International Telecommunication Union   ITU
Français  Espańol
 
Site map Contact Us Print version
  Home : ITU-R : WP4A : Contributions  Recently posted -  Search Meeting Documents
   
ITU-R WP4A  C 

ITU-R WP4A

Efficient Orbit/Spectrum Utilization for FSS and BSS

Results:607 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16 - 17 - 18 - 19 - 20 - 21 - 22 - 23 - 24 - 25  - Next Next
Contributions  Documents / Contributions
 
Number 
Received Source Title Questions
[ 157 ]  
+Corr.1 
2013-03-06 World Meteorological Organization   Liaison statement to Working Parties 1B, 4A, 4C, 5A, 5B, 7B, 7C, JTG 4-5-6-7 and the Special Committee as responsible Groups for WRC-15 Agenda items 1.1, 1.3, 1.5, 1.6, 1.9, 1.10, 1.11, 1.12, 1.17, 1.18, 7, 9.1.1, 9.1.2, 9.1.5, 9.1.6, 9.1.8, 10 (copy to Working Party 5D)     N/A  
[ 156 ]  
 
2013-02-28 International Maritime Organization   Liaison statement to ITU-R Working Party 4A and CIRM - WRC-15 Agenda item 1.8 - Broadband satellite earth stations aboard vessels (ESV)     N/A  
[ 155 ]  
 
2013-02-18 WP 5D   Liaison statement to JTG 4-5-6-7 (copy to Working Party 4A, Working Party 4B, Working Party 4C, Working Party 5A, Working Party 5B, Working Party 5C, Working Party 6A, Working Party 7B, Working Party 7C, Working Party 7D, Working Party 1A, Working Party 3K, Working Party 3M)     N/A  
[ 154 ]  
 
2013-02-18 WP 5D   Liaison statement to Joint Task Group 4-5-6-7 (copy to WPs 4A, 4B, 4C, 5A, 5B, 5C, 6A, 7B, 7C, 7D, (WPs 1A, 3K, 3M)) - Suitable frequency ranges above 6 GHz     N/A  
[ 153 ]  
 
2013-02-07 WP 5D   Liaison statement to ITU-R Working Party 4A - Compatibility study between FSS networks and IMT systems in the band 3 400-3 600 MHz for small cell deployments     N/A  
[ 152 ]  
 
2012-12-06 JTG 4-5-6-7   Liaison statement to Study Groups 4, 5, 6 and 7 and Working Parties 4A, 4B, 4C, 5A, 5B, 5C, 5D, 6A, 7B, 7C and 7D as concerned Groups for WRC-15 Agenda item 1.1 - Preparations for WRC-15 Agenda item 1.1 - Technical and operational characteristics     N/A  
[ 151 ]  
 
2012-11-28 SG 5   Liaison statement to Radiocommunication Study Group 4 - Result of the Study Group 5 meeting (19-20 November 2012) on a SF-series Recommendation     N/A  
[ 150 ]  
 
2012-11-20 WP 5A   Liaison statement to Working Parties 4A, 7B, 7C and 7D (copy to Working Parties 5B, 5C and 5D) - WRC-15 Agenda item 1.6 - Characteristics of and protection criteria for mobile systems operating in the frequency range 14.5-15.35 GHz     N/A  
[ 149 ]  
 
2012-11-20 WP 5A   Liaison statement to ITU-R Working Party 4A (copy to Working Parties 3M and 7B for information) - WRC-15 Agenda item 1.9 issue 1.9.1     N/A  
[ 148 ]  
 
2012-11-19 WP 5B   Liaison statement to Working Party 4A - Technical characteristics and protection criteria for the FSS in support of studies under WRC-15 Agenda item 1.17     N/A  
[ 147 ]  
 
2012-11-19 WP 5B   Liaison statement to working Party 4A, 5C and 5D - WRC-15 Agenda item 1.6 - Technical characteristics of and protection criteria for aeronautical mobile systems operating in the frequency range 14.5-15.38     N/A  
[ 146 ]  
(Rev.1) 
2012-11-19 WP 5B   Liaison statement to ITU-R Working Parties 4A, 4B and 4C - WRC-15 Agenda item 1.5     N/A  
[ 145 ]  
 
