Contributions |
|
Number
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 556 ]
|
Revision to CPM text for agenda item 1.6
|
Canada
|
|
2014-06-24 |
|
[ 555 ]
|
Proposed modifications to the working document - Draft CPM text on WRC-15 agenda item 7 - Possible cancellation of advance publication mechanism for satellite networks subject to coordination under Section II of Article 9 of the Radio Regulations (Issue C)
|
Canada
|
|
2014-06-24 |
|
[ 554 ]
|
Proposed modifications to the working document - Draft CPM text on WRC-15 agenda item 7 - Informing the BR of a suspension under No 11.49 beyond six months (Issue A)
|
Canada
|
|
2014-06-24 |
|
[ 553 ]
|
Working document - Draft CPM text on WRC-15 agenda item 9.1, issue 9.1.2
|
Canada
|
|
2014-06-24 |
|
[ 552 ]
|
Working document - Draft CPM text on WRC-15 agenda item 9.1.2
|
European Space Agency
|
|
2014-06-24 |
|
[ 551 ]
|
Working document - Draft CPM text on WRC-15 agenda item 9.1.2 (relating to the use of the 30/20 GHz band frequency band.)
|
European Space Agency
|
|
2014-06-24 |
|
[ 550 ]
|
Working document - Draft CPM text on WRC-15 agenda item 7
|
European Space Agency
|
|
2014-06-24 |
|
[ 549 ]
|
Proposal for modification of the draft CPM text for WRC-15 agenda item 1.6
|
Finland
|
|
2014-06-24 |
|
[ 548 ]
|
Measurements of new design BSS receiving antenna and conclusions on PDR of ITU-R S.1717 and DNR BO.[ALT_BSS_ANT_DIAG]
|
Bulgaria (Republic of)
|
|
2014-06-24 |
|
[ 547 ]
|
Sharing criteria between FSS (Earth to space) and RR Appendix 30A plan and list assignments in the 14.5-14.8 GHz band in Regions 1&3
|
Israel (State of)
|
|
2014-06-23 |
|
[ 546 ]
|
Proposed revision to draft CPM text on WRC-15 agenda item 1.8 ( Working Party 4A, Working Party 4C, Working Party 5A, Working Party 5B, Working Party 5C, (Working Party 7A), (Working Party 7B), (Working Party 7C), (Working Party 7D))
|
France
|
|
2014-06-24 |
|
[ 545 ]
|
Proposed modifications to the draft CPM text on WRC-15 agenda item 7 issue C - Possible cancellation of advance publication mechanism for satellite networks subject to coordination under Section II of Article 9 of the Radio Regulations
|
Australia
|
|
2014-06-24 |
|
[ 544 ]
|
Working document towards a preliminary draft new Recommendation ITU-R S.[GSO FSS E/S 29.5-30.0/19.7-20.2 GHz] - Proposal for refinements to the working document towards a PDNR Technical and operational guidelines for earth stations on [mobile/moving] platforms communicating with geostationary space stations in the fixed-satellite service in the frequency bands 19.7-20.2 GHz and...
|
Australia
|
|
2014-06-24 |
|
[ 543 ]
|
Preliminary draft new Recommendation ITU-R S.[GSO FSS E/S IN 29.5-30.0 GHz] - Technical and operational requirements for earth stations on moving platforms operating with geostationary FSS satellite networks in the bands 29.5-30.0/19.7-20.2 GHz
|
United States of America
|
|
2014-06-23 |
|
[ 542 ]
|
Working document towards a preliminary draft revision of Report ITU-R S.2223 - Technical and operational studies towards developing elements to be included in Report ITU-R S.2223 regarding earth stations on mobile platforms in the 17.3-20.2 and 27.5-30.0 GHz bands of the geostationary-satellite orbit fixed-satellite service
|
United States of America
|
|
2014-06-23 |
|
[ 541 ]
|
Preliminary draft new Recommendation ITU-R SF.[INTERF.AREA] - Possible methodology for frequency sharing between ubiquitously deployed earth stations of the fixed-satellite service and stations of the terrestrial services in adjacent areas for sharing situations described in Appendix 7 of the Radio Regulations
|
United States of America
|
|
2014-06-23 |
|
[ 540 ]
|
Review of the Inter-regional sharing provisions contained in Annex 7 to Appendix 30
|
United States of America
|
|
2014-06-23 |
|
[ 539 ]
|
Review of the situation surrounding bringing into use and notification of frequency assignments
|
United States of America
|
|
2014-06-23 |
|
[ 538 ]
|
Proposal for modification of draft CPM text for WRC-15 agenda item 9.1.3
|
United States of America
|
|
2014-06-23 |
|
[ 537 ]
|
Working document towards a preliminary draft new Report ITU-R S.[FSS 7/8 GHZ COMPATIBILITY] - Compatibility studies between the fixed-satellite service and the terrestrial and other space services in the frequency bands 7 150-7 250 MHz (space-to-Earth) and 8 400-8 500 MHz (Earth-to-space)
|
United States of America
|
|
2014-06-23 |
|
[ 536 ]
|
Interference for FSS GSO satellites to SRS spacecraft in the 7 150-7 235 MHz band using a modified E.I.R.P. spectral density mask - WRC-15 agenda item 1.9.1
|
United States of America
|
|
2014-06-23 |
|
[ 535 ]
|
Proposed revision of working document - Draft CPM text on WRC-15 agenda item 1.9.1
|
United States of America
|
|
2014-06-23 |
|
[ 534 ]
|
Proposed modifications to the working document draft CPM text on WRC-15 agenda item 9.1, issue 9.1.2
|
