Contributions |
|
Number
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 296 ]
|
Proposed update to Working document towards a preliminary draft new Report ITU-R M.[MLS_RNSS] - Potential interference between the ICAO standard microwave landing system (MLS) operating above 5 030 MHz and planned radionavigation-satellite service (RNSS) in the band 5 000-5 030 MHz
|
United States of America
|
288/4, 217-2/4
|
2009-08-21 |
|
[ 295 ]
|
Proposed update to preliminary draft new Recommendation ITU-R M.[S-E RX+TX]
|
United States of America
|
288/4, 217-2/4
|
2009-08-21 |
|
[ 294 ]
|
Proposed draft revision of Recommendation ITU-R M.1787 - Description of systems and networks in the radionavigation-satellite service (space-to-Earth and space-to-space) and technical characteristics of transmitting space stations operating in the bands 1 164-1 215 MHz, 1 215-1 300 MHz and 1 559-1 610 MHz
|
United States of America
|
288/4, 217-2/4
|
2009-08-21 |
|
[ 293 ]
|
Proposed update to preliminary draft new Recommendation ITU-R M.[E-S TX+RX]
|
United States of America
|
288/4, 217-2/4
|
2009-08-21 |
|
[ 292 ]
|
Proposed update to draft new Recommendation ITU-R M.[1479_NEW]
|
United States of America
|
288/4, 217-2/4
|
2009-08-21 |
|
[ 291 ]
|
Proposed update to draft new Recommendation ITU-R M.[1088_NEW]
|
United States of America
|
288/4, 217-2/4
|
2009-08-21 |
|
[ 290 ]
|
Proposed update to draft new Recommendation ITU-R M.[1477_NEW]
|
United States of America
|
288/4, 217-2/4
|
2009-08-21 |
|
[ 289 ]
|
Proposals for draft new Recommendations ITU-R M.[CHAR-RX3], M.[1088_NEW], M.[1477_NEW]. M.[1479_NEW] and M.[RNSS_GUIDE]
|
United States of America
|
288/4, 217-2/4
|
2009-08-21 |
|
[ 288 ]
|
Proposed liaison statement from Working Party 4C to Working Party 5B related to WRC-12 Agenda item 1.4 (Resolution 420 (WRC-07))
|
United States of America
|
|
2009-08-21 |
|
[ 287 ]
|
Proposed update to working document towards a preliminary draft new Report ITU-R M.[5GHZ_APP] - RNSS applications for the 5 000-5 010 MHz and 5 010-5 030 MHz bands
|
United States of America
|
288/4, 217-2/4
|
2009-08-21 |
|
[ 286 ]
|
Draft new Report ITU-R M.[REP-MOBDIS] - Use and examples of mobile-satellite service systems and ancillary equipment for relief operation in the event of natural disasters and similar emergencies
|
United States of America
|
|
2009-08-21 |
|
[ 285 ]
|
Draft new Recommendation ITU-R M.[MOBDIS] - Use of mobile-satellite service (MSS) in disaster response an relief (Questions ITU-R 286/4 and 227/4)
|
United States of America
|
286/4, 227/4
|
2009-08-21 |
|
[ 284 ]
|
Working document towards text for the draft conference preparatory meeting (CPM) Report - Potential interference from the radiodetermination-satellite service in the 2 483-2 500 MHz band (space-to-Earth) to the mobile-satellite service
|
United States of America
|
|
2009-08-21 |
|
[ 283 ]
|
Proposed update to preliminary draft new Report ITU-R M.[RNSS_PULSE_PARAMS] - Calculation method for aggregate interference emission parameters of pulsed RF systems operating in and near the bands 1 164-1 215 MHz and 1 215-1 300 MHz on the radionavigation-satellite service airborne and ground-based receivers
|
United States of America
|
236-2/8, 217-2/4
|
2009-08-21 |
|
[ 282 ]
|
Technical characteristics of a potential Non-GESO satellite system that could operate in new MSS frequency bands between 4 and 16 GHz
|