2012-11-19 WP 5B   Liaison statement to ITU-R Working Party 4A - WRC-15 Agenda item 1.7 - Consideration of Resolution 114 (Rev.WRC-12) - Studies on compatibility between new systems of the aeronautical radionavigation service and the fixed-satellite service (Earth-to-space) (limited to feeder links of the non-geostationary mobile-satellite systems in the mobile-satellite service) in the frequency ..     N/A  
[ 144 ]  
 
2012-11-16 WP 5B   Liaison statement to Joint Task Group 4-5-6-7 and Study Group 4, 5, 6, and 7 - WRC-15 Agenda item 1.1 - Modelling considerations and other considerations for 5-6 GHz frequency range     N/A  
[ 143 ]  
 
2012-11-16 WP 5A   Liaison statement to Joint Task Group 4-5-6-7 (copy to Working Parties (4A, 4B, 4C, 5B, 5C 5D, 6A, 7B, 7C, 7D 1A, 3K 3M) for information) - WRC-15 Agenda item 1.1 - Working Party 5A initial information on spectrum requirements studies for WRC-15 Agenda item 1.1     N/A  
[ 142 ]  
 
2012-11-16 WP 5A   Liaison statement to Joint Task Group 4-5-6-7 (copy to Working Parties (4A, 4B, 4C 5B, 5C, 5D, 6A, 7B, 7C, 7D, 1A, 3K, 3M) for information) - WRC-15 Agenda item 1.1 - Sharing considerations for the 5-6 GHz frequency range for WRC-15 Agenda item 1.1     N/A  
[ 141 ]  
 
2012-11-14 WP 5C   Liaison statement to Working Party 4A - Review of SF-series Recommendations     N/A  
[ 140 ]  
 
2012-11-14 WP 5C   Liaison statement to Working Party 4A and Working Party 4C - In relation to the I/N issue (AI 1.9.1, 1.9.2 and 1.10)     N/A  
[ 139 ]  
 
2012-11-14 WP 5C   Liaison statement to Working Party 4A (copy to Working Parties 5A and 5B for information) WRC-15 Agenda item 1.6     N/A  
[ 138 ]  
 
2012-11-14 WP 5C   Liaison statement to Working Party 4A (copy to Working Parties 4C, 5A, 5B, 7A, 7B, 7C and 7D for information) - WRC-15 Agenda item 1.8 - Possible review of the provisions relating to earth stations on board vessels in the 5 925-6 425 MHz and 14-14.5 GHz bands     N/A  
[ 137 ]  
 
2012-11-14 WP 5C   Liaison statement to Working Parties 1A and 1B (for information to WPs 4A, 4B, 4C, 5A, 5B, 5D, 6A, 6B, 6C, 7B, 7C, 7D on further studies on cognitive radio systems (CRS))     N/A  
[ 136 ]  
(Rev.1) 
2012-11-09 WP 5B   Liaison statement to Joint Task Group 4-5-6-7 (copy for information to the relevant Working Parties of Study Groups 1, 3, 4, 5, 6 and 7) - WRC-15 Agenda item 1.1 operating characteristics of AMT systems     N/A  
[ 135 ]  
 
2012-11-09 WP 5B   Liaison statement to Joint Task Group 4-5-6-7 WRC-15 Agenda item 1.1 (copy to Working Parties 1A, 3K, 3M, 4A, 4B, 4C, 5A, 5C, 5D and 7C for information)     N/A  
[ 134 ]  
+Add.1 
2012-10-01 Bulgaria (Republic of)   Preliminary draft new Recommendation ITU-R BO.[IMPR_BSS_REF_ANT_DIAG] - Improved BSS receiving earth stations reference antenna radiation pattern for RR Appendix 30 Regions 1 and 3 systems     N/A  
[ 133 ]  
 
2012-10-18 International Maritime Organization   Report of the eighth meeting of the Joint IMO/ITU Experts Group on maritime radiocommunication matters     N/A  
Results:607 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16 - 17 - 18 - 19 - 20 - 21 - 22 - 23 - 24 - 25  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  ITU-R Web coordinator
Updated : 2015-02-11