International Telecommunication Union   ITU
Français  Espańol
 
Site map Contact Us Print version
  Home : ITU-R : WP1A : Contributions  Recently posted -  Search Meeting Documents
   
ITU-R WP1A  C 

ITU-R WP1A

Spectrum Engineering Techniques

Results:248 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5  - Next Next
Contributions  Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 73 ]  
 
Recommendation ITU-R SM.329 - Editorial correction in English version     Israel (State of)     2013-04-25
[ 72 ]  
 
Liaison statement to ITU-R Working Party 1A - Wireless Power Transmission (WPT)     Asia-Pacific Telecommunity     2013-04-12
[ 71 ]  
 
Reply liaison statement to ITU-R Working Party 1A and Working Parties 5A, 5B and 5C on impact from wired telecommunication (including PLT) on radiocommunication systems     ITU-T SG 9     2013-02-19
[ 70 ]  
 
Liaison statement to Joint Task Group 4-5-6-7 (copy to Working Party 4A, Working Party 4B, Working Party 4C, Working Party 5A, Working Party 5B, Working Party 5C, Working Party 6A, Working Party 7B, Working Party 7C, Working Party 7D, Working Party 1A, Working Party 3K, Working Party 3M) - Further elaboration on suitable frequency ranges and their suitability     WP 5D     2013-02-18
[ 69 ]  
 
Liaison statement to Joint Task Group 4-5-6-7 (copy to WPs 4A, 4B, 4C, 5A, 5B, 5C, 6A, 7B, 7C, 7D, (WPs 1A, 3K, 3M)) - Suitable frequency ranges above 6 GHz     WP 5D     2013-02-18
[ 68 ]  
 
Liaison statement to JTG 4-5-6-7 on adjacent band compatibility between the IMT uplink and digital terrestrial television (DTT) broadcasting under WRC-15 Agenda item 1.2 (copy to Working Party 1A and Working Party 6A for information)     WP 5D     2013-02-18
[ 67 ]  
+Add.1 
Liaison statement - Study Group 5 activities related to interference between radio signal and device or cable connected to wired broadband networks and cable television networks     ITU-T SG 5     2013-02-15
[ 66 ]  
 
Reply liaison statement on draft revision of Recommendation ITU-R M.1076     ITU-T JCA-AHF     2013-02-13
[ 65 ]  
 
Studies on cognitive radio systems (white space devices) in Europe     Germany (Federal Republic of)     2013-02-04
[ 64 ]  
 
Liaison statement to Working Parties 5D and 6A (copy to Working Party 1A for information) - Adjacent band compatibility between the mobile broadband uplink and digital terrestrial television broadcasting under WRC-15 Agenda item 1.2     JTG 4-5-6-7     2012-11-30
[ 63 ]  
 
Liaison statement to Joint Task Group 4-5-6-7 (copy to Working Parties (4A, 4B, 4C, 5B, 5C 5D, 6A, 7B, 7C, 7D 1A, 3K 3M) for information) - WRC-15 Agenda item 1.1 - Working Party 5A initial information on spectrum requirements studies for WRC-15 Agenda item 1.1     WP 5A     2012-11-16
[ 62 ]  
 
Liaison statement to Joint Task Group 4-5-6-7 (copy to Workin Parties (4A, 4B, 4C 5B, 5C, 5D, 6A, 7B, 7C, 7D, 1A, 3K, 3M) for information) - WRC-15 Agenda item 1.1 - Sharing considerations for the 5-6 GHz frequency range for WRC-15 Agenda item 1.1     WP 5A     2012-11-16
[ 61 ]  
(Rev.1) 
Liaison statement to ITU-R Working Parties 1A, 4C, 5D, 6A, 7C and 7D (copy to ITU-R Working Party 3L and to ITU-T Study Groups 5, 9 and 15 for information and/or action if any)     WPs 5A, 5B and 5C     2012-11-16
[ 60 ]  
 
