Contributions |
|
Number
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 278 ]
|
This document has been withdrawn
|
BR Study Group Department
|
|
2009-11-16 |
|
[ 277 ]
|
Proposal for frequency bands and regulatory options for harmonisation of tuning ranges for ENG use on a regional/worldwide basis (WRC-12 Agenda item 1.5)
|
Austria
,
Russian Federation
,
Latvia (Republic of)
,
France
,
Norway
,
Germany (Federal Republic of)
,
Portugal
,
Hungary (Republic of)
,
Denmark
|
|
2009-11-16 |
|
[ 276 ]
|
Proposed guidance on the feasibility of harmonization of spectrum for ENG use
|
Brazil (Federative Republic of)
|
|
2009-11-16 |
|
[ 275 ]
|
[Working document towards a preliminary draft new Report ITU-R F.[CROSS-BORDER]]
|
Brazil (Federative Republic of)
|
|
2009-11-16 |
|
[ 274 ]
|
Proposed draft CPM text for WRC-12 Agenda item 1.5
|
Korea (Republic of)
|
|
2009-11-15 |
|
[ 273 ]
|
Preliminary draft revision of Recommendation ITU-R F.1764 - Methodology to evaluate interference from fixed service systems using high altitude platform stations to fixed wireless systems in the bands above 3 GHz
|
Korea (Republic of)
|
|
2009-11-15 |
|
[ 272 ]
|
Draft modification of Recommendation ITU-R F.387-10 - Radio-frequency channel arrangements for fixed wireless systems operating in the 11 GHz band
|
Russian Federation
|
|
2009-11-13 |
|
[ 271 ]
|
Improved method of calculating line-of-sight interference into radio-relay systems to account for terrain scattering in Recommendation ITU-R F.1096
|
Russian Federation
|
129/9
|
2009-11-13 |
|
[ 270 ]
|
Proposal on modification of the working document towards a preliminary draft new Report ITU-R F.[CROSS-BORDER]
|
Russian Federation
|
|
2009-11-13 |
|
[ 269 ]
|
Study on potential interference from the broadcasting-satellite service systems in Regions 1 and 3 into fixed service systems in Region 2 in the 21.4-22 GHz band
|
Canada
|
|
2009-11-13 |
|
[ 268 ]
|
Proposed draft liaison statement to Working Party 5A on studies related to WRC-12 Agenda item 1.23
|
Canada
|
|
2009-11-13 |
|
[ 267 ]
|
Study on possible constraints on the broadcasting-satellite service systems in Regions 1 and 3 if subject to a reference power flux density mask in the 21.4-22 GHz band
|
Canada
|
|
2009-11-13 |
|
[ 266 ]
|
Information for studies related to WRC-12 Agenda item 1.25
|
Canada
|
|
2009-11-13 |
|
[ 265 ]
|
CG Report on the draft revision of Recommendation ITU-R F.758-4 - Draft revision of Recommendation ITU-R F.758-4 with the modifications made by the CG activity within the second period
|
Coordinator of CG-Rec758
|
|
2009-11-13 |
|
[ 264 ]
|
Draft new Report [AMS-FS] - Sharing between the aeronautical mobile service and the fixed service in the band 37-38 GHz
|
France
|
|
2009-11-13 |
|
[ 263 ]
|
Preliminary draft new Report ITU-R F.[FS/PASSIVE - 71-81 GHz] - Coexistence between fixed service operating in 71-76 / 81-86 GHz and the passive services in-band or in adjacent bands
|
France
|
|
2009-11-12 |
|
[ 262 ]
|
Technical studies on the impact from HAPS gateway links to fixed and mobile service applications operating in the 5 850-7 075 MHz band
|
France
|
|
2009-11-12 |
|
[ 261 ]
|
Draft liaison statement to ITU-R Working Party 5A (copy to Working Parties 5B and 5C for information) - On the study of cognitive radio systems
|
WP 5D
|
|
2009-11-11 |
|
[ 260 ]
|
Draft liaison statement to Working Parties 6A, 6B and 5B - Response to Working Parties 6A, 6B and 5B regarding the feasibility of worldwide / regional harmonization of spectrum usage for electronic news gathering (ENG)
|
United States of America
|
|
2009-11-10 |
|
[ 259 ]
|
Interference modelling between HAPS gateway links and the fixe-satellite service in the 5850-7075 MHz band
|
United States of America
|
|
2009-11-10 |
|
[ 258 ]
|
Working document toward a draft new Report on the impact of software defined radio (SDR) and cognitive radio systems (CRS) on the fixed service
|
United States of America
|
241 1/8
|
2009-11-10 |
|
[ 257 ]
|
Preliminary draft new Recommendation ITU-R F.[HAPS CHAR] - Technical and operational characteristics of gateway links in the fixed service using high altitude platform stations in the band 5 850-7 075 MHz to be used in sharing studies
|
United States of America
|
|
2009-11-10 |
|
[ 256 ]
|
Proposed modifications to Annex 11 to Working Party 5C Chairman's Report
|
United States of America
|
|
2009-11-10 |
|
[ 255 ]
|
Proposed preliminary draft new Recommendation - Evaluation of interference from high altitude platform gateway links to fixed service point-to-point receivers in the range 5 850-7 025 MHz
|
United States of America
|
|
2009-11-10 |
|
[ 254 ]
|
