International Telecommunication Union   ITU
Français  Espańol
 
Site map Contact Us Print version
  Home : ITU-R : WP1A : Contributions  Recently posted -  Search Meeting Documents
   
ITU-R WP1A  C 

ITU-R WP1A

Spectrum engineering techniques

Results:17 total items.
Contributions  [ AI/Question: 221-1/1 ]   Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 360 ]  
 
Comments on the working document towards a preliminary draft modification of Report ITU-R SM.2158 - Impact of power line telecommunication systems on radiocommunication systems operating in the LF, MF, HF and VHF bands below 80 MHz     CBS, Inc.   221-1/1   2011-05-17
[ 359 ]  
 
Working document toward a draft revision of Recommendation ITU-R SM.1879 - The impact of power line high date rate telecommunication systems on radiocommunication systems     CBS, Inc.   221-1/1   2011-05-17
[ 358 ]  
 
Additions to the preliminary draft new Report ITU-R SM.[PLT + 80 MHZ] - Impact of power line telecommunications systems on radiocommunication systems operating in the VHF and UHF bands above 80 MHz     CBS, Inc.   221-1/1   2011-05-17
[ 347 ]  
 
Liaison statement to Working Party 1A - Impact of power line transmissions on the mobile-satellite service and radiodetermination-satellite service below 470 MHz     WP 4C   221-1/1   2011-05-13
[ 301 ]  
 
Liaison statement to the Working Party 1A (copy for information to Working Parties 4C, 5A, 5B, 5C, 6A and ITU-T Study Group 15) - Further work on power line telecomunications     WP 7D   221-1/1   2010-06-17
[ 293 ]  
 
Proposed modifications to Report ITU-R SM.2158 - Characteristics of radio frequency emission from PLT systems     Japan   221-1/1   2010-06-14
[ 292 ]  
 
Proposed modifications to Report ITU-R SM.2158 - Experimental results of a subjective assessment test on HF broadcast reception interfered with by PLT     Japan   221-1/1   2010-06-14
[ 291 ]  
 
Proposed modifications to preliminary draft new Recommendation ITU-R SM.[PLT]     Japan   221-1/1   2010-06-14
[ 286 ]  
 
Support for a Recommendation and Report on power line high data rate telecommunication systems     CBS, Inc.   221-1/1   2010-06-14
[ 259 ]  
 
Liaison statement to Working Party 1A (copy to ITU-R Working Party 5B and ITU-T Study Group 15) - Impact of power line transmissions on the mobile-satellite service and radionavigation-satellite service below 200 MHz     WP 4C   221-1/1   2010-04-30
[ 226 ]  
 
Draft revision to Question ITU-R 221-1/1     North American Broadcasters Association (NABA)   221-1/1   2010-01-20
[ 214 ]  
 
Reply to a liaison statement from Working Party 1A - Further work on PLT     WP 5C   221-1/1   2009-12-08
[ 187 ]  
 
Working document towards a PDNR on "Power line high data rate telecommunications systems"     Brazil (Federative Republic of)   221-1/1   2009-09-08
[ 178 ]  
 
Support for the NABA revisions to the PDNR on power line high data rate telecommunication systems     CBS, Inc.   221-1/1   2009-09-08
[ 104 ]  
 
Support of the NABA studies on PLT emissions at the CRC laboratory     CBS, Inc.   221-1/1   2009-02-11
[ 102 ]  
 
Towards a PDNR on "Power line high data rate telecommunications systems"     World Broadcasting Unions - Technical Committee   221-1/1   2009-02-10
[ 99 ]  
 
Further work on the PDNR "Power line high data rate telecommunications systems"     North American Broadcasters Association (NABA)   221-1/1   2009-02-05
Results:17 total items.
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  ITU-R Web coordinator
Updated : 2024-4-26