Contributions |
|
Number
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 106 ]
|
Working document towards a preliminary draft new Recommendation on the use of earth stations on mobile platforms operating with GSO FSS networks in bands within the frequency ranges 20/30 GHz
|
United States of America
|
70-1/4
|
2012-09-11 |
|
[ 105 ]
|
Initial evaluation of the applicability of the value of 6% ?T/T for triggering coordination between geostationary fixed-satellite service networks
|
United States of America
|
|
2012-09-11 |
|
[ 104 ]
|
Working document - Information related to Agenda item 9.1.2 - Size of the coordination arc for triggering coordination under RR No. 9.7
|
United States of America
|
|
2012-09-11 |
|
[ 103 ]
|
Preliminary draft new Report ITU-R S.[ESV] on the interference effect of transmissions from earth stations on board vessels operating in fixed-satellite service networks on co-frequency stations
|
United States of America
|
|
2012-09-11 |
|
[ 102 ]
|
Draft new Report on the technical and operational requirements for earth stations on mobile platforms operating in non-GSO FSS systems in the frequency bands from 17.3 to 19.3, 19.7 to 20.2, 27 to 29.1 and 29.5 to 30.0 GHz
|
United States of America
|
70-1/4
|
2012-09-11 |
|
[ 101 ]
|
Comments on the development of the epfd software
|
United States of America
|
|
2012-09-11 |
|
[ 100 ]
|
Expansion of working document towards a preliminary draft new Report ITU-R S.[R2R3.FSS] - Assessment on use of spectrum in the 13-17 GHz range for the fixed-satellite service in Regions 2 and 3 (GSO)
|
United States of America
|
|
2012-09-11 |
|
[ 99 ]
|
Expansion of working document towards a preliminary draft new Report ITU-R S.[R1.FSS] - Assessment on use of spectrum in the 10-17 GHz band for the fixed-satellite service in Region 1 (GSO)
|
United States of America
|
|
2012-09-11 |
|
[ 98 ]
|
Draft outline and preliminary material for the draft CPM Report to WRC-15 for Agenda items 1.6.1 and 1.6.2 in Chapter 4, Satellite services - Sub-Chapter 4.1, Fixed-satellite service, Agenda item 1.6
|
United States of America
|
|
2012-09-11 |
|
[ 97 ]
|
Working document towards a preliminary draft new Report ITU-R S.[FSS 7/8 GHz] on the feasibility of a new FSS allocation in Region 7/8 GHz range
|
France
|
|
2012-09-11 |
|
[ 96 ]
|
Proposed liaison statement to Working Party 5C - Fixed service characteristics, protection criteria and modelling for WRC-15 Agenda item 1.9.1
|
France
,
Luxembourg
,
Norway
,
Sweden
,
United Kingdom of Great Britain and Northern Ireland
|
|
2012-09-11 |
|
[ 95 ]
|
Preliminary draft revision of Recommendation ITU-R S.1503-1
|
United Kingdom of Great Britain and Northern Ireland
|
|
2012-09-11 |
|
[ 94 ]
|
Working document towards draft CPM text on WRC-15 Agenda item 1.7
|
Canada
|
|
2012-09-10 |
|
[ 93 ]
|
Draft liaison statement to Working Party 5B - WRC-15 Agenda item 1.7
|
Canada
|
|
2012-09-10 |
|
[ 92 ]
|
Examination under § 2.2 of Annex 4 of RR Appendix 30B
|
Israel (State of)
|
|
2012-09-10 |
|
[ 91 ]
|
Working document towards revision of the current ITU-R Recommendations which established criterion of the permissible interference between GSO satellite systems
|
Russian Federation
|
|
2012-09-07 |
|
[ 90 ]
|
