International Telecommunication Union   ITU
Français  Espańol
 
Site map Contact Us Print version
  Home : ITU-R : WP6A : Contributions  Recently posted -  Search Meeting Documents
   
ITU-R WP6A  C 

ITU-R WP6A

Terrestial broadcasting delivery

Results:636 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13  - Next Next
Contributions  Documents / Contributions
 
Number 
Received Source Title AI/Question
[ 136 ]  
 
2009-02-27 Rapp. BSS between SG 6 and SG 4   Additional information on treatment of literature of former Working Party 6S      
[ 135 ]  
 
2009-02-24 WP 7D   Liaison statement to Working Parties 1A and 1C (copy to Working Party 6A for information) - Impact from PLT systems and measurement methods      
[ 134 ]  
 
2009-02-04 Asia-Pacific Broadcasting Union (ABU)   Manufacture of digital radio receivers for Asia-Pacific Region having full 18 KHz if bandwidth in the medium wave band      
[ 133 ]  
 
2008-12-04 ITU-T SG 5   Liaison reply on ITU-T Recommendation K.60      
[ 132 ]  
 
2008-12-03 WP 5B   Liaison statement to Working Parties 5A, 7D and 6A (copy to Working Parties 5C and 7B for information) on studies related to WRC-11 Agenda item 1.15      
[ 131 ]  
 
2008-12-01 Chairman, SG 6   Preliminary draft new Recommendation ITU-R BT.[SHARE] - Criterion to assess the impact of interference on the terrestrial broadcasting service (BS)     4-2/6  
[ 130 ]  
 
2008-11-21 WP 6B   Liaison statement to Working Party 5C (copy to Working Parties 4A, 4C, 5A, 6A, 6C, 7B and 7D for information) - Progress on the working document towards a preliminary draft new Recommendation ITU-R BT.[ENGUSER]      
[ 129 ]  
 
2008-11-17 WP 5B   Reply liaison statement to ITU-R Working Party 6A - Compatibility between digital sound broadcasting in the band of about 87-108 MHz and both the aeronautical radionavigation service in the band 108-117.975 MHz and the aeronautical mobile (route) service in the band 117.975-137 MHz      
[ 128 ]  
 
2008-11-17 WP 5B   Liaison statement to ITU-R Working Party 6A - Additional allocations to the maritime mobile service below 1 GHz (WRC-11 Agenda item 1.10)      
[ 127 ]  
 
2008-11-17 WP 5B   Liaison statement to Working Party 6A - WRC-11 Agenda item 1.4 (Resolution 413 (Rev.WRC-07)) use of the band 108-117.975 MHz by the aeronautical mobile (R) service      
[ 126 ]  
 
2008-11-17 WP 5B   Reply liaison statement to Working Party 5A, copies to Working Parties 5C, 6A on studies realted to WRC-11 Agenda item 1.23      
[ 125 ]  
 
2008-11-17 WP 5B   Liaison statement to Working Party 7B (copy to Working Parties 5A, 5C and 6A) - Compatibility studies between radiolocation and space research service      
[ 124 ]  
 
2008-11-17 WP 5B   Liaison statement to Working Party 6A (copies to Working Party 5A, Working Party 5C, Working Party 7B and Working Party 7D for information) - Consider possible allocations in the frequency range 3-50 MHz to the radiolocation service for oceanographic radar applications      
[ 123 ]  
 
2008-11-17 WP 5B   Liaison statement to ITU-R Working Parties 5A and 5C (copy to Working Parties 6A and 7B) - Initial considerations on compatibility between proposed new systems in the radiolocation service in bands 138-144 MHz and 154-156 MHz and other services operating in these bands      
[ 122 ]  
 
2008-11-17 WP 5B   Liaison statement to Working Party 6A (copy to Working Parties 5A and 5C) - On a primary allocation to the radiolocation service in the portion of the band 30-300 MHz      
[ 121 ]  
 
2008-11-12 WP 5C   Liaison statement to Working Parties 6A, 6B, 6C (copy to Working Parties 4A, 4C, 5A, 7B and 7D for information) - Harmonization of spectrum for use by terrestrial electronic news gathering systems      
[ 120 ]  
+Ann.1-15 
2008-11-04 Chairman, WP 6A   Report on the meeting of Working Party 6A (Geneva, 24-31 October 2008)      
[ 119 ]  
 
2008-10-31 WP 5C   Liaison statement to Working Party 5B (copy to WPs 5A, 6A, 7A and 7D for information) - Sharing studies required for WRC-11 Agenda item 1.15      
[ 118 ]  
(Rev.1) 
2008-10-31 WP 5A   Liaison statement to Working Parties 5B, 5C and 6A - Working document towards draft CPM text for WRC-11 Agenda item 1.23      
[ 117 ]  
 
2008-10-31 WP 5A   Liaison statement to Working Parties 5B, 5C and 6A - Work plan for studies related to WRC-11 agenda item 1.23      
[ 116 ]  
 
2008-10-31 WP 5C   Liaison statement to Working Party 1A (copy to Working Parties 5A, 5B and 6A for information) - Interference issues from power line telecommunication systems using the electricity supply wiring      
[ 115 ]  
 