United States of America
|
|
2009-08-21 |
|
[ 281 ]
|
Proposed revisions to preliminary draft new Recommendation ITU-R M.[PULSE_EVAL] -Evaluation model for pulsed interference from relevant radio sources other than in the radionavigation-satellite service to the radionavigation-satellite service systems and networks operating in the 1 164-1 215 MHz, 1 215-1 300 MHz, 1 559-1 610 MHz and 5 010-5 030 MHz bands
|
United States of America
|
288/4, 217-2/4
|
2009-08-21 |
|
[ 280 ]
|
Study and proposal on Complementary Ground Component (CGC) applications
|
EUROCONTROL
|
|
2009-08-21 |
|
[ 279 ]
|
Proposed method of work for WRC-12 Agenda item 1.7 - Estimated spectrum requirements for the aeronautical mobile satellite (R) service
|
Brazil (Federative Republic of)
|
|
2009-08-20 |
|
[ 278 ]
|
Considerations on WRC-12 Agenda item 1.25
|
Brazil (Federative Republic of)
|
|
2009-08-21 |
|
[ 277 ]
|
Proposed modifications to the working document towards a preliminary draft new Report ITU-R M.[AMSRS SPECTRUM ESTIMATE] - AMS(R)S communication requirements forecasts and estimated future spectrum requirements
|
PT. Asia Cellular Satellite (ACeS)
|
|
2009-08-20 |
|
[ 276 ]
|
Methods to satisfy WRC-12 Agenda item 1.7 (Resolution 222 (Rev. WRC-07)) - Proposals for the draft CPM Report
|
Russian Federation
|
|
2009-08-20 |
|
[ 275 ]
|
Proposals for modification of the working document towards draft CPM text on WRC-12 Agenda item 1.18 (Resolution 613 (WRC-07))
|
Russian Federation
|
|
2009-08-20 |
|
[ 274 ]
|
Proposed suggestions to be considered in a preliminary draft revision of Recommendation ITU-R M.1787 - Description of systems and networks in the radionavigation-satellite service (space-to-Earth and space-to-space) and technical characteristics of transmitting space stations operating in the bands 1 164-1 215 MHz, 1 215-1 300 MHz and 1 559-1 610 MHz
|
Chairman, WP 4C
|
288/4, 217-2/4
|
2009-08-20 |
|
[ 273 ]
|
Draft list of terminology on emergency telecommunications
|
BR Study Group Department
|
|
2009-08-19 |
|
[ 272 ]
|
Proposed modifications to the working document towards a preliminary draft new Recommendation ITU-R M.[AMS(R)S SPECTRUM] - Methodology(s) for estimating spectrum requirements of the aeronautical mobile-satellite (R) service
|
PT. Asia Cellular Satellite (ACeS)
|
288/4, 217-2/4
|
2009-08-18 |
|
[ 270 ]
|
Report of activities of the Correspondence Group on AMS(R)S methodologies to Working Party 4C
|
Chairman, Corresp. Group on AMS(R)S methodologies
|
|
2009-08-10 |
|
[ 269 ]
|
Proposed modifications to the preliminary draft new Recommendation ITU-R M.[MOBDIS] - Use of mobile-satellite service (MSS) in disaster response and relief
|
PT. Asia Cellular Satellite (ACeS)
|
286/4, 227/4
|
2009-08-06 |
|
[ 268 ]
|
Liaison statement to ITU-R Working Party 4C - Information on standards related to the satellite component of IMT
|
ETSI
|
|
2009-07-30 |
|
[ 267 ]
|
Liaison statement to Working Party 4C - Status of terrestrial and satellite components of IMT
|
WP 5D
|
|
2009-07-20 |
|
[ 266 ]
|
Liaison statement to ITU-R WP 4C, ITU-T SG 13 - The update of ITU handbook supplement on migration to IMT-2000
|
WP 5D
|
|
2009-07-03 |
|
[ 265 ]
|
Summary notes on the BR workshop on the efficient use of the spectrum/orbit resource (Geneva, Switzerland, 6 May 2009)
|
Director, BR
|
|
2009-06-23 |
|
[ 264 ]
|