Working document towards preliminary draft new Report ITU-R S.[FSS 7/8 GHz Compatibility] - Compatibility studies of the fixed satellite service with the existing and planned ground and space services in the frequency bands 7 150-7 250 MHz (space-to-Earth) and 8 400-8 500 MHz (Earth-to-space)
|
Russian Federation
|
|
2012-09-07 |
|
[ 89 ]
|
The publication of information on bringing into use of the satellite network on the ITU web site
|
Russian Federation
|
|
2012-09-07 |
|
[ 88 ]
|
Preliminary draft new Report ITU-R S.[SPECTRUM-ORBIT-RESOURCE] - Assessment of the orbital-frequency resource used by a GSO satellite communication system
|
Russian Federation
|
|
2012-09-07 |
|
[ 87 ]
|
Proposed modifications to working document towards a preliminary draft new Report ITU-R S.[R1.FSS]
|
Russian Federation
|
|
2012-09-07 |
|
[ 86 ]
|
Recommendation ITU-R BT.1833-2 to be brought to the attention of Study Group 4
|
SG 6
|
|
2012-09-10 |
|
[ 85 ]
|
Proposed modification to the working document - Technical criteria used in application of RR No. 9.41 in respect of coordination under RR No. 9.7
|
Japan
|
|
2012-09-05 |
|
[ 84 ]
|
Preliminary draft new Report ITU-R S.[VSAT] - Use of very small aperture terminals (VSATs) operating in fixed satellite service networks
|
Japan
|
|
2012-09-05 |
|
[ 83 ]
|
Working document towards a preliminary draft new Report ITU-R S.[R1.FSS] - Assessment on use of spectrum in the 10-17 GHz band for the fixed-satellite service in Region 1 (GSO)
|
Korea (Republic of)
|
|
2012-09-05 |
|
[ 82 ]
|
Working document towards a preliminary draft new Report ITU-R S.[R2R3.FSS] - Assessment on use of spectrum in the 13-17 GHz band for the fixed-satellite service in Regions 2 and 3 (GSO)
|
Korea (Republic of)
|
|
2012-09-05 |
|
[ 81 ]
|
Preliminary draft new Report ITU-R S. [VSAT] - Use of very small aperture terminals (VSATs) operating in fixed satellite service networks
|
Korea (Republic of)
|
|
2012-09-05 |
|
[ 80 ]
|
A preliminary draft revision of Recommendation ITU-R BO.1898 - Power flux-density value required for the protection of receiving earth stations in the broadcasting-satellite service in Regions 1 and 3 from emissions by a station in the fixed and/or mobile services in the band 21.4-22 GHz
|
Korea (Republic of)
|
|
2012-09-05 |
|
[ 79 ]
|
Survey of status of FSS assignments in the MIFR in the 10.95-30.0 GHz bands (WRC -15 Agenda item 1.5)
|
Director, BR
|
|
2012-09-04 |
|
[ 78 ]
|
Draft Liaison statement to Working Party 5B -Characteristics of FSS Coordination
|
United States of America
|
|
2012-08-30 |
|
[ 77 ]
|
Draft liaison statement to ITU-R Working Party 5B - WRC-15 Agenda item 1.7
|
United States of America
|
|
2012-08-30 |
|
[ 76 ]
|
Preliminary outline for draft CPM text on WRC-15 Agenda item 1.8
|
United States of America
|
|
2012-08-30 |
|
[ 75 ]
|
Working document towards a preliminary draft new Recommendation on alternative off-axis radiation patterns for earth station antennas
|
United States of America
|
|
2012-08-30 |
|
[ 74 ]
|
Draft new Recommendation ITU-R S.[TIME_VAR_SMALL_E/S] - Statistical methodology to assess time-varying interference produced by a network of small earth stations operating with TDMA schemes onto geostationary fixed-satellite service networks
|
United States of America
|
208/4
|
2012-08-30 |
|
[ 73 ]
|
