Contributions |
|
Number
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 99 ]
|
Working document towards a preliminary draft new Report - Capability evaluation on satellite network monitoring
|
China (People's Republic of)
|
|
2014-05-21 |
|
[ 98 ]
|
Report of the Correspondence Group on Technical Identification of Digital Signals
|
Chairman, CG Tech. Id. Digital Signals
|
|
2014-05-22 |
|
[ 97 ]
|
Working document towards a preliminary draft new Report ITU-R SM.[DVB-T_SERVICE_AREA] - Defining the service area of the DVB-T station for fixed reception
|
Russian Federation
|
|
2014-05-21 |
|
[ 96 ]
|
Proposals for revision of Recommendation ITU-R SM.1875-1 - DVB-T coverage measurements and verification of planning criteria
|
Russian Federation
|
|
2014-05-21 |
|
[ 95 ]
|
Proposal for the revision of Report ITU-R SM.2257-1 - Spectrum management and monitoring during major events
|
Russian Federation
|
|
2014-05-21 |
|
[ 94 ]
|
Working document towards a preliminary draft new Report ITU-R SM.[SPEC_MON_EVOLUTION] - Spectrum monitoring evolution
|
Chairman, CG on Spectrum Monitoring Evolution
|
235/1
|
2014-05-21 |
|
[ 93 ]
|
Review of preliminary draft new Recommendation ITU-R SM.[DF_ACCURACY] - Test procedure for measuring DF accuracy
|
MEDAV GmbH
|
|
2014-05-15 |
|
[ 92 ]
|
Preliminary draft new Recommendation ITU-R SM.[DOC.____] - Inserting highly precise time information in I/Q data of monitoring receivers
|
Rohde & Schwarz GmbH & Co. KG
|
|
2014-05-06 |
|
[ 91 ]
|
Draft revision of Recommendation ITU-R SM.1051-2 - Priority of identifying and eliminating harmful interference in the band 406-406.1 MHz
|
United States of America
|
|
2014-04-25 |
|
[ 90 ]
|
Proposal for a new Recommendation on storage of I/Q data
|
Germany (Federal Republic of)
|
|
2014-04-22 |
|
[ 89 ]
|
Proposed draft revision of Recommendation ITU-R SM.1268
|
Germany (Federal Republic of)
|
|
2014-04-14 |
|
[ 88 ]
|
Liaison statement to Working Party 1A - Copy to Working Parties 1C, 5A, 5B, 5C and ITU-T Study Group 5 - Recommendations ITU-T K.60 and K.mhn - Coexistence of wired and wireless communication systems
|
WP 6A
|
|
2014-04-10 |
|
[ 87 ]
|
Editorial modification of Report ITU-R SM.2056
|
Netherlands (Kingdom of the)
|
|
2014-03-04 |
|
[ 86 ]
|
Question ITU-R 255/7
|
SG 7
|
|
2014-02-27 |
|
[ 85 ]
|
Liaison statement on human exposure to EMF
|
ITU-T SG 5
|
|
2014-01-21 |
|
[ 84 ]
|
[Proposal for revision of Report ITU-R SM.2211 - Comparison of time-difference-of-arrival and angle-of-arrival methods of signal geolocation]
|
Russian Federation
|
|
2014-01-09 |
|
[ 83 ]
|
[Proposal for revision of Recommendation ITU-R SM.1880 - Spectrum occupancy measurement]
|
Russian Federation
|
|
2014-01-09 |
|
[ 82 ]
|
Liaison statement to Working Parties 1C, 5A and 5C - Station call-sign identification to be used by oceanographic radar in frequency band 3 to 50 MHz
|
WP 5B
|
|
2013-12-20 |
|
[ 81 ]
|
Liaison statement to ITU-R Working Party 1A and ITU-T Study Groups 5, 9 & 15 for action (copy to ITU-R Working Parties 1C, 3L, 4C, 5A, 5C, 5D, 6A, 7B, 7C and 7D por information) - Coexistence of wired telecommunications (including PLT) with radiocommunication systems - Considerations with respect to work on Recommendations ITU-T G.fast and ITU-T J.195 (J.HINOC-REQ)
