International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-R : SG07 : Contributions  Recently posted -  Search Meeting Documents
   
ITU-R SG07  C 

ITU-R SG07

Science Services

Results:132 total items.
Result page:  Previous -  1 - 2 - 3  - Next Next
Contributions  Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 82 ]  
 
Executive Report on the May 2014 meeting of Working Party 7D (6 - 13 May 2014)     WP 7D     2014-09-22
[ 81 ]  
 
Executive Report on the May 2014 meeting of Working Party 7B     WP 7B     2014-09-19
[ 80 ]  
 
Approval of draft new Reports referred to ITU-R Study Group 7 by Joint Task Group 4-5-6-7     United States of America     2014-09-17
[ 79 ]  
(Rev.1) 
Report on the status of Study Group 7 ITU-R Recommendations     Vice-Chairman, SG 7     2014-09-16
[ 78 ]  
 
Executive Report to Study Groups 4 and 7 on the work of Joint Task Group 4-5-6-7     Chairman, JTG 4-5-6-7     2014-09-10
[ 77 ]  
(Rev.1) 
Draft new Report ITU-R SA.[EESS-IMT 2 025-2 290 MHZ] - Sharing between space-to-space links in space research, space operation and Earth exploration-satellite services and IMT systems in the frequency bands 2 025-2 110 MHz and 2 200-2 290 MHz     JTG 4-5-6-7     2014-08-19
[ 76 ]  
(Rev.1) 
Draft new Report ITU-R SA.[METSAT-IMT 1.7 GHz] - Sharing assessment between meteorological-satellite systems and IMT stations in the 1 695-1 710 MHz frequency band     JTG 4-5-6-7     2014-08-14
[ 75 ]  
(Rev.1) 
Draft new Report ITU-R RA.[RAS-IMT] - Compatibility and sharing studies between the radio astronomy service and IMT systems in the frequency bands 608-614 MHz, 1 330-1 400 MHz, 1 400-1 427 MHz, 1 610.6-1 613.8 MHz, 1 660-1 670 MHz, 2 690-2 700 MHz, 4 800-4 990 MHz and 4 990-5 000 MHz     JTG 4-5-6-7     2014-08-13
[ 74 ]  
(Rev.1) 
Draft new Report ITU-R RS.[EESS-IMT 1.4 GHz] - Consideration of the frequency bands 1 375-1 400 MHz and 1 427-1 452 MHz for the mobile service - Compatibility with systems of the Earth exploration-satellite service (EESS) within the 1 400-1 427 MHz frequency band     JTG 4-5-6-7     2014-08-13
[ 73 ]  
 
Revision of Recommendation ITU-R TF.374-5 - Precise frequency and time-signal transmissions     WP 7A     2014-05-20
[ 72 ]  
(Rev.1) 
Report ITU-R RS.[EESS-9GHz_OOBE] - RF compatibility of unwanted emissions from 9 GHz EESS synthetic aperture radars (SAR) with the EESS (passive), SRS (passive), SRS and RAS operating in the frequency bands 8 400-8 500 MHz and 10.6-10.7 GHz, respectively     SG 7     2014-05-19
[ 71 ]  
(Rev.1) 
Report ITU-R SA.[SRS SHARING 37 GHz]- Protection of SRS and FSS systems sharing the 37.5-38 GHz band     SG 7   211/7   2014-05-19
[ 70 ]  
 
FG Bridging the Gap from Innovation to Standards (FG Innovation) - Liaison statement on New Standardization Activities for ITU-T Study Groups and ICT Innovation Panel [to all ITU-T Study Groups, ITU-D Study Groups and ITU-R Study Groups]     ITU-T FG Innovation     2014-02-27
[ 69 ]  
 
Liaison statement to Working Party 7D (copy to Study Group 7) - Possible modification of RR footnote No. 5.511F     WP 5B     2013-12-02
[ 68 ]  
 
Liaison statement - Agreed Working Definition of the Term "ICT" - Correspondence Group on the Elaboration of a Working Definition of the Term "ICT"     Chairman, ITU-D SG 1     2013-11-06
[ 67 ]  
 
Summary Report of actions taken during the meeting of Radiocommunication Study Group 7 (Geneva, 10 and 18 September 2013)     Chairman, SG 7     2013-09-19
[ 66 ]  
 
Final list of participants - Study Group 7 (Geneva, 10 & 18 September 2013)     Director, BR     2013-09-18
[ 65 ]  
 
List of documents issued (Documents 7/28(Rev.1), 30(Rev.1), 31(Rev.1), 32(Rev.1), 41(Rev.1) and 7/48-65)     BR Study Groups Department     2013-09-17
[ 64 ]  
(Rev.1) 
Draft revision to Recommendation ITU-R TF.686-2 - Glossary and definitions of time and frequency terms     WP 7A     2013-09-17
[ 63 ]  
 
Draft revision of Question ITU-R 236/7 - The future of the UTC time scale     WP 7A   236/7   2013-09-17
[ 62 ]  
(Rev.1) 
Draft new Report ITU-R SA.[SRS/MSS SHAR] - Sharing studies between mobile-satellite service (MSS) and space research service (SRS) in the 22-26 GHz range     WP 7B     2013-09-17
[ 61 ]  
(Rev.1) 
Draft revision of Report ITU-R RA.2126 - Techniques for mitigation of radio frequency interference in radio astronomy     WP 7D   237/7   2013-09-17
[ 60 ]  
 
