International Telecommunication Union   ITU
Français  Espańol
 
Site map Contact Us Print version
  Home : ITU-R : WP4A : Contributions  Recently posted -  Search Meeting Documents
   
ITU-R WP4A  C 

ITU-R WP4A

Efficient Orbit/Spectrum Utilization for FSS and BSS

Results:681 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14  - Next Next
Contributions  Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 56 ]  
 
Recommendations ITU-R F.1245-2 and ITU-R F.1336-3 to be brought to the attention of Study Groups 4 and 7     SG 5     2012-06-01
[ 55 ]  
 
Liaison statement to Joint Task Group 4-5-6-7 - WRC-15 Agenda item 1.1 (copy to Working Party 1A, Working Party 3K, Working Party 3M, Working Party 4A, Working Party 4B, Working Party 4C, Working Party 5A, Working Party 5C, Working Party 5D and Working Party 7C for information)     WP 5B     2012-06-01
[ 54 ]  
 
Liaison statement to Working Party 4A - Fixed service characteristics, protection criteria and modelling for WRC-15 Agenda item 1.9.1     WP 5C     2012-05-29
[ 53 ]  
 
Liaison statement to Working Party 4A - Fixed service characteristics, protection criteria and modelling for WRC-15 Agenda item 1.8     WP 5C     2012-05-29
[ 52 ]  
 
Liaison statement to Working Party 4A - Fixed service characteristics, protection criteria and modelling for WRC-15 Agenda item 1.6.2     WP 5C     2012-05-29
[ 51 ]  
 
Liaison statement to Working Party 4A - Fixed service characteristics, protection criteria and modelling for WRC-15 Agenda item 1.6.1     WP 5C     2012-05-29
[ 50 ]  
 
Liaison statement to Working Party 4A - Draft revision of Recommendation ITU-R SF.674-2     WP 5C     2012-05-29
[ 49 ]  
 
Liaison statement of Working Parties 4A and 7C - Proposed suppression of Recommendations ITU-R F.760-1 and ITU-R F.1502     WP 5C     2012-05-29
[ 48 ]  
 
List of documents issued     BR Study Groups Department     2012-05-29
[ 47 ]  
 
Liaison statement to Working Parties 4A, 5A, 5B, 5C, 7A, 7B, 7C and 7D (Copy to Working Parties 4B and 3M for information) - WRC-15 Agenda item 1.10     WP 4C     2012-05-28
[ 46 ]  
 
Liaison statement to Working Parties 4A, 5A, 5B, 5C, 7A, 7B, 7C and 7D (Copy to Working Parties 4B and 3M for information) - WRC-15 Agenda item 1.10     WP 4C     2012-05-28
[ 45 ]  
 
Liaison statement to Working Parties 4A, 5A, 5C and 7B (copy to Working Parties 3M, 4B and 5B for information) - WRC-15 Agenda item 1.9.2     WP 4C     2012-05-28
[ 44 ]  
 
Liaison Statement to ITU-R Working Party 4A - WRC-15 Agenda item 1.6     WP 5B     2012-05-25
[ 43 ]  
 
Improvement of the RR Appendix 30 BSS receiving stations reference antenna pattern for Regions 1 and 3 as an opportunity for more efficient use of the spectrum/orbit resources for BSS systems and facilitation of the access to these resources by new comers     Bulgaria (Republic of)     2012-05-23
[ 42 ]  
 
Protection criteria and application of RR No. 9.41 (studies in response to resolves 1 of Resolution COM 5/5)     Asia Satellite Telecommunications Co. Ltd. (AsiaSat)     2012-05-23
[ 41 ]  
 
Proposed liaison statement to Working Party 5D - Techniques designed to increase the potential for sharing between IMT systems and FSS networks in the 3 400-3 600 MHz band     Asia Satellite Telecommunications Co. Ltd. (AsiaSat)     2012-05-23
[ 40 ]  
 
Preliminary draft new Recommendation and preliminary draft new Report ITU-R [SF].[STATMETH] - A methodology to use statistical variables as inputs in simulating the interference from FSS and BSS satellites to FS stations in frequency bands above about 17 GHz     Finland     2012-05-23
[ 39 ]  
 
Proposed draft liaison statement to JTG 4-5-6-7 on WRC-15 Agenda item 1.1     United States of America     2012-05-22
[ 38 ]  
 
Working document on information related to WRC-15 agenda items 1.6.1/1.6.2: Receiver characteristics of EESS (active) in the 13.25-13.75 GHz band     United States of America     2012-05-22
[ 37 ]  
 
Working Document towards a Preliminary Draft New Report on the interference effect of transmissions from earth stations on board vessels operating in fixed-satellite service networks on fixed service stations     United States of America     2012-05-22
[ 36 ]  
 
Working document on issues related to earth stations on mobile platforms operating in geostationary fixed-satellite service networks in the 17.3 to 30.0 GHz band     United States of America     2012-05-22
[ 35 ]  
 
Preliminary draft new Recommendation ITU-R S.[TIME_VAR_SMALL_E/S] - Statistical methodology to assess time-varying interference produced by a network of small earth stations operating with TDMA schemes onto geostationary fixed-satellite service networks     United States of America   208/4   2012-05-22
[ 34 ]  
 