|
WP 5B
|
|
2013-12-05 |
|
[ 80 ]
|
Liaison statement to Working Party 1C - Draft revision of Recommendation ITU-R SM.1051 - Priority of identifying and eliminating harmful interference in the band 406-406.1 MHz
|
WP 4C
|
|
2013-09-30 |
|
[ 79 ]
|
Further consideration of the draft revision of Recommendation ITU-R SM.1051-2 - Priority of identifying and eliminating harmful interference in the band 406-406.1 MHz
|
Chairman, SG 1
|
|
2013-06-18 |
|
[ 78 ]
|
Liaison statement to ITU-T Study Group 5 (copy to ITU-R Working Parties 1C, 3L, 4C, 5A, 5B, 5C, 5D, 6A, 7B, 7C and 7D) - Activities of ITU-T Study Group 5 related to interference between radio signal and device or cable connected to wired broadband networks and cable television networks
|
WP 1A
|
|
2013-06-14 |
|
[ 77 ]
|
Liaison statement to ITU-T Study Group 15 for information and action (copy to ITU-R Working Parties 1C, 3L, 4C, 5A, 5B, 5C, 5D, 6A, 7B, 7C and 7D) - Coexistence of wired telecommunications (including PLT) with radiocommunication systems - Considerations with respect to work on Recommendation ITU-T G.fast
|
WP 1A
|
|
2013-06-14 |
|
[ 76 ]
|
Liaison statement to Working Parties 1C, 3L, 4C, 5A, 5B, 5C, 5D, 6A, 7B, 7C and 7D - Coexistence of wired telecommunications (including PLT) with radiocommunication systems - Streamlining future cooperation within ITU-R and liaison with ITU-T
|
WP 1A
|
|
2013-06-14 |
|
[ 75 ]
|
Liaison statement to ITU-T Study Group 9 (Copy to ITU-R Working Parties 1C, 3L, 4C, 5A, 5B, 5C, 5D, 6A, 7B, 7C, 7D and ITU-T Study Group 5) - Coexistence of wired telecommunications (including PLT) with radiocommunication systems - considerations with respect to work on Recommendation ITU-T J.195 (J.HiNoC-req)
|
WP 1A
|
|
2013-06-14 |
|
[ 74 ]
+Ann.1-8 |
Report of the meeting of Working Party 1C (Geneva, 4 - 11 June 2013)
|
Chairman, WP 1C
|
|
2013-06-11 |
|
[ 73 ]
(Rev.1) |
Final list of participants - Working Party 1C (Geneva, 4-11 June 2013)
|
Director, BR
|
|
2013-06-11 |
|
[ 72 ]
|
List of documents issued (Documents 1C/36 - 1C/72)
|
BR Study Groups Department
|
|
2013-06-03 |
|
[ 71 ]
|
Joint liaison statement to ITU-R Working Party 1A and ITU-T Study Groups 5 & 9 (copy to ITU-R Working Parties 1C and 5D for information) - Coexistence of wired and wireless communications systems - Revision of Recommendation ITU-T K.60
|
WPs 5A, 5B and 5C
|
|
2013-05-31 |
|
[ 70 ]
|
Joint liaison statement to ITU-R Working Party 1A and ITU-T Study Group 15 (copy to ITU-R Working Parties 1C, 5D & 6A for information) - Coexistence of wired and wireless communications systems - Further developments on Recommendation ITU-T G.FAST
|
WPs 5A, 5B and 5C
|
|
2013-05-31 |
|
[ 69 ]
|
Results of the 20th RAG meeting (Geneva, 22 to 24 May 2013)
|
Chairman, SG 1
|
|
2013-05-30 |
|
[ 68 ]
|
Proposals for the preliminary draft new Recommendation ITU-R SM.[DF_ACCURACY]
|
MEDAV GmbH
|
|
2013-05-28 |
|
[ 67 ]
|
Preliminary draft revision of Report ITU-R SM.2257 - Spectrum management and monitoring during major events
|
Ukraine
|
|
2013-05-28 |
|
[ 66 ]
|
Transmitters identification in a DVB-T SFN - The Italian experience
|
Rai Way S.p.A.
