Contributions |
|
Number
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 763 ]
|
Considerations related to preliminary draft revision of Recommendation ITU-R M.585-5
|
Director, BR
|
|
2011-10-28 |
|
[ 762 ]
|
Modification to preliminary draft new Recommendation ITU-R M.[500 kHz-16 QAM]
|
France
|
|
2011-10-29 |
|
[ 761 ]
|
Liaison statement to Working Parties 1A, 4A, 4C, 5A, 5B, 5C, 5D, 6A, 7B, 7C and 7D - Handbook on "Propagation information for the prediction of interference and coordination distance"
|
SG 3
|
|
2011-10-31 |
|
[ 760 ]
|
Proposed amendments to Working document toward a preliminary draft new Recommendation - Operational and technical characteristics of radio altimeters [utilizing the band 4 200-4 400 MHz]
|
Canada
|
|
2011-10-27 |
|
[ 759 ]
|
Proposed modification to Recommendation ITU-R M.1841 - Compatibility between FM sound-broadcasting in the band of about 87-108 MHz and the aeronautical ground-based augmentation system in the band about 108-117.975 MHz
|
Germany (Federal Republic of)
|
|
2011-10-26 |
|
[ 758 ]
|
Liaison statement to Working Party 5B - Preliminary draft revision of Report ITU-R M.2172 - Radiolocation sharing feasibility in the 154-156 MHz bands
|
WP 7D
|
|
2011-10-28 |
|
[ 757 ]
|
Liaison statement to Working Party 5B (copy to Working Party 4B for information) - Propagation end-to-end link availability of unmanned aircraft system operating with dual beyond line-of-sight (BLOS) satellite communications links to achieve the assume link availability
|
WP 3J and WP 3M
|
|
2011-10-26 |
|
[ 756 ]
|
Liaison statement to ITU-T Study Group 15 and ITU-R Study Group 5 - Utilization of Telecommunications/ICTS for disaster preparedness, mitigation and response
|
ITU-D SG 2
|
|
2011-10-21 |
|
[ 755 ]
|
Liaison statement to Working Party 5B - Compatibility studies in relation to Resolution 224
|
WP 5D
|
|
2011-10-21 |
|
[ 754 ]
|
Liaison statement to ITU-R Working Party 5B - Workplan for revision of Recommendation ITU-R M.493-13
|
International Maritime Organisation
|
|
2011-10-18 |
|
[ 753 ]
|
Outcome of the seventh meeting of the Joint IMO/ITU Experts Group on maritime radiocommunication matters
|
International Maritime Organisation
|
|
2011-10-18 |
|
[ 752 ]
|
Draft new Report ITU-R M.[AMrS_1GHz_SHARING] - AMrS sharing studies in the frequency band 960-1 164 MHz
|
Netherlands (Kingdom of the)
|
|
2011-10-14 |
|
[ 751 ]
|
Draft new Recommendation ITU-R M.[CHARLIE] - Technical characteristics of and protection criteria for non-ICAO ARNS systems, operating around 1 GHz
|
Netherlands (Kingdom of the)
|
|
2011-10-14 |
|
[ 750 ]
|
Liaison statement to Working Party 5D (copy to WPs 4A, 5A, 5B and 6A for information) - Draft revisions of Recommendations ITU-R M.1580-3 and ITU-R M.1581-3
|
WP 7B
|
|
2011-10-13 |
|
[ 749 ]
|
Liaison statement to Study Group 1 (for information to Study Group 7 and Working Parties 1A, 1B, 4A, 4C, 5B and 5C) - Definitions for adjacent channel leakage power ratio (ACLR) and adjacent channel selectivity (ACS)
|
WP 6A
|
|
2011-10-10 |
|
[ 748 ]
|
Liaison statement to Working Party 5B - Preliminary draft new Report ITU-R M.[UAS-CNPC-CHAR] - Example of technical characteristics for unmanned aircraft control and non-payload communications ( CNPC) links
|
WP 4A
|
|
2011-10-06 |
|
[ 747 ]