Liaison statement to Working Parties 1A, 1B, 5B, 5C and 6A (copy to ITU-T FG-AVA, ITU-T Study Group 2, ITU-D Study Group 2, ITU-D Study Group 1, ETSI ERM TG 17, JCA-AHF) - Draft revision of Recommendation ITU-R M.1076 - Wireless communication systems for persons with impaired hearing     WP 5A     2012-11-15
[ 59 ]  
 
Liaison statement to Working Party 5A, 1A, 1B, 5C and 6A, ITU-T FG-AVA, ITU-T Study Group 2, ITU-D Study Group 2, ITU-D Study Group 1, ETSI ERM TG 17, JCA-AHF - Draft revision of Recommendation ITU-R M.1076 - Wireless communication systems for persons with impaired hearing     WP 5B     2012-11-14
[ 58 ]  
 
Liaison statement to Working Parties 1A and 1B (for information to WPs 4A, 4B, 4C, 5A, 5B, 5D, 6A, 6B, 6C, 7B, 7C, 7D on further studies on cognitive radio systems (CRS))     WP 5C     2012-11-14
[ 57 ]  
(Rev.1) 
Liaison statement to Joint Task Group 4-5-6-7 (copy for information to the relevant Working Parties of Study Groups 1, 3, 4, 5, 6 and 7) - WRC-15 Agenda item 1.1 operating characteristics of AMT systems     WP 5B     2012-11-09
[ 56 ]  
 
Liaison statement to Joint Task Group 4-5-6-7 WRC-15 Agenda item 1.1 (copy to Working Parties 1A, 3K, 3M, 4A, 4B, 4C, 5A, 5C, 5D and 7C for information)     WP 5B     2012-11-09
[ 55 ]  
 
Liaison statement to Working Party 5A (copy to Working Parties 1A and 1B for information) - Further studies on cognitive radio systems     WP 5B     2012-11-09
[ 54 ]  
 
Liaison statement - Request for inclusion of Recommendation ITU-R BT.1206 in Annex 4 to Recommendation ITU-R SM.1541     WP 6A     2012-11-02
[ 53 ]  
 
Liaison statement - Comment on Recommendation ITU-R SM.2028 - Protection distance calculation between inductive systems and radiocommunication services using frequencies below 30 MHz     WP 6A     2012-11-02
[ 52 ]  
 
Liaison statement - Activities related to smart grid     JCA-SG&HN     2012-10-30
[ 51 ]  
 
Liaison statement to Joint Task Group 4-5-6-7 - Initial information on spectrum requirements studies for WRC-15 Agenda item 1.1     WP 5D     2012-10-16
[ 50 ]  
 
Liaison statement to Joint Task Group 4-5-6-7 on suitable frequency ranges under WRC-15 Agenda item 1.1     WP 5D     2012-10-16
[ 49 ]  
 
Liaison statement to Study Group 1 (copy to Working Party 1A) - Active services operating above 275 GHz     WP 7D     2012-10-10
[ 48 ]  
 
This document has been withdrawn     BR Study Groups Department     2012-11-15
[ 47 ]  
 
Liaison statement to Working Party 1A - Active services operating above 275 GHz     WP 3M     2012-07-02
[ 46 ]  
 
Liaison statement to Working Party 1A (copy to Working Party 1C) - Question ITU-R 230-2/3 brought to the attention of Study Group 1     WP 3L     2012-07-02
[ 45 ]  
 
Liaison statement to Working Party 6A (copy to Working Party 1A for information) - Definition of location probability - Guidelines for assessment of interference into the broadcasting service from other services/applications     WP 3K     2012-06-29
[ 44 ]  
(Rev.1) 
Liaison statement to Working Parties 1A, 4A, 4C, 5A, 5B, 5C, 5D, 6A, 7B, 7C, 7D and Joint Task Group 4-5-6-7 - Handbook on ITU-R propagation prediction methods for interference and sharing studies     WP 3M     2012-06-29
[ 43 ]  
 