Preliminary draft new Recommendation on the technical and operational requirements for earth stations on mobile platforms operating in non-GSO FSS systems in the frequency bands from 17.3 to 19.3, 19.7 to 20.2, 27 to 29.1 and from 29.5 TO 30.0 GHz     United States of America     2012-05-22
[ 33 ]  
 
Working document towards a Preliminary Draft New Report ITU-R F.[R1.FSS] on additional FSS (GSO) in ITU Region 1     United States of America     2012-05-22
[ 32 ]  
 
Working document towards a preliminary draft new Report ITU-R F.[R2R3.FSS] on additional FSS (GSO) in ITU Regions 2 and 3     United States of America     2012-05-22
[ 31 ]  
 
Draft liaison statement to Working Party 5B - Attributes of the fixed satellite service to support safe operation of UAS in non-segregated air space     United States of America     2012-05-22
[ 30 ]  
 
Examination under § 2.2 of Annex 4 of Appendix 30B     Luxembourg     2012-05-22
[ 29 ]  
 
Propose modification to preliminary draft new Report ITU-R S.[ASYM.FSS] - Addressing the exciting asymmetry in the unplanned FSS uplink/downlink spectrum in the 10-15 GHz band     Asia Satellite Telecommunications Co. Ltd. (AsiaSat)     2012-05-22
[ 28 ]  
 
Current and future usage of the frequency band 13.25-13.75 GHz by EESS (active)     France     2012-05-21
[ 27 ]  
(Rev.1) 
Summary of results of the RA-12 and CPM15-1     Chairman, SG 4     2012-05-18
[ 26 ]  
 
Application of Article 2A to Appendices 30 and 30A     Radiocommunication Bureau     2012-05-16
[ 25 ]  
 
Examination under §2.2 of Annex 4 of Appendix 30B     Radiocommunication Bureau     2012-05-16
[ 24 ]  
 
Working document towards a preliminary draft revision of Recommendation ITU-R BO.1898 - Power flux-density value required for the protection of receiving earth stations in the broadcasting-satellite service in Regions 1 and 3 from emissions by a station in the fixed and/or mobile services in the band 21.4-22 GHz     Korea (Republic of)     2012-05-15
[ 23 ]  
 
Proposed revision of Report ITU-R S.2151 - Use and examples of systems in the fixed-satellite service in the event of natural disasters and similar emergencies for warning and relief operations (for Working Party 4A for information purpose only)     Japan     2012-05-15
[ 22 ]  
 
Items to be studied in association with Resolution 756 (WRC-12)     Japan     2012-05-15
[ 21 ]  
 
Preliminary draft new Report ITU-R S. [VSAT] - Use of very small aperture terminals (VSATs)     Japan     2012-05-15
[ 20 ]  
 
Working document towards a preliminary draft new Report ITU-R S.[VSAT] Technical and operational requirements for use of very small aperture terminals (VSATs)     Russian Federation     2012-05-12
[ 19 ]  
 
Assessment of the orbital-frequency resource occupied by the GSO satellite communication system     Russian Federation     2012-05-12
[ 18 ]  
 
Consideration of possible frequency bands for a new primary allocation to the fixed-satellite service of 250 MHz in frequency bands between 10 and 17 GHz in Region 1     Russian Federation     2012-05-12
[ 17 ]  
 
On the revision of the value of the criterion of the permissible interference between GSO satellite systems     Russian Federation     2012-05-12
[ 16 ]  
 
Future updating of the Recommendations and other ITU-R texts under joint responsibility of Study Groups 4 and 5     Chairmen, SGs 4 and 5     2012-05-08
[ 15 ]  
 
Liaison statement to ITU-R Study Group 4     ITU-D SG 2     2012-05-07
[ 14 ]  
 
Liaison statement - Resolution ITU-R 60     ITU-T SG 5     2012-05-07
[ 13 ]  
 
Working document on coordination arc for 20/30 GHz FSS     United States of America     2012-05-01
[ 12 ]  
 
Working document towards a preliminary draft new Report or Recommendation ITU-R S.[FSS-5GHZ ARNS compatibility]     United States of America     2012-05-01
[ 11 ]  
 
Preliminary draft revision of Recommendation ITU-R S.732 - Method for statistical processing of earth-station antenna side-lobe peaks     United States of America     2012-05-01
[ 10 ]  
 
Draft liaison statement to JTG 4-5-6-7 - Compatibility of the fixed-satellite service (FSS) with broadband wireless access (BWA) in the band 3 400-4 200 MHz     United States of America     2012-05-01
[ 9 ]  
(Rev.2) 
WRC Resolutions and Recommendations related to the work of Study Group 4     Chairman, SG 4     2012-04-25
[ 8 ]  
(Rev.3) 
Assignment of the Study Group 4 texts to the Working Parties     Chairman, SG 4     2012-04-25
[ 7 ]  
 
Question ITU-R 212-4/5 to be brought to the attention of Study Groups 1, 4 and 7     SG 5     2012-04-24
Results:681 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  ITU-R Web coordinator
Updated : 2015-11-16