International Telecommunication Union   ITU
Français  Espańol
 
Site map Contact Us Print version
  Home : ITU-R : WP5C : Contributions  Recently posted -  Search Meeting Documents
   
ITU-R WP5C  C 

ITU-R WP5C

Fixed wireless systems; HF systems in the Fixed and Land Mobile Services

Results:46 total items.
Contributions  [ Source: WP 4A ]   Documents / Contributions
 
Number 
Title Source Date
[ 552 ]  
 
Liaison statement to Working Party 5C - Statistical methodology for assessing the interference of the satellite services on a fixed service deployment     WP 4A   2011-10-06
[ 551 ]  
 
Liaison statement to Working Party 5C - Proposed re-examination of Recommendation ITU-R SF.1650-1     WP 4A   2011-10-06
[ 550 ]  
 
Liaison statement to Working Party 5C - Regarding the future disposition of Recommendation ITU-R SF.674-2 "Determination of the impact on the fixed service operating in the 11.7-12.2 GHz band when geostationary fixed-satellite service networks in Region 2 exceed the power flux-density thresholds in Resolution 77 (WRC-200)"     WP 4A   2011-10-06
[ 549 ]  
 
Liaison statement to Working Party 5C - Revision of Recommendation ITU-R F.1245-1     WP 4A   2011-10-06
[ 548 ]  
 
Liaison statement to Working Party 5C (and to Working Party 4C for information) - Revision of Recommendation ITU-R F.758 "Consideration in the development of criteria for sharing between the fixed service and other services" and ITU-R F.1495 "Interference criteria to protect the fixed service from time varying aggregate interference from other Radiocommunication services sharing..     WP 4A   2011-10-06
[ 546 ]  
 
Liaison statement to Working Party 5C - Power flux density (pfd) level for gateway links for High Altitude Platform Stations (HAPS) in the frequency band 5 850-7 075 MHz     WP 4A   2011-10-05
[ 541 ]  
 
Liaison statement to Study Group 1 (copy to Study Groups 5, 6, 7 and Working Party 1A) - A database for the protection of radio services     WP 4A   2011-09-29
[ 492 ]  
 
Liaison statement to Working Party 5C - Revision of Recommendation ITU-R F.1245-1     WP 4A   2011-05-25
[ 491 ]  
 
Liaison statement to Working Party 5C - Draft revision of Recommendation ITU-R SF.675-3 "Calculation of the maximum power density (averaged over 4 kHz) of an angle modulated carrier"     WP 4A   2011-05-25
[ 490 ]  
 
Liaison statement to Working Party 5C - Review of certain SF-Series Recommendations     WP 4A   2011-05-25
[ 489 ]  
 
Liaison statement to Working Party 5C (copy to Working Party 4C for information) - Consideration of draft revision of Recommendation ITU-R F.758-4     WP 4A   2011-05-25
[ 488 ]  
 
Liaison statement to Working Pary 5C - Power flux-density (pfd) level for gateway links for high altitude platform stations (HAPS) in the frequency band 5 850-7 075 MHz     WP 4A   2011-05-25
[ 487 ]  
 
Liaison statement to Working Party 5C - Statistical methodology for assessing the interference of the satellite services on a fixed service deployment     WP 4A   2011-05-25
[ 406 ]  
 
Liaison statement to Working Parties 3J, 3M (copy to Working Party 5C for information) - Propagation basis for the determination of long-term interference     WP 4A   2010-07-26
[ 405 ]  
 
Liaison statement to Working Party 5C - Statistical methodology for assessing the interference of the satellite services on an fixed service deployment     WP 4A   2010-07-26
[ 404 ]  
 
Liaison statement to Working Party 5C- Preliminary draft revision of Recommendation ITU-R SF.675-3 "Calculation of the maximum power density (averaged over 4 kHz) of an angle modulated carrier"     WP 4A   2010-07-26
[ 403 ]  
 
Liaison statement to Working Party 5C - Review of certain SF-series Recommendations     WP 4A   2010-07-26
[ 357 ]  
 
Liaison statement to Working Parties 5A, 5C, 7A, 7B, 7C and 7D regarding potential candidate bands for BSS feeder links under WRC-12 Agenda item 1.13     WP 4A   2010-04-30
[ 356 ]  
 
Liaison statement Working Party 7B (copy to Working Party 5C for information) - Parameters for compatibility studies between NGSO-ISS systems and SRS systems under WRC-12 Agenda item 1.11     WP 4A   2010-04-30
[ 355 ]  
 
Liaison statement to Working Party 5C with copy to Working Party 7B - Considerations on protection criteria for NGSO-ISS systems and SRS systems under WRC-12 Agenda item 1.11     WP 4A   2010-04-30
[ 352 ]  
 
Liaison statement to Working Party 5C - Review of certain SF-Series Recommendations     WP 4A   2010-04-30
[ 351 ]  
 
Liaison statement to Working Party 5C - Methodology for statistically calculating the interference received by the fixed service from space-to-Earth emissions for frequency bands above about 17 GHz     WP 4A   2010-04-30
[ 350 ]  
 
Liaison statement to Working Party 5C - Estimation of probability of causing harmful interference to FS terrestrial stations from geostationary BSS satellites in the frequency band 21.4-22.0 GHz     WP 4A   2010-04-30
[ 349 ]  
 
