Contributions |
|
Number
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 338 ]
|
Draft revision to Report ITU-R M.2120
|
United States of America
|
|
2009-11-10 |
|
[ 337 ]
|
Data rate validations study for UAS video transmissions
|
EUROCONTROL
|
|
2009-11-10 |
|
[ 336 ]
|
Proposed draft reply liaison statement to ITU-R Working Party 7B on sharing between the space research service (Earth-to-space) and the inter-satellite, fixed and mobile services in the band 22.55-23.15 GHz
|
United States of America
|
|
2009-11-10 |
|
[ 335 ]
|
Proposed draft reply liaison statement to ITU-R Working Party 5C on sharing between potential aeronautical mobile service applications and the fixed service in the band 37-38 GHz
|
United States of America
|
|
2009-11-10 |
|
[ 334 ]
|
Working document towards a draft new Report ITU-R M.[RLS 3-50 MHz SHARING] on the feasibility of sharing sub-bands within the 3-50 MHz bandwidth oceanographic radars
|
United States of America
|
240/5
|
2009-11-10 |
|
[ 333 ]
|
Preliminary draft new ITU-R Report - WRC Agenda item 1.15 - Sharing considerations regarding the operation of oceanographic radars and HF services within sub-bands in the MHz to 50 MHz band
|
United States of America
|
240/5
|
2009-11-10 |
|
[ 332 ]
|
Liaison statement to Joint Task Group 5-6 (copied to WP 5B for information) - IMT parameters for the band 790-862 MHz
|
WP 5D
|
|
2009-11-06 |
|
[ 331 ]
|
Comments on Recommendation ITU-R M.493-13
|
United Kingdom of Great Britain and Northern Ireland
|
|
2009-11-05 |
|
[ 330 ]
|
Liaison note to WP 5B on spectrum requirements for future digital communication systems in conjunction with WRC-12 Agenda item 1.10
|
IALA
|
|
2009-10-29 |
|
[ 329 ]
|
Implementation of Resolution 355 (WRC-07) concerning the future list of coast stations and special service stations (List IV)
|
Director, BR
|
|
2009-10-15 |
|
[ 328 ]
|
Liaison statement to Working Party 5B - Performance requirements for Unmanned Aircraft Systems
|
WP 4A
|
|
2009-10-14 |
|
[ 327 ]
|
Liaison statement to Working Party 5B (copy to Working Parties 3M and 7D for information) - Preliminary draft new Report on compatibility analysis and results for radiolocation systems planned to operate in the 15.4 to 17.3 GHz band and fixed-satellite service operating in the 15.4-15.7 GHz band
|
WP 4A
|
|
2009-10-14 |
|
[ 326 ]
|
Liaison statement to Working Party 5B - radar emission measurements in the out of band domain
|
WP 1C
|
230/1
|
2009-10-13 |
|
[ 325 ]
|
Proposed revisions to preliminary draft revision to Report ITU-R M.2120 - Initial estimate of new aviation AM(R)S spectrum requirements
|
Netherlands (Kingdom of the)
|
|
2009-10-12 |
|
[ 324 ]
|
Liaison statement to ITU-R Study Group 3 and Working Parties 4A, 4C, 5A, 5B, 5C, 5D, 6A, 7B, 7C, 7D on the progress of WRC-12 Agenda item 1.19
|
WP 1B
|
|
2009-10-12 |
|
[ 323 ]
|
Liaison statement - Progress of work in the WP 5B Rapporteur Group on future work related to Annex 8 of Recommendation ITU-R SM.1541-2
|
WP 1A
|
|
2009-10-09 |
|
[ 322 ]
|
Liaison statement - Further work on PLT
|
WP 1A
|
221-1/1
|
2009-10-09 |
|
[ 321 ]
|
Liaison statement to Working Party 5B - Information for studies related to WRC-12 Agenda item 1.25
|
WP 4C
|
|
2009-10-06 |
|
[ 320 ]
|
Liaison statement to Working Party 5B - WRC-12 Agenda item 1.18
|
WP 4C
|
|
2009-10-06 |
|
[ 319 ]
|
Reply liaison statement to Working Party 5B - Compatibility between aeronautical mobile (R) service systems and radionavigation-satellite service systems in the 5 000-5 010 MHz and 5 010-5 030 MHz bands
|
WP 4C
|
|
2009-10-06 |
|
[ 318 ]
|
Liaison statement to Working Party 5B related to WRC-12 Agenda item 1.4, Resolution 417 (WRC-07)
|
WP 4C
|
|
2009-10-06 |
|
[ 317 ]
|
Liaison statement to Working Party 5B - Potential interference between the ICAO standard microwave landing system (MLS) operating above 5 030 MHz and planned radionavigation-satellite service (RNSS) in the band 5 000-5 030 MHz
|
WP 4C
|
288/4, 217-2/4
|
2009-10-06 |
|
[ 316 ]
|
Interim Report on the Study Group 5 activity
|
Chairman, SG 5
|
|
2009-10-01 |
|
[ 315 ]
|
Liaison statement to Working Party 5B - Technical information regarding studies between the space research service (space-to-earth) and the aeronautical mobile service in the 37-38 GHz band
|
WP 7B
|
|
2009-09-29 |
|
[ 314 ]
|