Proposed update to the Handbook on Radio Astronomy     WP 7D     2013-09-17
[ 59 ]  
(Rev.1) 
Draft revision of Recommendation ITU-R SA.1626 - Feasibility of sharing between the space research service (space-to-Earth) and the fixed and mobile service in the band 14.8-15.35 GHz     WP 7B     2013-09-17
[ 58 ]  
(Rev.1) 
Draft revision of Recommendation ITU-R SA.1276-3 - Orbital locations of data relay satellites to be protected from the emissions of fixed service systems operating in the band 25.25-27.5 GHz     WP 7B     2013-09-17
[ 57 ]  
(Rev.1) 
Draft revision of Recommendation ITU-R SA.1275-3 - Orbital locations of data relay satellites to be protected from the emissions of fixed service systems operating in the band 2 200-2 290 MHz     WP 7B     2013-09-17
[ 56 ]  
(Rev.1) 
Draft new Report ITU-R SA.[SRS/AIRCRAFT 2 GHz] - Protection of SRS earth stations from transmitting aircraft stations in the 2 200-2 290 MHz band     WP 7B     2013-09-17
[ 55 ]  
(Rev.1) 
Draft new Report ITU-R SA.[EESS-FS-7GHz] - Sharing between the EESS (Earth-to-space) and the fixed service in the 7-8 GHz range     WP 7B     2013-09-17
[ 54 ]  
 
Note from Study Group 7 Chairman to Chairman of CPM-15     WP 7C     2013-09-17
[ 53 ]  
(Rev.1) 
Draft new Recommendation ITU-R RS.[EESS-9GHz-CHAR] - Characteristics of synthetic aperture radars operating in the Earth exploration-satellite service (active) around 9 600 MHz     WP 7C     2013-09-17
[ 52 ]  
 
Draft new Question ITU-R XXX/47 - Detection and resolution of radio frequency interference to Earth exploration-satellite service (passive) sensors     WP 7C     2013-09-17
[ 51 ]  
(Rev.1) 
Draft new Report ITU-R RS.[EESS-9GHz_SPECTREQ] - Spectrum requirements for spaceborne synthetic aperture radar (SAR) applications planned in an extended allocation to the Earth exploration-satellite service (EESS) around 9600 MHz     WP 7C     2013-09-17
[ 50 ]  
(Rev.1) 
Draft new Report ITU-R RS.[EESS-SCAT-ARNS 1 215-1 300 MHz] - Potential interference from EESS (active) scatterometers into ARNS systems in the frequency band 1 215-1 300 MHz     WP 7C     2013-09-17
[ 49 ]  
(Rev.1) 
Draft new Recommendation ITU-R RS.[SPAC_RAD_SNDR] - Typical technical and operating characteristics for spaceborne radar sounder systems using the 40-50 MHz band     WP 7C     2013-09-17
[ 48 ]  
 
Preliminary draft revision of Recommendation ITU-R TF.374-5 - Precise Frequency and Time-Signal Transmissions     WP 7A     2013-09-16
[ 47 ]  
 
List of documents issued (Documents 7/20 - 7/47)     BR Study Group Department     2013-09-05
[ 46 ]  
 
Proposed revision of Report ITU-R RS.2068 - Current and future use of the band 13.25-13.75 GHz by spaceborne active sensors     China (People's Republic of)     2013-09-02
[ 45 ]  
 
Draft new Report ITU-R SA.[SPECTRUM REQ] - Spectrum requirements for future EESS missions operating under a protential new EESS uplink allocation in the 7/8 GHz range     Korea (Republic of)     2013-09-03
[ 44 ]  
 
Executive Report of Working Party 7A     Chairman, WP 7A     2013-09-03
[ 43 ]  
 
Executive Report on the April 2013 meeting of Working Party 7D (September 2013)     Chairman, WP 7D     2013-09-03
[ 42 ]  
 
Results of the 20th RAG meeting     Vice-Chairman, SG 7     2013-09-02
[ 41 ]  
(Rev.1) 
Review of the Questions assigned by the Radiocommunication Assembly (RA-12) to Study Group 7     Chairman, SG 7     2013-09-02
[ 40 ]  
 
Executive Report on the April 2013 meeting of Working Party 7C ( September 2013)     Chairman, WP 7C     2013-09-02
[ 39 ]  
 
Report on the status of Study Group 7 Handbooks (September 2013)     Vice-Chairman, SG 7     2013-08-29
[ 38 ]  
 
Report on the status of Study Group 7 ITU-R Recommendations (September 2013)     Vice-Chairman SG 7     2013-08-28
[ 37 ]  
 
Executive Report on the April 2013 meeting of Working Party 7B (September 2013)     Chairman, WP 7B     2013-08-28
[ 36 ]  
 
Liaison Statement on WTSA-12 Action Plan     TSAG     2013-08-13
[ 35 ]  
(Rev.1) 
Proposed modifications to the Handbook on space research communication     WP 7B     2013-06-21
[ 34 ]  
 
Liaison statement to ITU-R Study Group 6 (copy to ITU-R Study Groups 1, 3, 4, 5, 7 and ITU-T Study Group 11) - Broadcasting terms and definitions     CCV     2013-06-11
[ 33 ]  
(Rev.1) 
Draft revision of Report ITU-R RA.2099 - Radio observations of pulsars for precision timekeeping     WP 7D     2013-04-16
Results:132 total items.
Result page:  Previous -  1 - 2 - 3  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  ITU-R Web coordinator
Updated : 2015-08-27