Contributions |
|
Number
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 130 ]
|
Liaison statement to Working Party 4A on WRC-12 Agenda item 1.13 (copy to Working Parties 3M, 4B, 5A, 5C, 6A and 7D for information)
|
WP 6B
|
|
2010-05-04 |
|
[ 129 ]
|
Liaison statement to Working Parties 5C and 6B for action and to Working Parties 3M, 4B, 5A, 6A and 7D for information on WRC-12 Agenda item 1.13
|
WP 4A
|
|
2010-04-14 |
|
[ 128 ]
|
Liaison statement to Study Group 6 and Working Party 6A with copy to Working Party 4B for information - Response to comments on the proposed treatment of Recommendations of former Working Party 6S
|
WP 4A
|
|
2010-04-13 |
|
[ 127 ]
+Ann.1-18 |
Report on the twenty eighth meeting of Working Party 4B (Bangalore, 22-26 March 2010)
|
Chairman, WP 4B
|
|
2010-04-07 |
|
[ 126 ]
|
List of documents issued
|
BR Study Group Department
|
|
2010-03-26 |
|
[ 125 ]
|
Final list of participants (Working Party 4B, Bangalore, India, 22-26 March 2010)
|
Director, BR
|
|
2010-03-26 |
|
[ 124 ]
|
Working document towards a preliminary draft new Recommendation on cross layer based QoS provisioning in IP-based satellite terrestrial networks in the next generation network environment
|
United States of America
|
|
2010-03-15 |
|
[ 123 ]
|
Working document towards a preliminary draft revision of Recommendation ITU-R BO.789-2 - Service for digital sound broadcasting to vehicular portable and fixed receivers for broadcasting-satellite service (sound) in the frequency range 1 400-2 700 MHz
|
France
|
23/6
|
2010-03-15 |
|
[ 122 ]
|
Working document towards a preliminary draft new Recommendation - Impact of adaptive coding and modulation on availability objectives
|
Canada
|
73-2/4
|
2010-03-15 |
|
[ 121 ]
|
Preliminary draft new Recommendation ITU-R S.[MULTI-CARRIER] - Multi-carrier based transmission techniques for satellite systems
|
Canada
|
73-2/4
|
2010-03-15 |
|
[ 120 ]
|
Working document towards a preliminary draft new Report ITU-R M.[IP-MSS] - Quality of service performance of IP packet applications over operating or planned systems in the mobile-satellite service
|
France
|
287/4
|
2010-03-15 |
|
[ 119 ]
|
Preliminary draft new Recommendation ITU-R S.[MULTI-CARRIER] - Multi-carrier based transmission techniques for satellite systems
|
Korea (Republic of)
|
46/4
|
2010-03-05 |
|
[ 118 ]
|
Proposed modification to working document - Terminology used for networks using both satellite and terrestrial links
|
Korea (Republic of)
|
|
2010-03-05 |
|
[ 117 ]
|
Comments on the proposed treatment of recommendations of former Working Party 6S
|
BR Study Group Department
|
|
2010-03-03 |
|
[ 116 ]
|
Emergency and disaster relief telecommunications in Haiti
|
United States of America
|
|
2010-03-01 |
|
[ 115 ]
|
ITU/IDA Workshop on the efficient use of the spectrum/orbit resource (Singapore, 16-17 June 2010)
|
Director, BR
|
|
2010-03-01 |
|
[ 114 ]
|
Liaison statement on draft ITU-T Recommendation G.9971 (Ghntreq) "Requirements of transport functions in IP home network"
|
ITU-T SG 15
|
|
2010-01-26 |
|
[ 113 ]
|
Liaison statement to Working Party 4B - Study Group 4 SNG series of Recommendations
|
WP 6B
|
|
2009-12-08 |
|
[ 112 ]
|
Liaison statement - Response to comments from WP 4B about G.hntreq
|
ITU-T SG 15
|
|
2009-10-27 |
|
[ 111 ]
|
New versions of the Access Network Transport (ANT) Standardization Plan and Work Plan
|
ITU-T SG 15
|
|
2009-10-21 |
|
[ 110 ]
|
ABU views on WRC-12 Agenda items 1.4, 1.13, 1.19, 1.22, 1.25
|
Asia-Pacific Broadcasting Union (ABU)
|
|
2009-09-29 |
|
[ 109 ]
+Ann.1-12 |
Report on the twenty seventh meeting of Working Party 4B - (Geneva, 7 - 14 September 2009)
|
Chairman, WP 4B
|
|
2009-09-14 |
|
[ 108 ]
|
Final List of Participants - Geneva, 7-11 September 2009
|
Director, BR
|
|
2009-09-11 |
|
[ 107 ]
|
Liaison statement to Working Parties 4A and 4B - Draft new Recommendation ITU-R M.[MOBDIS] and draft new Report ITU-R M.[REP-MOBDIS] - Use of mobile-satellite service (MSS) in disater reponse and relief
|
WP 4C
|
|
2009-09-09 |
|
[ 106 ]
|
List of documents issued
|
BR Study Group Department
|
|
2009-09-04 |
|
[ 105 ]
|
Proposed liaison statement to ITU-D Study Group 2 Q.22/2 - Draft List of terminology on emergency telecommunications
