Contributions |
|
Number
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 123 ]
+Ann.1 |
Executive Report of the Working Party 1C meeting (Amsterdam, 20-24 September 2010)
|
Chairman, WP 1C
|
|
2010-09-23 |
|
[ 122 ]
|
Proposal by Syria
|
Syrian Arab Republic
|
|
2010-09-20 |
|
[ 121 ]
|
Corrigendum to the table 8 in Appendix 8 to Annex 2 to draft modification of ITU-R Report SM.2153 - "Technical and operating parameters and spectrum use for short-range radiocommunication devices"
|
Ukraine
|
|
2010-09-20 |
|
[ 120 ]
|
Support for the Rapporteur Group in high data-rate power line telecommunications
|
CBS, Inc.
|
|
2010-09-18 |
|
[ 119 ]
|
Future studies on Recommendation ITU-T G.9960 - Rapporteur Group on hig data-rate power line telecommunications
|
World Broadcasting Unions - Technical Committee
|
|
2010-09-16 |
|
[ 118 ]
|
Future studies on Recommendation ITU-T G.9960 - Rapporteur Group on high data-rate power line telecommunications
|
North American Broadcast Association (NABA)
|
|
2010-09-16 |
|
[ 117 ]
|
Rapporteur's Report on review on ITU-R Recommendations, Reports and Questions assigned to the Study Group 1
|
Korea (Republic of)
|
|
2010-09-15 |
|
[ 116 ]
|
Information about progress status on vehicle gateway platform (VGP) in ITU-T Study Group 16
|
Korea (Republic of)
|
|
2010-09-27 |
|
[ 115 ]
|
Proposal for Mr. Chang Ruoting to serve as Vice-Chairman of Study Group 1
|
Chairman, SG 1
|
|
2010-09-14 |
|
[ 114 ]
|
Power line high data rate telecommunication systems
|
WP 1A Rapporteur Group on PLT
|
|
2010-09-08 |
|
[ 113 ]
|
Executive Report of the meetings of Working Party 1A (Geneva, 1-10 February and 21-28 June 2010)
|
Chairman, WP 1A
|
|
2010-09-07 |
|
[ 112 ]
|
Executive Report of the meetings of Working Party 1B (Geneva, 1-10 February and 21-28 June 2010)
|
Chairman, WP 1B
|
|
2010-08-31 |
|
[ 111 ]
|
Cooperation with ITU-T on revision of Recommendation ITU-T G.9960
|
Italy
|
|
2010-08-11 |
|
[ 110 ]
|
Comments on the DNR "The impact of power line high data rate telecommunication systems on radiocommunication systems below 30 MHz" (Doc. 1/102) and related spectrum issues
|
Italy
|
|
2010-08-11 |
|
[ 109 ]
|
Draft new Report ITU-R SM.[ISM] - Impact of ISM equipment on radiocommunication services
|
WP 1A
|
|
2010-07-12 |
|
[ 108 ]
|
Draft revision of Report ITU-R SM.2012-2 - Economic aspects of spectrum management
|
WP 1B
|
|
2010-07-09 |
|
[ 107 ]
|
Draft modification of Report ITU-R SM.2093 - Guidance on the regulatory framework for national spectrum management
|
WP 1B
|
|
2010-07-08 |
|
[ 106 ]
|
Draft modification of Report ITU-R SM.2153 - Technical and operating parameters and spectrum use for short-range radiocommunication devices
|
WP 1B
|
|
2010-07-08 |
|
[ 105 ]
+Corr.1 |
Draft modification of Report ITU-R SM.2158 - Impact of power line telecommunication systems on radiocommunication systems operating in the LF, MF, HF and VHF bands below 80 MHz
|
WP 1A
|
221/1
|
2010-07-07 |
|
[ 104 ]
|
Draft new Question ITU-R [PWRGRD]/1 on impact on Radiocommunication systems from wireless and wired data transmission technologies used for the support of power grid management systems
|
WP 1A
|
|
2010-07-02 |
|
[ 103 ]
|
Report of the Joint meeting of Working Parties 1A and 1B (Geneva, 21 June 2010)
|
Chairman, SG 1
|
|
2010-07-01 |
|
[ 102 ]
|
