International Telecommunication Union   ITU
Français  Espańol
 
Site map Contact Us Print version
  Home : ITU-R : WP5B : Contributions  Recently posted -  Search Meeting Documents
   
ITU-R WP5B  C 

ITU-R WP5B

Maritime mobile service including Global Maritime Distress and Safety System (GMDSS); aeronautical mobile service and radiodetermination service

Results:11 total items.
Contributions  [ Source: WP 4A ]   Documents / Contributions
 
Number 
Title Source Date
[ 748 ]  
 
Liaison statement to Working Party 5B - Preliminary draft new Report ITU-R M.[UAS-CNPC-CHAR] - Example of technical characteristics for unmanned aircraft control and non-payload communications ( CNPC) links     WP 4A   2011-10-06
[ 747 ]  
 
Liaison statement to Working Party 5B - Preliminary draft new Report ITU-R M.[UAS-BANDS-NEW-ALLOC-5 091-5 150 MHz] - Preliminary draft new Report ITU-R M.[UAS-BANDS-NEW-ALLOC-15.4-15.5 GHz]     WP 4A   2011-10-06
[ 744 ]  
 
Liaison statement to Study Group 1 (copy to Study Groups 5, 6, 7 and Working Party 1A) - A database for the protection of radio services     WP 4A   2011-09-29
[ 743 ]  
 
Liaison statement to Working Party 5D (copy to Working Parties 5A, 5B, 6A and 7B for information) - Draft revisions of Recommendations ITU-R M.1580-3 and ITU-R M.1581-3     WP 4A   2011-09-29
[ 649 ]  
 
Liaison statement to Working Party 5B (copy to Working Party 4B for information) - Preliminary draft new Report ITU-R M.[UAS-PERF-AND-REQ] - Example of characteristics and potential performance requirements for unmanned aircraft control and non-payload communications (CNPC) links     WP 4A   2011-05-24
[ 463 ]  
 
Liaison statement to Working Party 5B on WRC-12 Agenda item 1.3 - Use of FSS for unmanned aircraft     WP 4A   2010-04-30
[ 328 ]  
 
Liaison statement to Working Party 5B - Performance requirements for Unmanned Aircraft Systems     WP 4A   2009-10-14
[ 327 ]  
 
Liaison statement to Working Party 5B (copy to Working Parties 3M and 7D for information) - Preliminary draft new Report on compatibility analysis and results for radiolocation systems planned to operate in the 15.4 to 17.3 GHz band and fixed-satellite service operating in the 15.4-15.7 GHz band     WP 4A   2009-10-14
[ 230 ]  
 
Liaison statement to Working Party 5B (copy to Working Parties 3M and 7D for information) - Compatibility studies between the radiolocation service and the fixed-satellite service     WP 4A   2009-05-11
[ 161 ]  
 
Liaison statement to Working Parties 7B, 5B and 5C - WRC-11 Agenda item 1.12     WP 4A   2008-10-23
[ 61 ]  
 
Liaison statement to Working Party 5C for information and possible action to Working Parties 3M, 5A, 5B, 7B and 7C - Gateway links for high altitude platform stations in the range from 5 850 to 7 075 MHz (WRC-11 Agenda item 1.20)     WP 4A   2008-05-06
Results:11 total items.
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  ITU-R Web coordinator
Updated : 2024-4-29