International Telecommunication Union   ITU
Français  Espańol
 
Site map Contact Us Print version
  Home : ITU-R : WP4A-AR : Contributions  Recently posted -  Search Meeting Documents
   
ITU-R WP4A-AR  C 

ITU-R WP4A-AR

Efficient Orbit/Spectrum Utilization for FSS and BSS

Results:407 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16 - 17  - Next Next
Contributions  Documents / Contributions
 
Number 
Received Source Title Questions
[ 182 ]  
 
2013-09-24 Sweden   WRC-15 agenda item 1.6 - Sharing feasibility between FSS (Earth-to-space) and RLS in the frequency band 15.4-17.3 GHz     N/A  
[ 181 ]  
 
2013-09-24 International Civil Aviation Organization   Sustainable frequency spectrum availability for the operation of fixed satellite service based aeronautical VSAT networks in support of the global ATM concept     N/A  
[ 180 ]  
 
2013-09-23 Germany (Federal Republic of)   Proposal for preliminary draft new Recommendation ITU-R S.[FSS-REF_FOR_UAS] - WRC-15 agenda item 1.5     N/A  
[ 179 ]  
 
2013-09-20 United States of America   Proposed revision of the working document towards a PDN Report ITU-R S.[FSS 7/8 GHz COMPATIBILITY] - Compatibility studies between FSS and terrestrial and other space services in the frequency bands 7150-7250 MHz (s-E) and 8400-8500 MHz (E-s)     N/A  
[ 178 ]  
 
2013-09-20 United States of America   Preliminary results for sharing between potential new FSS allocations in the frequency bands between 10-17 GHz (Region 1) and 13-17 GHz (Regions 2 and 3) and existing SRS (s-E), (E-s) and (s-s)     N/A  
[ 177 ]  
 
2013-09-20 United States of America   Draft liaison statement to ITU-R Working Party 5B - Coordination and harmful interference in FSS networks     N/A  
[ 176 ]  
 
2013-09-20 United States of America   Working documents towards a preliminary draft new [Report/Recommendation] ITU-R S.[FSS/BSS]     N/A  
[ 175 ]  
 
2013-09-20 United States of America   Further evaluation of the applicability of the value of 6% ?T/T for triggering coordination between geostationary fixed-satellite service networks     N/A  
[ 174 ]  
 
2013-09-20 United States of America   Working document towards a draft new Recommendation/Report ITU-R S.[FSS-REF FOR UAS]     N/A  
[ 173 ]  
 
2013-09-20 United States of America   Draft liaison statement to Working Party 5D - Comments from Working Party 4A on the compatibility study between fss networks and IMT systems in the band 3 400-3 600 MHz for small cell deployments     N/A  
[ 172 ]  
 
2013-09-20 United States of America   Working document towards a preliminary draft revision of Recommendation ITU-R S.1855     N/A  
[ 171 ]  
 
2013-09-20 United States of America   Working document towards a preliminary draft new Recommendation ITU-R SF.[AREA COORD]     N/A  
[ 170 ]  
 
2013-09-20 United States of America   Interference protection of co-frequency stations from transmissions by earth stations on board vessels operating in fixed satellite service networks     N/A  
[ 169 ]  
 
2013-09-20 United States of America   Working document towards a prelimnary draft new Report on the intent and application of Recommendation ITU-R S.1432-1     N/A  
[ 168 ]  
 
2013-09-20 United States of America   Working document towards text for the draft Report to the Conference Preparatory Meeting (CPM) on WRC-15 agenda item 1.7     N/A  
[ 167 ]  
 
2013-09-20 United States of America   Futher thoughts on simplification of radio regulation regime on space services - WRC-15 agenda item 7     N/A  
[ 166 ]  
 
2013-09-20 United States of America   Draft CPM Text on WRC-12 agenda item 7 - Modifications to No. 11.49     N/A  
[ 165 ]  
 
2013-09-20 United States of America   New databank items - Addition of USASAT-70O and USASAT-71L technical characteristics to the electronic databank     N/A  
[ 164 ]  
 
2013-09-20 United States of America   Preliminary draft new Report ITU-R S.[BROADBAND BY FSS] - Broadband access by fixed-satellite service systems     N/A  
[ 163 ]  
 
2013-09-20 United States of America   Working document towards a preliminary draft new Report ITU-R S.[FSS 7/8 GHz Compatibility] - Compatibility studies between the fixed-satellite service and the terrestrial and other space services in the frequency bands 7 150-7 250 MHz (space-to-Earth) and 8 400-8 500 MHz (Earth-to-space)     N/A  
[ 162 ]  
 
2013-09-20 United States of America   Working document towards a preliminary draft new Report ITU-R S.[R2R3.FSS] - Assessment on use of spectrum in the 13-17 GHz range for the GSO fixed-satellite service in Regions 2 and 3     N/A  
[ 161 ]  
 
2013-09-19 Russian Federation   Feasibility estimation for sharing between fixed-satellite service (Space-to-Earth) and Space operations service (Earth-to-Space) IN 7 GHz band     N/A  
[ 160 ]  
 
2013-09-19 Russian Federation   Sharing feasibility of the fixed satellite service (Space-to-Earth) with the Earth exploration satellite service (active) in the frequency range 13.25-13.75 GHz     N/A  
[ 159 ]  
 
2013-09-19 Russian Federation   Working document - Elements to the text of CPM Report, agenda items 9.1.2 and 7     N/A  
[ 158 ]  
 
2013-09-19 Russian Federation   Draft liaison statement to Working Party 5C - WRC-15 agenda item 1.6.1     N/A  
Results:407 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16 - 17  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

 

Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  ITU-R Web coordinator
Updated : 2014-10-16