International Telecommunication Union   ITU
Français  Espańol
 
Site map Contact Us Print version
  Home : ITU-R : WP1A : Contributions  Recently posted -  Search Meeting Documents
   
ITU-R WP1A  C 

ITU-R WP1A

Spectrum engineering techniques

Results:402 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16 - 17  - Next Next
Contributions  Documents / Contributions
 
Number 
Received Source Title Questions
[ 202 ]  
 
2009-09-16 WPs 7C & 7D   Liaison statement - WRC-12 Agenda item 1.6, Resolution 950 (Rev.WRC-07)     N/A  
[ 201 ]  
 
2009-09-15 BR Study Group Department   List of documents issued     N/A  
[ 200 ]  
 
2009-09-10 WP 7D   Liaison statement to Working Party 1A (copy to Working Party 6A for information) - Measurement results of leaked emissions from access power line telecommunication (PLT) system in the HF and the UHF bands     221/1  
[ 199 ]  
 
2009-09-09 France , Germany (Federal Republic of) , United Kingdom of Great Britain and Northern Ireland   Compatibility studies relevant to the work related to WRC-12 Agenda item 1.22     N/A  
[ 198 ]  
(Rev.1) 
2009-09-09 Japan   Comments on the Liaison statement from WP 6A - Impact of power line telecommunication systems on radiocommunication systems operating in the LF, MF, HF and VHF bands below 80 MHz     N/A  
[ 197 ]  
 
2009-09-09 CBS, Inc.   Support of the NABA studies on PLT emissions at the CRC Laboratory     221/1  
[ 196 ]  
 
2009-09-09 Japan   Results on calculation of the cumulative HF sky-wave interference from power line telecommunication systems     N/A  
[ 195 ]  
 
2009-09-09 British Broadcasting Corporation(BBC)   Further work on the PDNR "Power line high data rate telecommunications systems"     221/1  
[ 194 ]  
 
2009-09-09 European Broadcasting Union (EBU)   Support to contributions from Broadcasting Organizations     N/A  
[ 193 ]  
 
2009-09-08 Canada   Working document toward a preliminary draft new Recommendation ITU-R SM.[RFID HARMONIZATION]     N/A  
[ 192 ]  
 
2009-09-08 Canada   Revision to the working document towards draft CPM text on WRC-12 Agenda item 1.22     N/A  
[ 191 ]  
 
2009-09-09 Syrian Arab Republic   WRC-12 Agenda item 1.22     N/A  
[ 190 ]  
 
2009-09-09 Korea (Republic of)   Preliminary draft revision of Recommendation ITU-R SM.329-10 - Unwanted emissions in the spurious domain     N/A  
[ 189 ]  
+Corr.1 
2009-09-09 Korea (Republic of)   Impact of ISM equipment on radiocommunication services     N/A  
[ 188 ]  
 
2009-09-09 Korea (Republic of)   Draft CPM text for WRC-12 Agenda item 1.22 and working document towards advancing the work     N/A  
[ 187 ]  
 
2009-09-08 Brazil (Federative Republic of)   Working document towards a PDNR on "Power line high data rate telecommunications systems"     221-1/1  
[ 186 ]  
 
2009-09-08 United States of America   Analysis of aggreate interference potential form access (outdoor) power-line telecommunications deployment on a national level     N/A  
[ 185 ]  
 
2009-09-08 United States of America   Proposal to modify section 6.3 of the preliminary draft new Report on impact of power line telecommunication systems on radiocommunication systems operating in the LF, MF, HF and VHF bands below 80 MHz     N/A  
[ 184 ]  
 
2009-09-08 United States of America   Proposal to modify Section 5.5 of the preliminary draft new Report on impact of power line telecommunications systems on radiocommunications systems operating in the LF, MF, HF, and VHF bands below 80 MHz     N/A  
[ 183 ]  
 
2009-09-08 United States of America   Comments on and corrections to the working document towards a preliminary draft new Report regarding Question ITU-R 210-2/1 power transmission via radio frequency beam     N/A  
[ 182 ]  
 
2009-09-08 Scientific Committee on Frequency Allocations for Radio Astronomy and Space Science   New elements to the working document towards a PDN Report on the impact of PLT - Distance dependence of the leaked electric field caused by in-house PLT systems     221/1  
[ 181 ]  
 
2009-09-08 CBS, Inc.   Broadband over power (BPL/PLT) studies and testing     N/A  
[ 180 ]  
 
2009-09-08 CBS, Inc.   Working document towards draft CPM text on WRC-12 Agenda item 1.22     N/A  
[ 179 ]  
 
2009-09-08 CBS, Inc.   Reply liaison statement from Working Party 6A - Impact of power line telecommunication systems on radiocommunication systems operating in the LF, MF, HF and VHF bands below 80 MHz     N/A  
[ 178 ]  
 
2009-09-08 CBS, Inc.   Support for the NABA revisions to the PDNR on power line high data rate telecommunication systems     221-1/1  
Results:402 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16 - 17  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

 

Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  ITU-R Web coordinator
Updated : 2013-11-05