|
France
|
|
2009-08-31 |
|
[ 104 ]
|
Proposed liaison statement to Working Party 6B - Study Group 4 SNG series of Recommendations
|
France
|
|
2009-08-31 |
|
[ 103 ]
|
Preliminary draft new Recommendation ITU-R S.[MULTI-CARRIER] - Multi-carrier based transmission techniques for satellite systems
|
Korea (Republic of)
|
46-3/4
|
2009-08-24 |
|
[ 102 ]
|
Draft revision of Recommendation ITU-R S.1521 - Allowable error performance for a hypothetical reference digital path based on synchronous digital hierarchy
|
Korea (Republic of)
|
75-3/4
|
2009-08-24 |
|
[ 101 ]
|
Working document towards preliminary draft new Reports and/or Recommendations on reference network architectures, applications and performance, including QoS, for integrated systems operating within the mobile-satellite service in the 1-3 GHz bands
|
Korea (Republic of)
|
|
2009-08-24 |
|
[ 100 ]
|
Working document towards a preliminary draft new Report ITU-R M.[IP-MSS] - Reference system parameters for IP packet applications in the mobile-satellite service
|
Japan
|
287/4
|
2009-08-24 |
|
[ 99 ]
|
Working document towards a preliminary draft new Report or Recommendation - Impact of adaptive coding and modulation on availability objectives
|
Japan
|
73-2/4
|
2009-08-24 |
|
[ 98 ]
|
Working document towards a preliminary draft new Report on cross-platform model for satellite connection in support of cellular system
|
Japan
|
263-1/4
|
2009-08-24 |
|
[ 97 ]
|
Traffic control system for IP packet applications in satellite services
|
Japan
|
263-1/4
|
2009-08-24 |
|
[ 96 ]
|
Working document towards a preliminary draft new Report on cross layer based QoS provisioning in a satellite-terrestrial network in next generation network environment
|
United States of America
|
263-1/4
|
2009-08-28 |
|
[ 95 ]
|
Proposed modifications to the working document towards a preliminary draft new Recommendation / Report - Multi-carrier based techniques for satellite systems
|
Canada
|
46-3/4
|
2009-08-28 |
|
[ 94 ]
|
Draft list of terminology on emergency telecommunications
|
BR Study Group Department
|
|
2009-08-19 |
|
[ 93 ]
|
Liaison statement ITU-R Working Party 4B - Establishment of Focus Group on Future Networks (FG-FN)
|
Focus Group on Future Networks
|
|
2009-07-28 |
|
[ 92 ]
|
Summary notes on the BR workshop on the efficient use of the spectrum/orbit resource (Geneva, Switzerland, 6 May 2009)
|
Director, BR
|
|
2009-06-23 |
|
[ 91 ]
|
Liaison statement on new versions of the Access Network Transport (ANT) Standardization Plan and Work Plan
|
ITU-T SG 15
|
|
2009-05-20 |
|
[ 90 ]
|
Liaison statement on draft baseline text of G.hntreq "Requirements of transport functions in IP home network"
|
ITU-T SG 15
|
|
2009-05-20 |
|
[ 89 ]
|
Liaison statement to Working Party 4B - Study Group 4 SNG series of Recommendations
|
WP 6B
|
|
2009-05-13 |
|
[ 88 ]
|
Liaison statement to Working Parties 5C and 6B for action and to Working Parties 3M, 4B, 5A, 6A and 7D for information on WRC-11 Agenda item 1.13
|
WP 4A
|
|
2009-05-11 |
|
[ 87 ]
|
Liaison statement to relevant ITU-R and ITU-T Study Groups and the ITU Coordination Committee for Vocabulary (CCV) regarding draft list of terminology on emergency telecommunications
|
ITU-D SG2
|
|
2009-05-07 |
|
[ 86 ]
|
Liaison statement to ITU-R Study Group 4 regarding an ITU-D Study Group 2 Report on Satellite Communications for Disaster Management
|
ITU-D SG 2
|
|
2009-04-30 |
|
[ 85 ]
+Ann.1-18 |
Report on the twenty sixth meeting of Working Party 4B - (Geneva, 22 - 29 April 2009)
|
Chairman, WP 4B
|
|
2009-04-29 |
|
[ 84 ]
|
Final List of Participants - Working Party 4B (Geneva, 22-29 April 2009)
|
Director, BR
|
|
2009-04-29 |
|
[ 83 ]
|
Liaison statement to Working Party 4B - Report on technical characteristics of the terrestrial component of an integrated system operating in the bands 1 525-1 559 MHz and
1 626.5-1 660.5 MHz
|
WP 4C
|
|
2009-04-24 |
|
[ 82 ]
|
List of documents issued
|
BR Study Group Department
|
|
2009-04-21 |
|
[ 81 ]
|
Working document on vehicle gateway platform
|
France
|
|
2009-04-15 |
Results:205 total items. Result page:
Previous -
1 -
2 -
3 -
4 -
5
- Next
|
Multiple Document Download: Formats and Languages to be included (when available):