International Telecommunication Union   ITU
Français  Espańol
 
Site map Contact Us Print version
  Home : ITU-R : WP4A-AR : Contributions  Recently posted -  Search Meeting Documents
   
ITU-R WP4A-AR  C 

ITU-R WP4A-AR

Efficient Orbit/Spectrum Utilization for FSS and BSS

Results:141 total items.
Result page:  1 - 2 - 3 - 4 - 5 - 6  - Next Next
Contributions  [ Source: United States of America ]   Documents / Contributions
 
Number 
Received Source Title
[ 362 ]  
 
2014-06-23 United States of America   Preliminary draft new Recommendation ITU-R S.[GSO FSS E/S IN 29.5-30.0 GHz] - Technical and operational requirements for earth stations on moving platforms operating with geostationary FSS satellite networks in the bands 29.5-30.0/19.7-20.2 GHz    
[ 361 ]  
 
2014-06-23 United States of America   Working document towards a preliminary draft revision of Report ITU-R S.2223 - Technical and operational studies towards developing elements to be included in Report ITU-R S.2223 regarding earth stations on mobile platforms in the 17.3-20.2 and 27.5-30.0 GHz bands of the geostationary-satellite orbit fixed-satellite service    
[ 360 ]  
 
2014-06-23 United States of America   Preliminary draft new Recommendation ITU-R SF.[INTERF.AREA] - Possible methodolgy for frequency sharing between ubiquitously deployed earth stations of the fixed-satellite service and stations of the terrestrial services in adjacent areas for sharing stituations described in Appendix 7 of the Radio Regulations    
[ 359 ]  
 
2014-06-23 United States of America   Review of the Inter-regional sharing provisions contained in Annex 7 to Appendix 30    
[ 358 ]  
 
2014-06-23 United States of America   Review of the situation surrounding bringing into use and notification of frequency assignments    
[ 357 ]  
 
2014-06-23 United States of America   Proposal for modification of draft CPM text for WRC-15 agenda item 9.1.3    
[ 356 ]  
 
2014-06-23 United States of America   Working document towards a preliminary draft new Report ITU-R S.[FSS 7/8 GHZ COMPATIBILITY] - Compatibility studies between the fixed-satellite service and the terrestrial and other space services in the frequency bands 7 150-7 250 MHz (space-to-Earth) and 8 400-8 500 MHz (Earth-to-space)    
[ 355 ]  
 
2014-06-23 United States of America   Interference for FSS GSO satellites to SRS spacecraft in the 7 150-7 235 MHz band using a modified E.I.R.P. spectral density mask - WRC-15 agenda item 1.9.1    
[ 354 ]  
 
2014-06-23 United States of America   Proposed revision of working document - Draft CPM text on WRC-15 agenda item 1.9.1    
[ 353 ]  
 
2014-06-23 United States of America   Proposed modifications to the working document draft CPM text on WRC-15 agenda item 9.1, issue 9.1.2    
[ 352 ]  
 
2014-06-23 United States of America   Further considerations of issue [G] - Failure of a [newly launched] satellite during the ninety-day bringing into use period    
[ 351 ]  
 
2014-06-23 United States of America   Draft CPM text on agenda item 7, issue D - Possible methods to mitigate excessive filings    
[ 350 ]  
 
2014-06-23 United States of America   Revision of draft CPM text on WRC-15 agenda item 7 - Informing the BR of a suspension under RR No. 11.49 beyond six months (Issue A)    
[ 349 ]  
 
2014-06-23 United States of America   Draft CPM text on WRC-15 agenda item 1.8    
[ 348 ]  
 
2014-06-23 United States of America   Working document - Draft CPM text on WRC-15 agenda item 1.7    
[ 347 ]  
 
2014-06-23 United States of America   Proposed revisions to the working document towards a preliminary draft new Report ITU-R S.[R2R3.FSS] - Assessment on use of spectrum in the 10-17 GHz band for the GSO fixed-satellite service in Region 2, Region 3    
[ 346 ]  
 
2014-06-23 United States of America   Proposed revisions to the working document towards a preliminary draft new Report ITU-R S.[R1.FSS] - Assessment on use of spectrum in the 10-17 GHz band for the GSO fixed-satellite service in Region 1    
[ 345 ]  
 
2014-06-23 United States of America   EESS (active), aeronautical navigation and FSS (E-s) sharing study for the 13.25-13.75 GHz band    
[ 344 ]  
 
2014-06-23 United States of America   Revision of draft CPM text on WRC-15 agenda items 1.6.1 and 1.6.2: 13.25-13.75 GHz    
[ 343 ]  
 
2014-06-23 United States of America   FSS distribution model    
[ 342 ]  
 
2014-06-23 United States of America   Working document - Draft CPM text on WRC-15 agenda items 1.6.1 and 1.6.2    
[ 341 ]  
 
2014-06-23 United States of America   Working document towards a preliminary draft new Report ITU-R S.[R2R3.FSS] - Assessment on use of spectrum in the 13-17 GHz range for the GSO fixed-satellite service in Regions 2 and 3    
[ 340 ]  
 
2014-06-23 United States of America   Revision of preliminary draft new Report ITU-R S.[R2R3.FSS]    
[ 339 ]  
 
2014-06-23 United States of America   Revisions to Annex 10 to Working Party 4A Chairman's Report - Working document towards a preliminary draft new Report ITU-R S.[R2R3.FSS] - WRC-15 agenda item 1.6    
[ 338 ]  
 
2014-06-23 United States of America   Revision of draft CPM text on WRC-15 agenda items 1.6.1 and 1.6.2    
Results:141 total items.
Result page:  1 - 2 - 3 - 4 - 5 - 6  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

 

Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  ITU-R Web coordinator
Updated : 2014-12-25