|
Liaison statement to Working Party 5B - Preliminary draft new Report ITU-R M.[UAS-BANDS-NEW-ALLOC-5 091-5 150 MHz] - Preliminary draft new Report ITU-R M.[UAS-BANDS-NEW-ALLOC-15.4-15.5 GHz]
|
WP 4A
|
|
2011-10-06 |
|
[ 746 ]
|
Liaison statement to Working Parties 4C and 5B - Potential interference between the Earth exploration-satellite (active) service in the 1 215-1 300 MHz band and the air-route surveillance radars in the 1 215-1 400 MHz band
|
WP 7C
|
|
2011-10-04 |
|
[ 745 ]
|
Liaison statement to WP 5B - Frequency band studies to support operation of unmanned aircraft within proposed new allocations in the 5 000-5 150 MHz and 15.4-15.5 GHz bands
|
WP 7D
|
|
2011-09-30 |
|
[ 744 ]
|
Liaison statement to Study Group 1 (copy to Study Groups 5, 6, 7 and Working Party 1A) - A database for the protection of radio services
|
WP 4A
|
|
2011-09-29 |
|
[ 743 ]
|
Liaison statement to Working Party 5D (copy to Working Parties 5A, 5B, 6A and 7B for information) - Draft revisions of Recommendations ITU-R M.1580-3 and ITU-R M.1581-3
|
WP 4A
|
|
2011-09-29 |
|
[ 742 ]
|
Liaison statement to Study Group 1 (copy to Study Groups 5, 6, 7 and Working parties 1A, 4A) - A database for the protection of radio services
|
WP 4C
|
|
2011-09-28 |
|
[ 741 ]
|
Identities for AIS-SART, MOB and EPIRB-AIS
|
International Maritime Radio Association
|
|
2011-09-26 |
|
[ 740 ]
|
Liaison statement to Working Party 5B - Impact of increased MSS emissions
|
WP 4C
|
|
2011-09-26 |
|
[ 739 ]
|
Reply liaison statement to Working Party 5B - Comments on preliminary draft new Report ITU-R M.[UAS-BANDS-NEW-ALLOC 5 000-5 030 MHz]
|
WP 4C
|
|
2011-09-26 |
|
[ 738 ]
|
Liaison statement to Working Party 5B and ICAO - Potential interference between the ICAO standard microwave landing system (MLS) operating above 5 030 MHz and radionavigation-satellite service (RNSS) systems in the band 5 000-5 030 MHz
|
WP 4C
|
|
2011-09-26 |
|
[ 737 ]
|
Liaison statement to Working Party 5B (copy to Working Party 4A for information) - Reply liaison statement on potential link availability for unmanned aircraft control and non-payload communications (CNPC) links
|
WP 4B
|
|
2011-09-23 |
|
[ 736 ]
|
Reply liaison statement to Working Party 5B - Comments on preliminary draft new Report ITU-R M.[UAS-CNPC-CHAR]
|
WP 4C
|
|
2011-09-23 |
|
[ 735 ]
|
Liaison statement to Working Party 5B - Applications, characteristics and protection criteria for radionavigation-satellite service systems operating in the 5 000-5 010 MHz and 5 010-5 030 MHz bands
|
WP 4C
|
|
2011-09-23 |
|
[ 734 ]
|
Frequency band using for electronic news gathering, outside broadcast and program field production
|
Regional Commonwealth in the Field of Communications
|
89/6
|
2011-09-19 |
|
[ 733 ]
|
Liaison statement to Study Group 1 and Working Party 1A (copy to Study Groups 4, 6 and 7) - A database for the protection of radio services
|
WPs 5A, 5B, 5C, 5D
|
|
2011-08-23 |
|
[ 732 ]
|
Liaison statement to ITU-R Working Party 4A, Working Party 5A, Working Party 5B, Working Party 6A, Working Party 7B for information only - Draft revisions of Recommendations ITU-R M.1580-3 and ITU-R M.1581-3
|
WP 5D
|
|
2011-07-26 |
|
[ 731 ]
|
Liaison statement to relevant Working Parties of ITU-R Study Groups 4, 5, 6 and 7 - Status of studies in support of WRC-12 Agenda item 1.5