Liaison statement to Working Party 5C - Revision of Recommendation ITU-R SF.675-3 "Calculation of the maximum power density (averaged over 4 KHz) of an angle modulated carrier"     WP 4A   2010-04-30
[ 348 ]  
 
Liaison statement to Working Party 5C for action (copy to Working Party 4C for information) - Harmonization of spectrum for use by terrestrial electronic news gathering systems     WP 4A   2010-04-30
[ 347 ]  
 
Liaison statement to Working Party 5C - Gateway links for high altitude platform stations (HAPS) in the frequency band 5 850-7 075 MHz     WP 4A   2010-04-30
[ 326 ]  
 
Liaison statement to Working Parties 3J and 3M for action (copy to WP 5C for information) - Comparison of combined attenuation due to fading / enhancement due to scintillation and multipath mechanism and attenuation due to gaseous absorption with attenuation due to gaseous absorption for interference assessment from space-to-Earth emissions for frequency bands above about 17 GHz     WP 4A   2010-04-26
[ 324 ]  
 
Liaison statement to Working Parties 5C and 6B for action and to Working Parties 3M, 4B, 5A, 6A and 7D for information on WRC-12 Agenda item 1.13     WP 4A   2010-04-14
[ 250 ]  
 
Liaison statement to Working Party 5C - Gateway links for high altitude platform stations (HAPS) in the frequency band 5 850-7 075 MHz     WP 4A   2009-10-14
[ 249 ]  
 
Liaison statement to Working Party 5C (copy to Working Party 6A for information) - Harmonization on electronic news gathering in the satellite frequency bands     WP 4A   2009-10-14
[ 248 ]  
 
Liaison statement to Working Party 5C - Disposition of Recommendation ITU-R SF.675-2     WP 4A   2009-10-14
[ 247 ]  
 
Liaison statement to Working Party 5C - FSS Characteristics to be used for sharing studies in the 71-76 GHz and 81-86 GHz bands     WP 4A   2009-10-14
[ 243 ]  
 
Liaison statement to Working Party 5C - Preliminary review of certain SF-series Recommendations     WP 4A   2009-10-05
[ 206 ]  
 
Liaison statement to Working Parties 5C and 6B for action and to Working Parties 3M, 4B, 5A, 6A and 7D for information on WRC-11 Agenda item 1.13     WP 4A   2009-05-11
[ 193 ]  
 
Liaison statement to Working Party 5C - Methodology for statistically calculating the interference received by the fixed service from space-to-Earth emissions for frequency bands above about 17 GHz     WP 4A   2009-05-11
[ 192 ]  
 
Liaison statement to Working Party 5C - Consideration of technical and regulatory issues relative to the fixed service in the bands between 71 GHz and 238 GHz (WRC-11 Agenda item 1.8)     WP 4A   2009-05-11
[ 191 ]  
 
Liaison statement to Working Party 5C - Gateway links for high altitude platform stations in the range from 5 850 to 7 075 MHz (WRC-11 Agenda item 1.20)     WP 4A   2009-05-11
[ 119 ]  
 
Liaison statement to Working Party 5C - Methodology for statistically calculating the interference received by the fixed service form space-to-earth emissions for frequency bands above about 17 GHz     WP 4A   2008-10-23
[ 118 ]  
 
Liaison statement to Working Party 5A (copy to Working Party 5C for information) - Studies on compatibility of broadband wireless access (BWA) networks and fixes-satellite service (FSS) networks in the 3 400-4 200 MHz band     WP 4A   2008-10-23
[ 117 ]  
 
Liaison statement to Working Parties 7B, 5B and 5C - WRC-11 Agenda item 1.12     WP 4A   2008-10-23
[ 111 ]  
 
Liaison statement to Working Party 5C - Gateway links for high altitude platform stations in the range from 5 850 to 7 075 MHz (WRC-11 Agenda item 1.20)     WP 4A   2008-10-22
[ 110 ]  
 
Liaison statement to interim Working Party 5C - Results of the consideration on the SF-Series Recommendations     WP 4A   2008-10-22
[ 51 ]  
 
Liaison statement to Working Parties 5A and 5C - Compatibility of broadband wireless access (BWA) networks and fixed-satellite service (FSS) networks in the 3 400-4 200 MHz band     WP 4A   2008-05-07
[ 50 ]  
 
Liaison statement to Working Party 5C (copy to Working Parties 1A, 7B, 7C and 7D) - WRC-11 Agenda item 1.8     WP 4A   2008-05-06
[ 49 ]  
 
Liaison statement to Working Parties 5A, 5C and 6X (copy for information and possible action to Working Parties 3M, 4B, 6D, 6G and 7D) - Use of the band 21.4-22 GHz for broadcasting-satellite service and associated feeder-link bands in Regions 1 and 3 (WRC-11 Agenda item 1.13)     WP 4A   2008-05-06
[ 48 ]  
 
Liaison statement to Working Party 5C for information and possible action to Working Parties 3M, 5A, 5B, 7B and 7C - Gateway links for high altitude platform stations in the range from 5 850 to 7 075 MHz (WRC-11 Agenda item 1.20)     WP 4A   2008-05-06
Results:46 total items.
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  ITU-R Web coordinator
Updated : 2024-4-28