Liaison statement to Working Parties 1A, 4A, 4C, 5A, 5B, 5C, 5D, 6A, 7C, 7D and Joint Task Group 5-6 - Development of a Handbook on propagation information for the prediction of interference and coordination distance
|
WP 3M
|
|
2009-06-18 |
|
[ 263 ]
|
Reply liaison statement to ITU-R Working Party 4C - Related to WRC-11 Agenda item 1.4 Resolution 420 (WRC-07)
|
WP 5B
|
|
2009-06-08 |
|
[ 262 ]
|
Liaison statement to ITU-R Working Party 4C related to WRC-11 Agenda item 1.4 Resolution 417 (Rev.WRC-07)
|
WP 5B
|
|
2009-06-08 |
|
[ 261 ]
|
Liaison statement to Working Party 4C - WRC-11 Agenda item 1.25
|
WP 5C
|
|
2009-05-29 |
|
[ 260 ]
|
Liaison statement to Working Party 4C - WRC-11 Agenda item 1.18
|
WP 5C
|
|
2009-05-29 |
|
[ 259 ]
|
Liaison statement to Working Parties 6A, 6B and 6C (copy to Working Parties 4A, 4C, 5A, 7B and 7D for information) - Harmonization of spectrum for use by terrestrial electronic news gathering systems
|
WP 5C
|
|
2009-05-29 |
|
[ 258 ]
|
Reply liaison statement to ITU-R Working Party 4C related to WRC-11 Agenda item 1.25
|
WP 5B
|
|
2009-05-29 |
|
[ 257 ]
|
Liaison statement to Working Party 4C - Information for studies related to WRC-11 Agenda item 1.25
|
WP 4A
|
|
2009-05-28 |
|
[ 256 ]
|
Liaison statement to Working Party 4C - Preliminary draft revision of Recommendation ITU-R S.1001-1 - Use of systems in the fixed-satellite service in the event of natural disasters and similar emergencies for warning and relief operations
|
WP 4A
|
|
2009-05-28 |
|
[ 255 ]
|
Liaison statement to Working Party 4C - WRC-11 Agenda item 1.18
|
WP 5A
|
|
2009-05-27 |
|
[ 254 ]
|
Liaison statement to Working Party 4C - WRC-11 Agenda item 1.25
|
WP 5A
|
|
2009-05-27 |
|
[ 253 ]
|
Liaison statement to Working Party 4C - Report on technical characteristics of the terrestrial component of an integrated system operating in the bands 1 525-1 559 MHz and 1 626.5-1 660.5 MHz
|
WP 4B
|
|
2009-05-14 |
|
[ 252 ]
|
Liaison statement to Working Party 5C (copy to WPs 4A, 4C, 5A, 6A, 6C, 7B and 7D for information) - Preliminary draft new Recommendation ITU-R BT.[ENGUSER] - User requirements for electronic news gathering
|
WP 6B
|
|
2009-05-14 |
|
[ 251 ]
|
Liaison statement to Working Party 5C - Progress on WRC-11 Agenda item 1.5 - Harmonization of spectrum for use by terrestrial electronic news gathering systems
|
WP 6A
|
|
2009-05-13 |
|
[ 250 ]
|
Liaison statement to ITU-R Working Party 4C
|
ITU-D SG 2
|
|
2009-05-08 |
|
[ 249 ]
|
Liaison statement to relevant ITU-R and ITU-T Study Groups and the ITU Coordination Committee for Vocabulary (CCV) regarding draft list of terminology on emergency telecommunications
|
ITU-D SG2
|
|
2009-05-07 |
|
[ 248 ]
|
Liaison statement to ITU-R Study Group 4 regarding an ITU-D Study Group 2 Report on Satellite Communications for Disaster Management
|
ITU-D SG 2
|
|
2009-04-30 |
|
[ 247 ]
|
Liaison statement to ITU-T SG 13, ITU-R WP 4A and WP 4C - Response to ITU-T SG 13 Liaison on establishment of Focus Group on future networks (FG-FN)
|
WP 4B
|
|
2009-04-28 |
|
[ 246 ]
|
Liaison statement to Coordination Committee for Vocabulary (CCV), Working Parties 4A, 4A, 5A and 5C - Proposed definitions for "integrated MSS system" and "hybrid satellite/terrestrial system"
|
WP 4B
|
|
2009-04-28 |
Results:670 total items. Result page:
Previous -
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10 -
11 -
12 -
13 -
14
- Next
|
Multiple Document Download: Formats and Languages to be included (when available):