|
|
2013-05-28 |
|
[ 65 ]
+Add.1-2 |
Report of the Correspondence Group on Technical identification of digital signals
|
Chairman, CG -Digital Signals
|
|
2013-05-28 |
|
[ 64 ]
|
Working document towards a preliminary draft new Report - Technical identification of digital signals
|
China (People's Republic of)
|
|
2013-05-28 |
|
[ 63 ]
|
Working materials towards a future output document on VHF/UHF spectrum monitoring station planning - A network cost-cutting measure in spectrum monitoring station planning
|
China (People's Republic of)
|
|
2013-05-28 |
|
[ 62 ]
|
Comments on working document towards a preliminary draft new Recommendation ITU-R SM.[DF_ACCURACY]
|
China (People's Republic of)
|
|
2013-05-28 |
|
[ 61 ]
|
Working document towards a preliminary draft new Report ITU-R SM.[SPEC_MON_EVOLUTION]
|
Korea (Republic of)
|
|
2013-05-28 |
|
[ 60 ]
|
Preliminary draft new Recommendation ITU-R SM.[SPECTRUM_MONITORING_EVOLUTION] - Spectrum monitoring evolution
|
Korea (Republic of)
|
|
2013-05-28 |
|
[ 59 ]
|
Preliminary draft new Recommendation ITU-R SM.[DF_ACCURACY] - Test procedure for measuring DF accuracy
|
Korea (Republic of)
|
|
2013-05-28 |
|
[ 58 ]
|
Preliminary draft revision of Recommendation ITU-R SM.1537 - Automation and integration of spectrum monitoring systems with automated spectrum management
|
United States of America
|
|
2013-05-24 |
|
[ 57 ]
|
Working document towards a preliminary draft new Report ITU-R SM.[RADIO_VISUALIZING] - The radio source visualizing technology for spectrum monitoring
|
Japan
|
|
2013-05-27 |
|
[ 56 ]
|
Draft revision of Recommendation ITU-R SM.1837
|
Rohde & Schwarz GmbH & Co. KG
|
|
2013-05-22 |
|
[ 55 ]
|
Working document towards a preliminary draft new Report ITU-R SM.[SPEC_MON_EVOLUTION] - Spectrum Monitoring Evolution
|
Chairman, CG on Spectrum Monitoring Evolution
|
|
2013-05-21 |
|
[ 54 ]
|
Preliminary draft new Recommendation ITU-R SM.[SPEC_MON_EVOLUTION] - Spectrum Monitoring Evolution
|
Chairman, CG on Spectrum Monitoring Evolution
|
|
2013-05-21 |
|
[ 53 ]
|
Preliminary draft new Recommendation ITU-R SM[DF_ACCURACY] - Test procedure for measuring DF accuracy
|
Chairman, CG on DF Accuracy
|
|
2013-05-17 |
|
[ 52 ]
|
Results of the 19th RAG meeting (Geneva, 25 to 27 June 2012)
|
Chairman, SG 1
|
|
2013-05-16 |
|
[ 51 ]
|
Preliminary draft revision of Recommendation ITU-R SM.1051 - Priority of identifying and eliminating harmful interference in the band 406-406.1 MHz
|
United States of America
|
|
2013-05-10 |
|
[ 50 ]
|
Liaison statement to ITU-T Study Group 5 and ITU-R Working Party 1A (copy to ITU-R Working Parties 1C, 5A, 5B, and 5C for information) - Coexistence of wired and wireless communications systems
|
WP 6A
|
|
2013-05-08 |
Results:174 total items. Result page:
Previous -
1 -
2 -
3 -
4
- Next
|
Multiple Document Download: Formats and Languages to be included (when available):