International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-R : JTG4567-AR : Contributions  Recently posted -  Search Meeting Documents
   
ITU-R JTG4567-AR  C 

ITU-R JTG4567-AR

Joint Task Group 4-5-6-7

Results:611 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16 - 17 - 18 - 19 - 20 - 21 - 22 - 23 - 24 - 25  - Next Next
Contributions  Documents / Contributions
 
Number 
Received Source Title
[ 86 ]  
 
2013-07-09 Germany (Federal Republic of)   Information on the usage of the 690 to 790 MHz band by SAB/SAP - Results of measurements during a number of rcent major events in Germany    
[ 85 ]  
 
2013-07-09 Asia-Pacific Telecommunity   APT views on WRC-15 Agenda item 1.1    
[ 84 ]  
 
2013-07-05 ECOWAS Administrations , Cameroon (Republic of)   Work on Agenda item 1.2    
[ 83 ]  
 
2013-07-07 C.B.S., Inc.   WRC-15 Agenda item 1.1 - Elements of sharing and compatibility studies between the broadcasting service and the mobile service    
[ 82 ]  
 
2013-07-07 C.B.S., Inc.   WRC-15 Agenda item 1.1 - Technical and operational characteristics of terrestrial television broadcasting for sharing and compatibility studies under WRC-15 Agenda item 1.1    
[ 81 ]  
 
2013-07-03 ECOWAS Administrations , Cameroon (Republic of)   Comment on Working Party 5D liaison statement to Joint Task Group 4-5-6-7 July meeting regarding suitable candidate bands under 1.1    
[ 80 ]  
 
2013-07-02 Japan   Technical Parameters of DTTB Systems C (ISDB-T) for sharing and compatibility studies between the broadcasting service and the mobile service under WRC-15 Agenda items 1.1 and 1.2    
[ 79 ]  
 
2013-07-02 Japan   Considerations on compatibility between services in the 1 400-1 427 MHz band and IMT systems in the 1 427.9-1 462.9 MHz and 1 475.9-1 510.9 MHz bands under WRC-15 Agenda item 1.1    
[ 78 ]  
 
2013-07-02 Japan   The result of sharing study between FSS and IMT-Advanced in the frequency band of 3400-3600 MHz considering geographical conditions    
[ 77 ]  
 
2013-07-02 Japan   Considerations on 3 400-4 200MHz and 4 400-4 900MHz bands under WRC-15 Agenda item 1.1    
[ 76 ]  
 
2013-03-06 World meteorological Organization   Liaison statement to Working Parties 1B, 4A, 4C, 5A, 5B, 7B, 7C, JTG 4-5-6-7 and the Special Commitee as responsible Groups for WRC-15 Agenda items 1.1, 1.3, 1.5, 1.6, 1.9, 1.10, 1.11, 1.12, 1.17, 1.18, 7, 9.1.1, 9.1.2, 9.1.5, 9.1.6, 9.1.8, 10 (copy to Working Party 5D)    
[ 75 ]  
 
2013-02-28 International Maritime Organisation   Liaison statement to ITU-R Working Parties 5A, 5B, 5D and Joint Task Group 4-5-6-7 - WRC-15, Agenda item 1.1 - IMO's concerns in relation to the wide range of frequency bands identified by ITU-R for future assessment of the suitability for IMT    
[ 74 ]  
 
2013-02-07 United Kingdom of Great Britain and Northern Ireland   UK strategy for UHF spectrum use:an update    
[ 73 ]  
 
2013-02-01 Free TV Australia Ltd.   WRC-15 Agenda items 1.1 and 1.2 - Technical and operational characteristics as well as protection criteria for the terrestrial component of IMT systems for studies under WRC-15 Agenda items 1.1 and 1.2    
[ 72 ]  
 
2012-11-14 South Africa (Republic of) , Zimbabwe (Republic of)   Suitable frequency ranges for IMT in the context of WRC-15 Agenda item 1.1    
[ 71 ]  
 
2012-11-14 United States of America   Meeting the demand for wireless broadband: Providing access to the 470-698 MHz frequency band    
[ 70 ]  
 
2012-11-14 United States of America   Proposed revisions to working document towards preliminary draft CPM text for WRC-15 Agenda item 1.1    
[ 69 ]  
 
2012-11-14 Norddeutscher Rundfunk (NDR) , Zweites Deutsches Fernsehen   Elements for sharing studies    
[ 68 ]  
 
2012-11-14 European Broadcasting Union (EBU)   Proposed modifications to Annex 6 to Joint Task Group 4-5-6-7 Chairman's Report - Elements for sharing and compatibility studies between the broadcasting and the mobile service under Agenda item 1.2    
[ 67 ]  
 
2012-11-14 European Broadcasting Union (EBU)   Error estimation in the 'Main-interferer' assumption    
[ 66 ]  
 
2012-11-14 TeliaSonera AB   Possible future implementations of IMT in the 1 400 MHz range and required studies    
[ 65 ]  
 
2012-11-14 TeliaSonera AB   Elements to be considered for sharing studies between MS and ARNS in relation Agenda item 1.2    
[ 64 ]  
 
2012-11-14 Iran (Islamic Republic of)   Working document towards draft CPM text for WRC-15 Agenda item 1.2    
[ 63 ]  
 
2012-11-14 Iran (Islamic Republic of)   Comments on the course of action undertook in first jtg meeting    
[ 62 ]  
 
2012-11-14 North American Broadcasters Association (NABA)   Support for CBS, Inc., contribution JTG 4-5-6-7/66 - Guidelines for the assessment of interferenced into the broadcasting service    
Results:611 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16 - 17 - 18 - 19 - 20 - 21 - 22 - 23 - 24 - 25  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

 

Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  ITU-R Web coordinator
Updated : 2014-07-17