International Telecommunication Union   ITU
Français  Espańol
 
Site map Contact Us Print version
  Home : ITU-R : WP5C : Contributions  Recently posted -  Search Meeting Documents
   
ITU-R WP5C  C 

ITU-R WP5C

Fixed wireless systems; HF systems in the Fixed and Land Mobile Services

Results:603 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13  - Next Next
Contributions  Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 278 ]  
 
This document has been withdrawn     BR Study Group Department     2009-11-16
[ 277 ]  
 
Proposal for frequency bands and regulatory options for harmonisation of tuning ranges for ENG use on a regional/worldwide basis (WRC-12 Agenda item 1.5)     Austria , Russian Federation , Latvia (Republic of) , France , Norway , Germany (Federal Republic of) , Portugal , Hungary (Republic of) , Denmark     2009-11-16
[ 276 ]  
 
Proposed guidance on the feasibility of harmonization of spectrum for ENG use     Brazil (Federative Republic of)     2009-11-16
[ 275 ]  
 
[Working document towards a preliminary draft new Report ITU-R F.[CROSS-BORDER]]     Brazil (Federative Republic of)     2009-11-16
[ 274 ]  
 
Proposed draft CPM text for WRC-12 Agenda item 1.5     Korea (Republic of)     2009-11-15
[ 273 ]  
 
Preliminary draft revision of Recommendation ITU-R F.1764 - Methodology to evaluate interference from fixed service systems using high altitude platform stations to fixed wireless systems in the bands above 3 GHz     Korea (Republic of)     2009-11-15
[ 272 ]  
 
Draft modification of Recommendation ITU-R F.387-10 - Radio-frequency channel arrangements for fixed wireless systems operating in the 11 GHz band     Russian Federation     2009-11-13
[ 271 ]  
 
Improved method of calculating line-of-sight interference into radio-relay systems to account for terrain scattering in Recommendation ITU-R F.1096     Russian Federation   129/9   2009-11-13
[ 270 ]  
 
Proposal on modification of the working document towards a preliminary draft new Report ITU-R F.[CROSS-BORDER]     Russian Federation     2009-11-13
[ 269 ]  
 
Study on potential interference from the broadcasting-satellite service systems in Regions 1 and 3 into fixed service systems in Region 2 in the 21.4-22 GHz band     Canada     2009-11-13
[ 268 ]  
 
Proposed draft liaison statement to Working Party 5A on studies related to WRC-12 Agenda item 1.23     Canada     2009-11-13
[ 267 ]  
 
Study on possible constraints on the broadcasting-satellite service systems in Regions 1 and 3 if subject to a reference power flux density mask in the 21.4-22 GHz band     Canada     2009-11-13
[ 266 ]  
 
Information for studies related to WRC-12 Agenda item 1.25     Canada     2009-11-13
[ 265 ]  
 
CG Report on the draft revision of Recommendation ITU-R F.758-4 - Draft revision of Recommendation ITU-R F.758-4 with the modifications made by the CG activity within the second period     Coordinator of CG-Rec758     2009-11-13
[ 264 ]  
 
Draft new Report [AMS-FS] - Sharing between the aeronautical mobile service and the fixed service in the band 37-38 GHz     France     2009-11-13
[ 263 ]  
 
Preliminary draft new Report ITU-R F.[FS/PASSIVE - 71-81 GHz] - Coexistence between fixed service operating in 71-76 / 81-86 GHz and the passive services in-band or in adjacent bands     France     2009-11-12
[ 262 ]  
 
Technical studies on the impact from HAPS gateway links to fixed and mobile service applications operating in the 5 850-7 075 MHz band     France     2009-11-12
[ 261 ]  
 
Draft liaison statement to ITU-R Working Party 5A (copy to Working Parties 5B and 5C for information) - On the study of cognitive radio systems     WP 5D     2009-11-11
[ 260 ]  
 
Draft liaison statement to Working Parties 6A, 6B and 5B - Response to Working Parties 6A, 6B and 5B regarding the feasibility of worldwide / regional harmonization of spectrum usage for electronic news gathering (ENG)     United States of America     2009-11-10
[ 259 ]  
 
Interference modelling between HAPS gateway links and the fixe-satellite service in the 5850-7075 MHz band     United States of America     2009-11-10
[ 258 ]  
 
Working document toward a draft new Report on the impact of software defined radio (SDR) and cognitive radio systems (CRS) on the fixed service     United States of America   241 1/8   2009-11-10
[ 257 ]  
 
Preliminary draft new Recommendation ITU-R F.[HAPS CHAR] - Technical and operational characteristics of gateway links in the fixed service using high altitude platform stations in the band 5 850-7 075 MHz to be used in sharing studies     United States of America     2009-11-10
[ 256 ]  
 
Proposed modifications to Annex 11 to Working Party 5C Chairman's Report     United States of America     2009-11-10
[ 255 ]  
 
Proposed preliminary draft new Recommendation - Evaluation of interference from high altitude platform gateway links to fixed service point-to-point receivers in the range 5 850-7 025 MHz     United States of America     2009-11-10
[ 254 ]  
 