Study Group 5 Recommendation ITU-R M.1581-4 to be brought to the attention of Study group 1     SG 5     2012-06-27
[ 42 ]  
 
Study Group 5 Recommendation ITU-R M.1580-4 to be brought to the attention of Study Group 1     SG 5     2012-06-27
[ 41 ]  
 
Liaison statement to Joint Task Group 4-5-6-7 - WRC-15 Agenda item 1.1 (Copy to Working Parties 1A, 3K, 3M, 4A, 4B, 4C, 5A, 5C, 5D and 7C for information)     WP 5B     2012-06-22
[ 40 ]  
 
Liaison statement to Study Groups 3, 4, 5, 7 and relevant Working Parties - Active services operating above 275 GHz     SG 1     2012-06-15
[ 39 ]  
+Ann.1-11 
Report of the meeting of Working Party 1A (Geneva, 6 - 13 June 2012)     Chairman, WP 1A     2012-06-13
[ 38 ]  
 
Final List of Participants - Working Party 1A (Geneva, 6-13 June 2012)     Director, BR     2012-06-13
[ 37 ]  
 
Note to the Chairmen of Working Parties 1A and 1B - Liaison statement to relevant Working Parties of Study Group 5 on further studies on cognitive radio systems (CRS)     Vice-Chairman, WP 1C     2012-06-08
[ 36 ]  
 
Note to the Chairmen of Working Parties 1B and 1A - Working Party 1C Document brought to the attention of Working Parties 1A and 1B     Vice-Chairman, WP 1C     2012-06-08
[ 35 ]  
 
List of documents issued     BR Study Groups Department     2012-06-05
[ 34 ]  
 
Liaison statement to Working Party 4C (copied for information to Working Parties 1A and 5C) - WRC-15 Agenda item 1.10     WP 5A     2012-06-05
[ 33 ]  
 
Liaison statement to ITU-T Study Group 15 regarding G.wnb, narrow-band wireless home networking (copy to ITU-R Study Group 1, Working Party 5D)     WP 5A     2012-06-05
[ 32 ]  
 
Liaison statement to relevant Working Parties of Study Group 5 on further studies on cognitive radio systems (CRS) (copy for information to relevant Working Parties of Study Groups 1, 4, 6 and 7)     WP 5A     2012-06-05
[ 31 ]  
 
Liaison statement to Joint Task Group 4-5-6-7 - WRC-15 Agenda item 1.1 (copy to Working Party 1A, Working Party 3K, Working Party 3M, Working Party 4A, Working Party 4B, Working Party 4C, Working Party 5A, Working Party 5C, Working Party 5D and Working Party 7C for information)     WP 5B     2012-06-01
[ 30 ]  
 
Resolution ITU-R 58 - Studies on cognitive radio systems     Canada     2012-05-30
[ 29 ]  
 
Draft revision of ITU Handbook on 'Computer-Aided Techniques for Spectrum Management (CAT)' - Chapter 1 Introduction     United Arab Emirates     2012-05-30
[ 28 ]  
 
Report of the activities of the Correspondence Group     Rapp. RG WP 1A rev. ITU H'book on "Computer..."     2012-05-30
[ 27 ]  
 
Recent developments on Smart Grid and PLT involving spectrum management     British Broadcasting Corporation(BBC)     2012-05-30
[ 26 ]  
 
Preliminary draft revision of Question ITU-R 210-2/1     China (People's Republic of)     2012-05-30
[ 25 ]  
 
Proposal of a draft new Question SM.[THZ] - Technical and operational characteristics of the active services operating in the range 275-1 000 GHz     Japan   264/4, 238-1/3, 235-1/7   2012-05-30
[ 24 ]  
 
Spectral emissions measurements for maritime solid state radar     Japan     2012-05-30
Results:248 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  ITU-R Web coordinator
Updated : 2020-12-16