, consensus building and decision of the IMT-Advanced satellite process (Steps 4 to 7), including characteristics of IMT-Advanced satellite radio interfaces     Korea (Republic of)     2013-04-16
[ 78 ]  
 
Proposed preliminary draft new Recommendation ITU-R M.[IMT-ADVANCED-SAT] - Detailed specifications of the radio interfaces for the satellite component of international mobile telecommunications-advanced (IMT-Advanced)     Korea (Republic of)     2013-04-16
[ 77 ]  
 
Liaison statement from ITU-D SG2 Question 25/2 to ITU-R Working Parties 4A, 4B and 4C on the Report on Access technology for broadband telecommunications including IMT, for developing countries     ITU-D SG 2     2013-04-11
[ 76 ]  
 
Liaison statement to ITU-D Study Group 2, ITU-T Study Group 13 Question 15/13, ITU-R Working Parties 5C and 4B - Work progress on development of Handbook on "Global trends in IMT"     WP 5D     2013-02-18
[ 75 ]  
 
Liaison statement to JTG 4-5-6-7 (copy to WPs 4A, 4B, 4C, 5A, 5B, 5C, 6A, 7B, 7C, 7D, 1A, 3K, 3M) - Further elaboration on suitable frequency ranges and their suitability - WRC-15 Agenda item 1.1     WP 5D     2013-02-18
[ 74 ]  
 
Liaison statement to Joint Task Group 4-5-6-7 (copy to WPs 4A, 4B, 4C, 5A, 5B, 5C, 6A, 7B, 7C, 7D, (WPs 1A, 3K, 3M)) - Suitable frequency ranges above 6 GHz     WP 5D     2013-02-18
[ 73 ]  
 
Liaison statement to Study Groups 4, 5, 6 and 7 and Working Parties 4A, 4B, 4C, 5A, 5B, 5C, 5D, 6A, 7B, 7C and 7D as concerned Groups for WRC-15 Agenda item 1.1 - Preparations for WRC-15 Agenda item 1.1 - Technical and operational characteristics     JTG 4-5-6-7     2012-12-06
[ 72 ]  
 
Liaison statement to Radiocommunication Study Group 4 and note to the Director, Radiocommunication Bureau - Proposal for exploring the possibility of additional/supplementary search tool(s) to identify ITU-R Recommendations of the "M"-series by frequency bands and applications     SG 5     2012-11-28
Results:196 total items.
Result page:  Previous -  1 - 2 - 3 - 4  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  ITU-R Web coordinator
Updated : 2015-09-24