United States of America
|
|
2014-06-23 |
|
[ 533 ]
|
Further considerations of issue [G] - Failure of a [newly launched] satellite during the ninety-day bringing into use period
|
United States of America
|
|
2014-06-23 |
|
[ 532 ]
|
Draft CPM text on WRC-15 agenda item 7, issue D - Possible methods to mitigate excessive filings
|
United States of America
|
|
2014-06-23 |
|
[ 531 ]
|
Revision of draft CPM text on WRC-15 agenda item 7 - Informing the BR of a suspension under RR No. 11.49 beyond six months (Issue A)
|
United States of America
|
|
2014-06-23 |
|
[ 530 ]
|
Draft CPM text on WRC-15 agenda item 1.8
|
United States of America
|
|
2014-06-23 |
|
[ 529 ]
|
Working document - Draft CPM text on WRC-15 agenda item 1.7
|
United States of America
|
|
2014-06-23 |
|
[ 528 ]
|
Proposed revisions to the working document towards a preliminary draft new Report ITU-R S.[R2R3.FSS] - Assessment on use of spectrum in the 10-17 GHz band for the GSO fixed-satellite service in Region 2, Region 3
|
United States of America
|
|
2014-06-23 |
|
[ 527 ]
|
Proposed revisions to the working document towards a preliminary draft new Report ITU-R S.[R1.FSS] - Assessment on use of spectrum in the 10-17 GHz band for the GSO fixed-satellite service in Region 1
|
United States of America
|
|
2014-06-23 |
|
[ 526 ]
|
EESS (active), aeronautical navigation and FSS (E-s) sharing study for the 13.25-13.75 GHz band
|
United States of America
|
|
2014-06-23 |
|
[ 525 ]
|
Revision of draft CPM text on WRC-15 agenda items 1.6.1 and 1.6.2: 13.25-13.75 GHz
|
United States of America
|
|
2014-06-23 |
|
[ 524 ]
|
FSS distribution model
|
United States of America
|
|
2014-06-23 |
|
[ 523 ]
|
Working document - Draft CPM text on WRC-15 agenda items 1.6.1 and 1.6.2
|
United States of America
|
|
2014-06-23 |
|
[ 522 ]
|
Working document towards a preliminary draft new Report ITU-R S.[R2R3.FSS] - Assessment on use of spectrum in the 13-17 GHz range for the GSO fixed-satellite service in Regions 2 and 3
|
United States of America
|
|
2014-06-23 |
|
[ 521 ]
|
Revision of preliminary draft new Report ITU-R S.[R2R3.FSS]
|
United States of America
|
|
2014-06-23 |
|
[ 520 ]
|
Revisions to Annex 10 to Working Party 4A Chairman's Report - Working document towards a preliminary draft new Report ITU-R S.[R2R3.FSS] - WRC-15 agenda item 1.6
|
United States of America
|
|
2014-06-23 |
|
[ 519 ]
|
Revision of draft CPM text on WRC-15 agenda items 1.6.1 and 1.6.2
|
United States of America
|
|
2014-06-23 |
|
[ 518 ]
|
Use of linear polarization for Article 4 networks in Region 2
|
Director, BR
|
|
2014-06-23 |
|
[ 517 ]
|
Proposed modifications to the draft CPM text on WRC-15 agenda item 9.1, issue 9.1.5
|
International Civil Aviation Organization
|
|
2014-06-23 |
|
[ 516 ]
|
Working document - Draft CPM text on WRC-15 agenda item 7 - Possible method to mitigate excessive satellite networks filings issue (Issue D)
|
Saudi Arabia (Kingdom of)
|
|
2014-06-23 |
|
[ 515 ]
|
Proposal to the revision of the Document - Annex 35 to Document 4A/468 - Working document - Draft CPM text on WRC-15 agenda item 9.1, issue 9.1.5
|
Russian Federation
|
|
2014-06-23 |
|
[ 514 ]
|
Proposal to the revision of the Document - Working document towards a preliminary draft new Report ITU-R S.[ESV] - (Annex 12 to Document 4A/468)
|
Russian Federation
|
|
2014-06-23 |
|
[ 513 ]
|
Proposal to the revision of the Document Annex 25 to Document 4A/468 - Working document towards a preliminary draft CPM text on WRC-15 agenda item 1.8
|
Russian Federation
|
|
2014-06-23 |
|
[ 512 ]
|
Proposals towards draft CPM Report for WRC-15 agenda item 1.6.1
|
Russian Federation
|
|
2014-06-23 |
|
[ 511 ]
|
Proposals toward draft CPM text on WRC-15 agenda item 9.1, issue 9.1.2
|
Russian Federation
|
|
2014-06-23 |
|
[ 510 ]
|
Assessment of sharing of fixed satellite service (space-Earth) with DRS systems in the space research service in the frequency band 13.4-13.75 GHz
|
Russian Federation
|
|
2014-06-23 |
|
[ 509 ]
|
Compatibility studies of the fixed satellite service (space-Earth) with standard frequency and time signal-satellite service (Earth-space) in the frequency band 13.4-13.75 GHz
|
Russian Federation
|
|
2014-06-23 |
|
[ 508 ]
|
Proposals toward working document towards a preliminary draft new Report ITU-R S.[R1.FSS] - Assessment on use of spectrum in the 10-17 GHz band for the GSO fixed-satellite service in Region 1
|
Russian Federation
|
|
2014-06-23 |
|
[ 507 ]
|
Draft new Recommendation ITU-R BO.[ALT_BSS_ANT_DIAG] - Alternative BSS earth station antenna radiation pattern for 12 GHz BSS bands with effective apertures in the range 55-75 cm
|
Hughes Network Systems, LLC
|
280/4
|
2014-06-23 |
Results:681 total items. Result page:
Previous -
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10 -
11 -
12 -
13 -
14
- Next
|
Multiple Document Download: Formats and Languages to be included (when available):