Draft revision of Recommendation ITU-R S.732 - Method for statistical processing of earth-station antenna side-lobe peaks
|
United States of America
|
|
2012-08-30 |
|
[ 72 ]
|
Preliminary results for feasibility of FSS/SRS (deep-space) sharing in the frequency bands 7150-7190 MHz and 8400-8450 MHz
|
United States of America
|
|
2012-08-30 |
|
[ 71 ]
|
Assessment of Interference Potential between Proposed FSS and Existing SRS (s-E) Allocations in the 8 GHz Band
|
United States of America
|
|
2012-08-30 |
|
[ 70 ]
|
Liaison statement to Working Party 4A - Techniques designed to increase the potential for sharing between IMT systems and FSS networks in the 3 400-3 600 MHz band
|
WP 5D
|
|
2012-07-23 |
|
[ 69 ]
|
Liaison statement - Establishment of Focus Group on Disaster Relief Systems, Network Resilience and Recovery
|
Chairman, FG-DR&NRR
|
|
2012-07-03 |
|
[ 68 ]
|
Liaison statement to Working Party 4A - Handbook on ITU-R Propagation prediction methods for interference and sharing studies
|
WP 3M
|
|
2012-07-02 |
|
[ 67 ]
(Rev.1) |
Liaison statement to Working Parties 1A, 4A, 4C, 5A, 5B, 5C, 5D, 6A, 7B, 7C, 7D and Joint Task Group 4-5-6-7 - Handbook on ITU-R propagation prediction methods for interference and sharing studies
|
WP 3M
|
|
2012-06-29 |
|
[ 66 ]
|
Liaison statement to Working Parties 4A, 4B, 4C, 5A, 5B, 5C, 5D, 6A, 6B, 6C, 7B, 7C, 7D on further studies on cognitive radio systems (CRS)
|
WPs 1A and 1B
|
|
2012-06-25 |
|
[ 65 ]
|
Liaison statement to Joint Task Group 4-5-6-7 - WRC-15 Agenda item 1.1 (Copy to Working Parties 1A, 3K, 3M, 4A, 4B, 4C, 5A, 5C, 5D and 7C for information)
|
WP 5B
|
|
2012-06-22 |
|
[ 64 ]
|
Liaison statement to CISPR and ITU-R Working Parties 4A, 4C, 5A, 5B, 5C, 5D, 6A, 7B, 7C and 7D - A database for the protection of radio services
|
WP 1A
|
|
2012-06-19 |
|
[ 63 ]
|
Liaison statement to Study Groups 3, 4, 5, 7 and relevant Working Parties - Active services operating above 275 GHz
|
SG 1
|
|
2012-06-15 |
|
[ 62 ]
|
Liaison statement to ITU-R WPs 3K, 3M, 4A, 4C, 5A, 5C, 5D, 6A, 7B, 7C, 7D and the International Maritime Organization (IMO) and International Association of Marine AIDS to Navigation and Lighthouse Authorities (IALA) - World Radiocommunication Conference (WRC-15) Agenda item 1.15
|
WP 5B
|
|
2012-06-06 |
|
[ 61 ]
+Ann.1-24 |
Report on the meeting of Working Party 4A (Geneva, 30 May - 6 June 2012)
|
Chairman, WP 4A
|
|
2012-06-06 |
|
[ 60 ]
|
Final List of Participants - Working Party 4A (Geneva, 30 May-5 June 2012)
|
Director, BR
|
|
2012-06-05 |
|
[ 59 ]
|
Liaison statement to relevant Working Parties of Study Group 5 on further studies on cognitive radio systems (CRS) (copy for information to relevant Working Parties of Study Groups 1, 4, 6 and 7)
|
WP 5A
|
|
2012-06-05 |
|
[ 58 ]
|
Liaison statement to Working Parties 5B, 5C and 5D (copy to Working Parties 1B, 4A, 4B, 4C, 6A, 7B, 7C, 7D for information) - Preparations for WRC-15 Agenda item 1.3 in response to decisions of CPM15-1
|
WP 5A
|
|
2012-06-05 |
|
[ 57 ]
|
Liaison statement to WP 4A - WRC-15 Agenda item 1.5 and technical characteristics of FSS system radio links
|
WP 5B
|
|
2012-06-01 |
Results:681 total items. Result page:
Previous -
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10 -
11 -
12 -
13 -
14
- Next
|
Multiple Document Download: Formats and Languages to be included (when available):