Proposed revisions to Working Party 5C Chairman's Report (Document 5C/217 (Annex 14)) - "Working document towards a PDRR to Recommendation ITU-R F.758"
|
United States of America
|
|
2009-11-10 |
|
[ 253 ]
|
Proposed revisions to draft text for the CPM Report Chapter 3 for WRC-12 agenda item 1.5
|
United States of America
|
|
2009-11-10 |
|
[ 252 ]
|
Proposed changes to Annex 8 of the Working Party 5C Chairman's Report (Doc. 5C/217) - Working document towards a preliminary draft new Recommendations ITU-R F.[HAPS MODELLING] - Analysis of the impact of interference into haps gateway links from GSO FSS Earth-to-space links in the 5 850-6 725 MHz frequency band
|
United States of America
|
|
2009-11-10 |
|
[ 251 ]
|
Proposed revisions to draft text for the CPM Report - WRC-12 Agenda item 1.5
|
Australia
|
|
2009-11-09 |
|
[ 250 ]
|
Liaison statement to Working Party 5C - Gateway links for high altitude platform stations (HAPS) in the frequency band 5 850-7 075 MHz
|
WP 4A
|
|
2009-10-14 |
|
[ 249 ]
|
Liaison statement to Working Party 5C (copy to Working Party 6A for information) - Harmonization on electronic news gathering in the satellite frequency bands
|
WP 4A
|
|
2009-10-14 |
|
[ 248 ]
|
Liaison statement to Working Party 5C - Disposition of Recommendation ITU-R SF.675-2
|
WP 4A
|
|
2009-10-14 |
|
[ 247 ]
|
Liaison statement to Working Party 5C - FSS Characteristics to be used for sharing studies in the 71-76 GHz and 81-86 GHz bands
|
WP 4A
|
|
2009-10-14 |
|
[ 246 ]
|
Liaison statement to Working Party 5C - Radio nois in the HF frequency band
|
WP 1C
|
231/1
|
2009-10-13 |
|
[ 245 ]
|
Liaison statement to ITU-R Study Group 3 and Working Parties 4A, 4C, 5A, 5B, 5C, 5D, 6A, 7B, 7C, 7D on the progress of WRC-12 Agenda item 1.19
|
WP 1B
|
|
2009-10-12 |
|
[ 244 ]
|
Liaison statement - Further work on PLT
|
WP 1A
|
221-2/1
|
2009-10-09 |
|
[ 243 ]
|
Liaison statement to Working Party 5C - Preliminary review of certain SF-series Recommendations
|
WP 4A
|
|
2009-10-05 |
|
[ 242 ]
|
Liaison statement to Working Party 5C - Information for studies related to WRC-12 Agenda item 1.25
|
WP 4C
|
|
2009-10-05 |
|
[ 241 ]
|
Interim Report on the Study Group 5 activity
|
Chairman, SG 5
|
|
2009-10-01 |
|
[ 240 ]
|
Liaison statement to Working Party 5C - Preliminary draft revision of Recommendations ITU-R SA.1275-2 and SA.1276-2
|
WP 7B
|
|
2009-09-29 |
|
[ 239 ]
|
Liaison statement to ITU-R Working Parties 4A, 5A, and 5C on WRC-12 Agenda item 1.12
|
WP 7B
|
|
2009-09-29 |
|
[ 238 ]
|
Liaison statement to Working Party 5C (copy to Working Party 6B for information) - Harmonization of spectrum for use by terrestrial electronic news gathering systems
|
WP 7B
|
|
2009-09-29 |
|
[ 237 ]
|
Liaison statement to Working Party 6B (copy to Working Party 5C for information) - Preliminary draft new Recommendation ITU-R BT.[ENGUSER] - User requirements for electronic news gathering
|
WP 7B
|
|
2009-09-29 |
|
[ 236 ]
|
Liaison statement to Working Party 5C - Sharing between the space research service (Earth-to-space) and the inter-satellite, fixed and mobile services in the band 22.55-23.15 GHz
|
WP 7B
|
|
2009-09-29 |
|
[ 235 ]
|
Liaison statement to Working Party 4A (copy to Working Party 5C for information) - Request for advice on parameters needed for compatibility studies between NGSO-ISS systems and SRS systems under WRC-12 Agenda item 1.11
|
WP 7B
|
|
2009-09-28 |
|
[ 234 ]
|
Liaison statement to Working Party 5C (copy to Working Parties 5A and 5B for information) - Draft CPM text on WRC-12 Agenda item 1.24
|
WP 7B
|
|
2009-09-28 |
|
[ 233 ]
|
Liaison statement to Working Parties 5B, 5C and 3L - Considerations relating to sharing studies and CPM text in support of WRC-12 Agenda item 1.16 (Resolution 671 (WRC-07))
|
WP 7C
|
|
2009-09-25 |
|
[ 232 ]
|
Reply liaison statement to Working Party 5C - Information regarding studies under Question ITU-R 232-1/7
|
WP 7C
|
232/7
|
2009-09-25 |
|
[ 231 ]
|
Liaison statement to Working Party 5C - WRC-12 Agenda item 1.20 - HAPS gateway links
|
WP 7D
|
|
2009-09-14 |
|
[ 230 ]
|
Liaison statement to Working Party 5C - Sharing analysis between non-GSO meteorological satellite systems operating in the space-to-Earth direction and fixed service systems in the band 7 850-7 900 MHz
|
WP 7B
|
|
2009-09-14 |
|
[ 229 ]
|
ABU views on WRC-12 Agenda items 1.4, 1.5, 1.10, 1.13, 1.14, 1.15, 1.19, 1.22, 1.25
|
Asia-Pacific Broadcasting Union (ABU)
|
|
2009-09-07 |
Results:603 total items. Result page:
Previous -
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10 -
11 -
12 -
13
- Next
|
Multiple Document Download: Formats and Languages to be included (when available):