2008-10-31 WP 5C   Liaison statement to Working Parties 6A and 5B (copy to WP 5A for information) - Consider possible allocations in the frequency range 3-50 MHz to the radiolocation service for oceanographic radar applications      
[ 114 ]  
 
2008-10-30 Director, BR   Final List of Participants - Working Party 6A (24-31 October 2008)      
[ 113 ]  
 
2008-10-29 WP 6B   Draft Liaison statement to WP 6A - Service requirements for digital terrestrial sound and multimedia broadcasting for mobile reception      
[ 112 ]  
 
2008-10-23 BR/SGD   List of documents issued (Documents 56 - 112)      
[ 111 ]  
 
2008-10-21 WP 5D   Liaison statement to Working Party 5B (copy to Working Parties 5A and 6A for information) - IMT parameters in the 790-862 MHz frequency band      
[ 110 ]  
 
2008-10-17 United Kingdom of Great Britain and Northern Ireland   Protection requirements for broadcasting systems operating in the LF, MF, HF and VHF bands below 80 MHz     32/6  
[ 109 ]  
 
2008-10-17 European Broadcasting Union (EBU)   Working document towards a preliminary draft new Report ITU-R BT.[DTTB PROTECT] - Protection requirements for terrestrial television broadcasting services against potential interference from mobile systems and networks     4-2/6, 31-1/6, 14/6, 114/6, 105/6  
[ 108 ]  
 
2008-10-17 European Broadcasting Union (EBU)   Summary of protection ratio measurements for DVB-T interfered by DVB-T and mobile systems such as UMTS      
[ 107 ]  
 
2008-10-17 European Broadcasting Union (EBU)   EBU views on WRC-11 Agenda item 1.15      
[ 106 ]  
 
2008-10-17 European Broadcasting Union (EBU)   Technical bases for DRM services coverage planning     64-1/6  
[ 105 ]  
 
2008-10-17 NDR , Zweites Deutsches Fernsehen (ZDF)   Studies related to Resolution 224 (WRC-07) and the band 470 - 862 MHz      
[ 104 ]  
 
2008-10-17 United States of America   Power line telecommunications      
[ 103 ]  
 
2008-10-17 United States of America   On transition from analogue to digital terrestrial broadcasting      
[ 102 ]  
 
2008-10-17 India (Republic of)   Results of measurement carried out on DRM in MW and SW bands     64-1/6, 60/6, 52-1/6, 108/6  
[ 101 ]  
 
2008-10-16 Finland   Preliminary draft revision of Recommendation ITU-R BT.1306-3 - Error correction, data framing, modulation and emission methods for digital terrestrial television broadcasting     31-1/6  
[ 100 ]  
 
2008-10-15 Brazil (Federative Republic of)   Suggested modifications to Report on transition from analogue to digital terrestrial broadcasting      
[ 99 ]  
 
2008-10-15 Brazil (Federative Republic of)   Mobile reception of digital terrestrial television service in the VHF/UHF band     4-2/6  
[ 98 ]  
 
2008-10-11 Japan   Proposed preliminary draft new Recommendation ITU-R BT.[PLT REC] - Protection requirements for broadcasting systems operating in the LF, MF, HF and VHF bands below 80 MHz against the impact of PLT systems      
[ 97 ]  
 
2008-10-14 Japan   Proposed modification of preliminary draft new Report ITU-R BT.[PLT REPORT]      
[ 96 ]  
 
2008-10-15 Japan   Working document towards a draft CPM Report studies on Agenda item 1.15 of WRC-11 - Protection of broadcasting service from HF oceanographic radar systems operating in 3 - 26 MHz band      
[ 95 ]  
 
2008-10-11 Japan   Proposed modifications to preliminary draft new Recommendation ITU-R BT.[WIREMIC]     121/6  
[ 94 ]  
 
2008-10-15 Japan   Working document towards a draft CPM Report studies on Agenda item 1.14 of WRC-11- Protection of ISDB-Tsb system and FM sound broadcasting operating in 76 -108 MHz band      
[ 93 ]  
 
2008-10-10 Ukraine   Proposed nonlinear distortion area determination method for radio reception in synchronous VHF-FM transmitters network     213/10  
[ 92 ]  
 
2008-10-10 Ukraine   Hybrid system FM/SSB/DRM for transition period from analog to digital broadcasting     56-1/6  
[ 91 ]  
 
2008-10-15 European Broadcasting Union (EBU) , British Broadcasting Corporation(BBC) , NHK , RAI-Radiotelevisione Italiana   Research and development of Ultra High Definition Television (UHDTV)     40/6, 37/6  
[ 90 ]  
 
2008-10-10 Chairman, Rapporteur Group on questions   Report on Questions      
[ 89 ]  
 
2008-10-10 Ukraine   Preliminary draft revision of Recommendation ITU-R BT.1306-3 - Error-correction, data framing, modulation and emission methods for digital terrestrial television broadcasting      
[ 88 ]  
 
2008-10-09 RAI-Radiotelevisione Italiana   Protection of broadcast spectrum     32/6  
[ 87 ]  
 
2008-10-07 Russian Federation   The impact of signal parameters variation on DVB-T reception quality     4-2/6, 31-1/6  
Results:636 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  ITU-R Web coordinator
Updated : 2012-04-20