|
WP 5C
|
|
2011-07-05 |
|
[ 730 ]
|
Liaison statement to Working Parties 5B and 7D - Automotive radar in the 79 GHz band
|
WP 5A
|
|
2011-06-27 |
|
[ 729 ]
|
Liaison statement to Working Parties 4A, 4C, 5B, 5C, 7B, 7C and 7D - On proposed revisions to Recommendation ITU-R M.1732
|
WP 5A
|
|
2011-06-27 |
|
[ 728 ]
|
Liaison statement to Working Parties 3M, 4A, 5A, 5B, 7B and 7C - Status of studies in support of WRC-12 Agenda item 1.20
|
WP 5C
|
|
2011-06-24 |
|
[ 727 ]
+Ann.1-44 |
Report on the seventh meeting of Working Party 5B (Geneva, 13-23 June 2011)
|
Chairman, WP 5B
|
|
2011-06-24 |
|
[ 726 ]
|
Final List of Participants - Working Party 5B (Geneva, 13-23 June 2011)
|
Director, BR
|
|
2011-06-24 |
|
[ 725 ]
|
Liaison statement to ITU-R Working Parties 1A, 1B, 4A, 4C, 5A, 5B, 5D, 6A, 7B, 7C and 7D - Revisions of F-Series Recommendations on the interference criteria (Recommendations ITU-R F.758-4 and ITU-R F.1495-1)
|
WP 5C (W)
|
|
2011-06-22 |
|
[ 724 ]
|
Proposed joint liaison statement to Study Group 1 and Working Party 1A - A database for the protection of radio services
|
Chairmen, WPs 5A and 5C
|
|
2011-06-21 |
|
[ 723 ]
|
Results of the 18th RAG meeting
|
Chairman, SG 5
|
|
2011-06-13 |
|
[ 722 ]
|
List of documents issued
|
BR Study Group Department
|
|
2011-06-10 |
|
[ 721 ]
|
Liaison statement to ITU-R Working Parties 4C, 5A, 5B, 5C 6A and 7D (copy to ITU-R Working Party 3L and to ITU-T Study Groups 5 and 15 for information and/or action if any) - Developments on PLT systems
|
WP 1A
|
|
2011-06-10 |
|
[ 720 ]
|
Liaison statement to Study Groups 4, 5, 6 and 7 and relegvant Working Parties (copy to ITU-T Study Group 15) - Activities regarding the protection range calculation between inductive systems and radiocommunication services using frequencies below 30 MHz
|
WP 1A
|
|
2011-06-10 |
|
[ 719 ]
|
Liaison statement to Study Groups 4, 5, 6 and 7 and relevant Working Parties - Protection of radiocommunication services using digital modulation against interference caused by radiation from industrial, scientific and medical (ISM) equipment
|
WP 1A
|
|
2011-06-09 |
|
[ 718 ]
|
Liaison statement to Working Party 5B on absolute limits for radar emissions
|
WP 1A
|
|
2011-06-09 |
|
[ 717 ]
|
Liaison statement to Study Groups 4, 6 and 7 and Working Parties 5A, 5B, 5C and 5D on a database for the protection of radio services
|
SG 1
|
|
2011-06-08 |
|
[ 716 ]
|
Draft revision of Recommendation ITU-R M.1173 - Technical characteristics of single-sideband transmitters used in the maritime mobile service for radiotelephony in the bands between 1 605.5 kHz (1 605 kHz Region 2) and 4 000 kHz and between 4 000 kHz and 27 500 kHz
|
Japan
|
|
2011-06-06 |
|
[ 715 ]
|
Draft revision of Recommendation ITU-R M.1084-4 - Interim solutions for improved efficiency in the use of the band 156-174 MHz by stations in the maritime mobile service
|
Japan
|
|
2011-06-06 |
|
[ 714 ]
|
Proposal for editorial updating of Recommendations ITU-R M.1081 and ITU-R M.1082-1
|
Japan
|
|
2011-06-06 |
Results:813 total items. Result page:
Previous -
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10 -
11 -
12 -
13 -
14 -
15 -
16 -
17
- Next
|
Multiple Document Download: Formats and Languages to be included (when available):