International Telecommunication Union   ITU
Français  Espańol
 
Site map Contact Us Print version
  Home : ITU-R : WP1A : Contributions  Recently posted -  Search Meeting Documents
   
ITU-R WP1A  C 

ITU-R WP1A

Spectrum engineering techniques

Results:402 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9  - Next Next
Contributions  Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 77 ]  
 
Liaison statement to Working Party 1A (copy to Working Parties 5A, 5B and 6A for information) - Interference issues from power line telecommunication systems using the electricity supply wiring     WP 5C     2008-10-31
[ 76 ]  
 
Reply Liaison statement to ITU-R Working Party 1A - WRC-11 Agenda item 1.6, Resolution 950 (Rev.WRC-07)     WP 7C and WP 7D     2008-10-30
[ 75 ]  
 
Liaison statement to Working Parties 3J and 3M (copy for information to Working Party 1A) - Atmospheric absorption in the frequency range 1-350 THz (WRC-11 Agenda item 1.6)     WP 7D     2008-10-28
[ 74 ]  
 
Liaison statement to Working Party 1A (copy for information to Working Party 5A) - Information on short-range devices required for WRC-11 Agenda item 1.22     WP 5D     2008-10-24
[ 73 ]  
 
Liaison statement to Working Party 1A - Information on short-range devices required for WRC-11 Agenda item 1.22     WP 4C     2008-10-24
[ 72 ]  
 
Liaison statement to Working Party 1A - Information on satellite networks in the fixed-satellite and broadcasting-satellite services to be used in consideration of WRC-11 Agenda item 1.22     WP 4A     2008-10-24
[ 71 ]  
 
Liaison statement to Working Party 1A (copy to Working Party 4C for information) - Proposed deletion of portions of section 3 of Annex 5 to Recommendation ITU-R SM.1541-2     WP 4A     2008-10-24
[ 70 ]  
 
Liaison statement to Working Party 1A - WRC-11 Agenda item 1.22     WP 7D     2008-10-17
[ 69 ]  
 
Liaison statement to Working Party 1A - Information on short-range devices required for WRC-11 Agenda item 1.22     WP 7C     2008-10-17
[ 68 ]  
 
Liaison statement to Study Groups in ITU and other Groups on progress achieved in the Ad Hoc - Group on Vehicle Gateway Platform (VGP)     ITU-T SG 16     2008-10-09
[ 67 ]  
 
Reply liaison statement to Working Party 1A (and to Working Party 4A for information) - Proposed deletion of portions of section 3 of Annex 5 to Recommendation ITU-R SM.1541-2     WP 4C     2008-10-03
[ 66 ]  
 
Reply to liaison statement to Working Party 1A on information on RFIDS required for WRC-11 agenda item 1.22     ITU-T SG 16     2008-09-15
[ 65 ]  
 
Preliminary WMO position on WRC-11 agenda     WMO     2008-09-12
[ 64 ]  
 
Liaison statement to ITU-R Working Parties 4A, 4C, 5A, 5B, 5C, 6A, 7B, 7C and 7D (copy for information to ITU-R WPs 1A, 3J and 3K) - On the study of software-defined radio and cognitive radio systems     WP 1B     2008-07-23
[ 63 ]  
 
Reply to liaison statement from Working Party 6A - Requirements for protection against interference generated by short range devices (SRD) operating in the terrestrial broadcast bands (copy for information to Working Party 1A)     WP 1B     2008-07-23
[ 62 ]  
+Ann.1-19 
Report of the meeting of Working Party 1A, Geneva 18-24 June 2008     Acting Chairman, WP 1A     2008-06-25
[ 61 ]  
 
Final List of Participants (Geneva, 18-24 June 2008)     Director, BR     2008-06-24
[ 60 ]  
 
Liaison statement to Working Parties 1A and 1C - Impact of power line telecommunications systems on radiocommunication systems operating in the HF band     WP 3L     2008-06-18
[ 59 ]  
 
List of documents issued     BR Study Group Department     2008-06-17
[ 58 ]  
 
Liaison statement to Study Group 1 - Coordination of studies into PLT systems     SG 6     2008-06-16
[ 57 ]  
 
Impact of power line telecommunications (PLT) systems on radiocommunication systems operating in the LF, MF, HF and VHF bands below 80 MHz     International Amateur Radio Union (IARU)   221/1   2008-06-11
[ 56 ]  
 
Implementation of Resolution ITU-R 5-5 (Rev. 2007)     Syrian Arab Republic     2008-06-11
[ 55 ]  
 
Working document toward a preliminary draft new Recommendation - Power line high data rate telecommunications systems     United Kingdom of Great Britain and Northern Ireland     2008-06-11
[ 54 ]  
 
CISPR22 - Limits and method of measurement of broadband telecommunication equipment over power lines     Japan     2008-06-11
[ 53 ]  
 
