International Telecommunication Union   ITU
Franįais  Espaņol
 
Site map Contact Us Print version
  Home : ITU-R : JTG4567 : Contributions  Recently posted -  Search Meeting Documents
   
ITU-R JTG4567  C 

ITU-R JTG4567

Joint Task Group 4-5-6-7

Results:130 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6  - Next Next
Contributions  Documents / Contributions
 
Number 
Received Source Title
[ 30 ]  
 
2012-07-15 Iran (Islamic Republic of)   Comments to the "Note to the Chairman of Joint Task Group 4-5-6-7 dated 3 July 2012" Chairmen, Study Groups 4, 5, 6 and 7 - Note from the Chairman of Joint Task Group 4-5-6-7    
[ 29 ]  
 
2012-07-13 North American Broadcasters Association (NABA)   Broadcasting spectrum usage in North America below 5 GHz and its needed protection from interference    
[ 28 ]  
 
2012-07-13 North American Broadcasters Association (NABA)   Analysis of adjacent band mobile wireless service interference    
[ 27 ]  
 
2012-07-13 World Broadcasting Unions - Technical Committee   Observations on increasing interference to satellite services and Recommendations to ensure signal integrity    
[ 26 ]  
 
2012-07-13 United Kingdom of Great Britain and Northern Ireland   UK strategy for UHF spectrum use    
[ 25 ]  
 
2012-07-13 Germany (Federal Republic of)   WRC-15 Agenda items 1.1, Resolution 233 (WRC-12) and Agenda item 1.2, Resolution 232 (WRC-12) - Proposal for a draft work plan and Joint Task Group structure for discussion    
[ 24 ]  
 
2012-07-12 Russian Federation   Work plans on WRC-15 Agenda items 1.1 and 1.2    
[ 23 ]  
 
2012-07-12 Russian Federation   Proposals on compatibility studies of the mobile service with the aeronautical radionavigation service in the frequency band 694-790 MHz    
[ 22 ]  
 
2012-07-12 Russian Federation   A system approach to bridge the digital divide    
[ 21 ]  
(Rev.1) 
2012-07-12 Chairman, JTG 4-5-6-7   Preliminary schedule of meetings of Joint Task Group 4-5-6-7    
[ 20 ]  
 
2012-07-11 C.B.S., Inc.   Guidelines for the assessment of compatibility with the broadcasting service from other services and applications    
[ 19 ]  
 
2012-07-11 C.B.S., Inc.   RF spectrum compatibility, sharing and interference studies conducted with respect to the broadcasting service    
[ 18 ]  
 
2012-07-10 Canada   Proposed draft CPM text for Agenda item 1.1    
[ 17 ]  
 
2012-07-09 Chairman of JTG 4-5-6-7   Terms of reference, allocation of work and draft CPM structure    
[ 16 ]  
 
2012-07-09 Korea (Republic of)   Proposed guidelines for working methods regarding WRC-15 Agenda item 1.1    
[ 15 ]  
 
2012-07-06 United States of America   Proposed draft detailed Work Plan for WRC-15 Agenda item 1.1    
[ 14 ]  
 
2012-07-03 Chairmen, SGs 4, 5, 6 and 7   Note to Chairman of Joint Task Group 4-5-6-7    
[ 13 ]  
(Rev.1) 
2012-06-29 WP 3M   Liaison statement to Working Parties 1A, 4A, 4C, 5A, 5B, 5C, 5D, 6A, 7B, 7C, 7D and Joint Task Group 4-5-6-7 - Handbook on ITU-R propagation prediction methods for interference and sharing studies    
[ 12 ]  
 
2012-06-28 WPs 3K and 3M   Liaison statement to ITU-R Joint Task Group 4-5-6-7 - World Radiocommunication Conference (WRC-15) Agenda items 1.1 and 1.2    
[ 11 ]  
 
2012-06-22 WP 5B   Liaison statement to Joint Task Group 4-5-6-7 - WRC-15 Agenda item 1.1 (Copy to Working Parties 1A, 3K, 3M, 4A, 4B, 4C, 5A, 5C, 5D and 7C for information)    
[ 10 ]  
 
2012-06-13 WP 4A   Liaison statement to Joint Task Group 4-5-6-7 - WRC-15 Agenda items 1.1 and 1.2    
[ 9 ]  
 
2012-06-05 WP 5A   Liaison statement ot JTG 4-5-6-7 - WRC-15 Agenda item 1.1    
[ 8 ]  
 
2012-06-04 WP 4B   Liaison statement on WRC-15 Agenda item 1.1    
[ 7 ]  
 
2012-06-01 WP 5B   Liaison statement to Joint Task Group 4-5-6-7 - WRC-15 Agenda item 1.1 (copy to Working Party 1A, Working Party 3K, Working Party 3M, Working Party 4A, Working Party 4B, Working Party 4C, Working Party 5A, Working Party 5C, Working Party 5D and Working Party 7C for information)    
[ 6 ]  
 
2012-05-30 WP 5C   Liaison statement to Working Party 5D and Joint Task Group 4-5-6-7 - Applicability of the sectoral antenna pattern approximations in Recommendation ITU-R F.1336-3 to the frequency range below 1 GHz    
Results:130 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

 

Top -  Feedback -  Contact Us -  Copyright Š ITU 2008 All Rights Reserved
Contact for this page :  ITU-R Web coordinator
Updated : 2013-05-20