Liaison statement to Working Party 5B - Sharing between the space research service (Earth-to-space) and the inter-satellite, fixed and mobile services in the band 22.55-23.15 GHz
|
WP 7B
|
|
2009-09-29 |
|
[ 313 ]
|
Liaison statement to Working Party 5C (copy to Working Parties 5A and 5B for information) - Draft CPM text on WRC-12 Agenda item 1.24
|
WP 7B
|
|
2009-09-28 |
|
[ 312 ]
|
Liaison statement to Working Parties 5B, 5C and 3L - Considerations relating to sharing studies and CPM text in support of WRC-12 Agenda item 1.16 (Resolution 671 (WRC-07))
|
WP 7C
|
|
2009-09-25 |
|
[ 311 ]
|
Liaison statement to Working Party 5B - Radio astronomy issues related to WRC-12 Agenda item 1.15
|
WP 7D
|
|
2009-09-17 |
|
[ 310 ]
|
ABU views on WRC-12 Agenda items 1.4, 1.5, 1.10, 1.13, 1.14, 1.15, 1.19, 1.22, 1.25
|
Asia-Pacific Broadcasting Union (ABU)
|
|
2009-09-07 |
|
[ 309 ]
|
Liaison statement to Working Party 5B - Satellite detection of AIS
|
International Maritime Organization
|
|
2009-09-01 |
|
[ 308 ]
|
Liaison statement - Report of the 1st meeting of the Focus Group on Future Networks (FG-FN)
|
Chairman, ITU-T Focus Group on FN
|
|
2009-07-28 |
|
[ 307 ]
(Rev.1) |
Studies in relation to WRC-12 Agenda item 1.21
|
Ukraine
|
|
2009-08-04 |
|
[ 306 ]
|
Liaison statement to Working Party 5B - Studies in the band 790-862 MHz related to IMT
|
WP 5D
|
|
2009-07-17 |
|
[ 305 ]
|
Liaison statement to Joint Task Group 5-6 - IMT parameters for the band 790-862 MHz (copied to Working Party 5B for information)
|
WP 5D
|
|
2009-07-17 |
|
[ 304 ]
|
Liaison statement to ITU-R Working Parties 1B and 5A (copy to Working Parties 5B and 5C for information) - On the study of software-defined radio (SDR) and cognitive radio systems (CRS)
|
WP 5D
|
|
2009-07-06 |
|
[ 303 ]
|
Liaison statement to Working Parties 1A, 4A, 4C, 5A, 5B, 5C, 5D, 6A, 7C, 7D and Joint Task Group 5-6 - Development of a Handbook on propagation information for the prediction of interference and coordination distance
|
WP 3M
|
|
2009-06-18 |
|
[ 302 ]
|
Liaison statement to Working Party 5B - Application of GRWAVE to oceanographic radar systems
|
WP 3L
|
|
2009-06-18 |
|
[ 301 ]
|
Liaison statement to Working Party 5B copy to Working Party 7B for information - Sharing between the aeronautical mobile and the fixed service in the band 37-38 GHz
|
WP 5C
|
|
2009-06-12 |
|
[ 300 ]
|
Liaison statement - Protection criteria and system parameters for fixed and mobile systems operating between 3 and 30 MHz
|
WP 5C
|
|
2009-05-29 |
|
[ 299 ]
|
Liaison statement to Working Party 5B (copy to WP 5A for information) - Compatibility studies between radiolocation and fixed service in the band 30-300 MHz (WRC-11 Agenda item 1.14)
|
WP 5C
|
|
2009-05-29 |
|
[ 298 ]
|
Liaison statement to Working Party 7C (for information to Working Parties 3L, 5B and 7A) - Considerations relating to sharing and compatibility studies in support of WRC-11 Agenda item 1.16 (Resolution 671 (WRC-07))
|
WP 5C
|
|
2009-05-29 |
|
[ 297 ]
|
Liaison statement to Working Party 5D copy to Working Parties 5A and 5B for information - Applicability of Recommendation ITU-R F.1336-2 for sectoral antenna patterns approximation
|
WP 5C
|
|
2009-05-28 |
|
[ 296 ]
+Ann.1-38 |
Report of the third meeting of Working Party 5B - (Geneva, 19-28 May 2009)
|
Chairman, WP 5B
|
|
2009-05-28 |
|
[ 295 ]
|
Liaison statement to Working Party 1B on the study of software-defined radio and cognitive radio systems (copy for information to WPs 5B, 5C and 5D)
|
WP 5A
|
|
2009-05-28 |
|
[ 294 ]
|
Final List of Participants - Working Party 5B (Geneva, 19-28 May 2009)
|
Director, BR
|
|
2009-05-28 |
|
[ 293 ]
|
Construction of the web page for the analytical list of the Study Group 5 Recommendations
|
Chairman, SG 5
|
|
2009-05-27 |
|
[ 292 ]
|
Liaison statement to Working Party 5B on studies related to WRC-11 Agenda item 1.23
|
WP 5A
|
|
2009-05-28 |
|
[ 291 ]
|
Liaison statement to Working Party 5B (copy to Working Party 5C for information) - WRC-11 Agenda item 1.14
|
WP 5A
|
|
2009-05-27 |
|
[ 290 ]
|
Liaison statement to WP 5B on studies related to WRC-11 Agenda item 1.23
|
WP 5A
|
|
2009-05-22 |
|
[ 289 ]
|
List of documents issued
|
BR Study Group Department
|
|
2009-05-18 |
Results:813 total items. Result page:
Previous -
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10 -
11 -
12 -
13 -
14 -
15 -
16 -
17
- Next
|
Multiple Document Download: Formats and Languages to be included (when available):