Proposed revisions to Working Party 5C Chairman's Report (Document 5C/217 (Annex 14)) - "Working document towards a PDRR to Recommendation ITU-R F.758"     United States of America     2009-11-10
[ 253 ]  
 
Proposed revisions to draft text for the CPM Report Chapter 3 for WRC-12 agenda item 1.5     United States of America     2009-11-10
[ 252 ]  
 
Proposed changes to Annex 8 of the Working Party 5C Chairman's Report (Doc. 5C/217) - Working document towards a preliminary draft new Recommendations ITU-R F.[HAPS MODELLING] - Analysis of the impact of interference into haps gateway links from GSO FSS Earth-to-space links in the 5 850-6 725 MHz frequency band     United States of America     2009-11-10
[ 251 ]  
 
Proposed revisions to draft text for the CPM Report - WRC-12 Agenda item 1.5     Australia     2009-11-09
[ 250 ]  
 
Liaison statement to Working Party 5C - Gateway links for high altitude platform stations (HAPS) in the frequency band 5 850-7 075 MHz     WP 4A     2009-10-14
[ 249 ]  
 
Liaison statement to Working Party 5C (copy to Working Party 6A for information) - Harmonization on electronic news gathering in the satellite frequency bands     WP 4A     2009-10-14
[ 248 ]  
 
Liaison statement to Working Party 5C - Disposition of Recommendation ITU-R SF.675-2     WP 4A     2009-10-14
[ 247 ]  
 
Liaison statement to Working Party 5C - FSS Characteristics to be used for sharing studies in the 71-76 GHz and 81-86 GHz bands     WP 4A     2009-10-14
[ 246 ]  
 
Liaison statement to Working Party 5C - Radio nois in the HF frequency band     WP 1C   231/1   2009-10-13
[ 245 ]  
 
Liaison statement to ITU-R Study Group 3 and Working Parties 4A, 4C, 5A, 5B, 5C, 5D, 6A, 7B, 7C, 7D on the progress of WRC-12 Agenda item 1.19     WP 1B     2009-10-12
[ 244 ]  
 
Liaison statement - Further work on PLT     WP 1A   221-2/1   2009-10-09
[ 243 ]  
 
Liaison statement to Working Party 5C - Preliminary review of certain SF-series Recommendations     WP 4A     2009-10-05
[ 242 ]  
 
Liaison statement to Working Party 5C - Information for studies related to WRC-12 Agenda item 1.25     WP 4C     2009-10-05
[ 241 ]  
 
Interim Report on the Study Group 5 activity     Chairman, SG 5     2009-10-01
[ 240 ]  
 
Liaison statement to Working Party 5C - Preliminary draft revision of Recommendations ITU-R SA.1275-2 and SA.1276-2     WP 7B     2009-09-29
[ 239 ]  
 
Liaison statement to ITU-R Working Parties 4A, 5A, and 5C on WRC-12 Agenda item 1.12     WP 7B     2009-09-29
[ 238 ]  
 
Liaison statement to Working Party 5C (copy to Working Party 6B for information) - Harmonization of spectrum for use by terrestrial electronic news gathering systems     WP 7B     2009-09-29
[ 237 ]  
 
Liaison statement to Working Party 6B (copy to Working Party 5C for information) - Preliminary draft new Recommendation ITU-R BT.[ENGUSER] - User requirements for electronic news gathering     WP 7B     2009-09-29
[ 236 ]  
 
Liaison statement to Working Party 5C - Sharing between the space research service (Earth-to-space) and the inter-satellite, fixed and mobile services in the band 22.55-23.15 GHz     WP 7B     2009-09-29
[ 235 ]  
 
Liaison statement to Working Party 4A (copy to Working Party 5C for information) - Request for advice on parameters needed for compatibility studies between NGSO-ISS systems and SRS systems under WRC-12 Agenda item 1.11     WP 7B     2009-09-28
[ 234 ]  
 
Liaison statement to Working Party 5C (copy to Working Parties 5A and 5B for information) - Draft CPM text on WRC-12 Agenda item 1.24     WP 7B     2009-09-28
[ 233 ]  
 
Liaison statement to Working Parties 5B, 5C and 3L - Considerations relating to sharing studies and CPM text in support of WRC-12 Agenda item 1.16 (Resolution 671 (WRC-07))     WP 7C     2009-09-25
[ 232 ]  
 
Reply liaison statement to Working Party 5C - Information regarding studies under Question ITU-R 232-1/7     WP 7C   232/7   2009-09-25
[ 231 ]  
 
Liaison statement to Working Party 5C - WRC-12 Agenda item 1.20 - HAPS gateway links     WP 7D     2009-09-14
[ 230 ]  
 
Liaison statement to Working Party 5C - Sharing analysis between non-GSO meteorological satellite systems operating in the space-to-Earth direction and fixed service systems in the band 7 850-7 900 MHz     WP 7B     2009-09-14
[ 229 ]  
 
ABU views on WRC-12 Agenda items 1.4, 1.5, 1.10, 1.13, 1.14, 1.15, 1.19, 1.22, 1.25     Asia-Pacific Broadcasting Union (ABU)     2009-09-07
Results:603 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  ITU-R Web coordinator
Updated : 2011-12-16