Comments on the working document toward a preliminary draft new report - Power line telecommunications systems (Doc. 1A/163, Annex 6) - Addition of information on PLT characteristics     Japan     2008-06-11
[ 52 ]  
 
Comments on the working document toward a preliminary draft new report - Power line telecommunications systems (Doc. 1A/163, Annex 6) - Basis of the acceptable interference level     Japan     2008-06-11
[ 51 ]  
 
Proposed revision of Recommendation ITU-R SM.1138-1 - Determination of necessary bandwidths including examples for their calculation and associated examples for the designation of emission     Korea (Republic of)     2008-06-11
[ 50 ]  
 
Proposed modification of Recommendation ITU-R SM.329-10 - Unwanted emissions in the spurious domain - Semi anechoic room     Korea (Republic of)   211/1   2008-06-11
[ 49 ]  
 
Proposed modification of Recommendation ITU-R SM.329-10 - Unwanted emissions in the spurious domain - emission limits of ISM equipment     Korea (Republic of)   211/1   2008-06-11
[ 48 ]  
 
Liaison reply to Working Party 4C (copied to Working Parties 3J, 3K, 3L, 3M, 7A, 7B, 7C, 7D, 4A, 4B, 6A, 6B, 6C, 1A, 1B, 1C, 5A, 5B, 5C and 5D for information) - Studies related to WRC-11 Agenda item 1.25     WP 6A     2008-06-11
[ 47 ]  
 
Proposed revision of preliminary draft new Question ITU-R [INTER_MODEL] - Interference models taking into account interference from both radio and non-radio equipment or installations     Korea (Republic of)     2008-06-11
[ 46 ]  
 
Liaison statement to Working Party 1A - Requirements for protection against interference generated by short range diveces (SRD) operating in the rerrestrial broadcast bands     WP 6A     2008-06-11
[ 45 ]  
 
Liaison statement to Working Party 1A - Interference protection requirements from power line telecommunication systems on radiocommunication systems operating in the LF, MF, HF, and VHF bands below 80 MHz     WP 6A     2008-06-11
[ 44 ]  
 
Preliminary draft new Question ITU-R [RFID] - Radio frequency identification (RFID)     CBS, Inc.     2008-06-10
[ 43 ]  
 
Further work on the PDNR "Power line high data rate telecommunications systems"     CBS, Inc.   221/1   2008-06-10
[ 42 ]  
 
Regulation for the operation of industrial, scientific and medical devices (ISM) in Canada - For information     Canada     2008-06-10
[ 41 ]  
 
Preliminary draft revision to Recommendation ITU-R SM.1541-2 - Proposed modifications to Annex 5 to this Recommendation     Canada     2008-06-10
[ 40 ]  
 
Questions assigned to Study Group 1     Canada     2008-06-10
[ 39 ]  
 
Short range devices and spectrum occupancy - For information     Canada     2008-06-10
[ 38 ]  
 
Working document towards a preliminary draft new report - Impact of power line telecommunications systems on radiocommunication systems operating in the LF, MF, HF and VHF bands below 80 MHz - (Question ITU-R 221/1)     Chairman, Corresp. Group PLT   221/1   2008-06-11
[ 37 ]  
 
The effect of emissions from short-range devices on radiocommunication services     North American Broadcasters Association     2008-06-09
[ 36 ]  
 
Further additions to the working document towards a preliminary draft new Report - Impact of power line telecommunications systems on radiocommunication systems operating in the LF, MF, HF and VHF bands below 80 MHz     North American Broadcasters Association   221/1   2008-06-09
[ 35 ]  
 
Additions to the working document towards a preliminary draft new Report - Impact of power line telecommunications systems on radiocommunication systems operating in the LF, MF, HF and VHF bands below 80 MHz     North American Broadcasters Association   221/1   2008-06-09
[ 34 ]  
 
Further work on the PDNR "Power line high data rate telecommunications systems"     North American Broadcasters Association   221/1   2008-06-09
[ 33 ]  
 
Regulation of broadband PLT systems in Brazil     Brazil (Federative Republic of)   221/1   2008-06-05
[ 32 ]  
 
Radiointerference tests from broadband power line communication systems     Brazil (Federative Republic of)   221/1   2008-06-05
[ 31 ]  
 
CISPR22 - limits and method of measurement of broadband telecommunication equipment over power lines     Germany (Federal Republic of)     2008-06-05
[ 30 ]  
 
WRC-07 Resolutions and Recommendations related to the work of Study Group 1     Chairman, SG 1     2008-05-15
[ 29 ]  
 
Provisional attribution of the Study Group 1 texts to the Working Parties     Chairman, SG 1     2008-05-15
[ 28 ]  
 
Liaison statement to Study Groups in ITU and other Groups on initiation of a new question on vehicle gateway platform     ITU-T SG 16     2008-05-14
Results:402 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  ITU-R Web coordinator
Updated : 2013-11-05