Draft new Recommendation ITU-R SM.[PLT] - Power line high data rate telecommunication systems
|
WP 1A
|
|
2010-07-08 |
|
[ 101 ]
(Rev.1) |
Draft revision of Annex 5 to Recommendation ITU-R SM.1541-2 - Unwanted emissions in the out-of-band domain
|
WP 1A
|
|
2010-06-25 |
|
[ 100 ]
|
Liaison statement - New versions of the access network transport (ANT) standardization overview and work plan
|
ITU-T SG 15
|
|
2010-06-22 |
|
[ 99 ]
|
Liaison statement - EMC guidelines for G.9960
|
ITU-T SG 15
|
4/15
|
2010-06-23 |
|
[ 98 ]
|
Liaison statement to Study Group 1 and Working Party 1B - Issues on terminology raised at the CCV/1-10 meeting of the Coordination Committee for Vocabulary (CCV)
|
Chairman, CCV
|
|
2010-05-13 |
|
[ 97 ]
|
Liaison statement to involve the ITU-R Sector in the JCA-NID to address coordination of NID/USN/RFID standardization
|
TSAG Chairman
|
|
2010-03-01 |
|
[ 96 ]
|
Draft modification of Report ITU-R SM.2158 - Draft modification of section A.1.2.2 of Report ITU-R SM.2158, on impact of power line telecommunications systems on radiocommunication systems operating in the LF, MF, HF and VHF bands below 80 MHz
|
WP 1A
|
221/1
|
2010-02-18 |
|
[ 95 ]
(Rev.1) |
Draft modification of Recommendation ITU-R SM.329-10 - Unwanted emissions in the spurious domain
|
WP 1A
|
|
2010-02-18 |
|
[ 94 ]
|
Draft editorial modification of Recommendation ITU-R SM.1009-1
|
WP 1A
|
|
2010-02-18 |
|
[ 93 ]
|
Draft revision of Question ITU-R 221-1/1 - Compatibility between radiocommunications systems and high data rate telecommunication systems using wired electrical power supply
|
WP 1A
|
221/1
|
2010-02-18 |
|
[ 92 ]
|
Invitation to contribute to CWG-WCIT12
|
Director, BR
|
|
2010-02-16 |
|
[ 91 ]
|
ITU-R Study Group 5 Recommendation to be brought to the attention of Study Group 1
|
BR Study Group Department
|
|
2010-01-11 |
|
[ 90 ]
|
Liaison statement to ITU-T Study Group 15 (copied to ITU-R Study Group 1 for information) - ITU-T Recommendation G.9960
|
SG 5
|
|
2009-12-14 |
|
[ 89 ]
|
Liaison statement from ITU-R Study Group 5 to ITU-T Study Group 5 (copy to ITU-R Study Group 1 for information) - Proposals for new K-series Recommendations
|
SG 5
|
|
2009-12-14 |
|
[ 88 ]
|
ITU-R Study Group 5 Recommendation to be brought to the attention of Study Group 1
|
BR Study Group Department
|
|
2009-11-23 |
|
[ 87 ]
|
ITU-R Study Group 3 Question to be brought to the attention of ITU-R Study Group 1
|
BR Study Group Department
|
|
2009-11-20 |
|
[ 86 ]
|
Liaison statement from Working Party 6A to ITU-T Study Group 15 (copy to ITU-R Study Groups 1 and 6 for information)
|
WP 6A
|
|
2009-11-13 |
|
[ 85 ]
+Ann.03(Rev.1) |
Summary Record of the meeting of Radiocommunication Study Group 1 (Geneva, 24 September 2009)
|
SG 1
|
|
2009-10-05 |
|
[ 84 ]
|
Final List of Participants - Study Group 1 (24-25 September 2009)
|
Director, BR
|
|
2009-09-25 |
|
[ 83 ]
|
List of documents issued
|
BR Study Group Department
|
|
2009-09-23 |
|
[ 82 ]
|
Executive Report of the meeting of Working Party 1C (Geneva, 16 to 22 September 2009)
|
Chairman, WP 1C
|
|
2009-09-23 |
|
[ 81 ]
|
Executive Report of the meetings of Working Party 1B (Seoul, 25 February to 4 March and Geneva, 17 to 23 September 2009)
|
Chairman, WP 1B
|
|
2009-09-23 |
|
[ 80 ]
|
Executive Report of the meetings of Working Party 1A (Seoul, 25 February to 4 March and Geneva, 16 to 22 September 2009)
|
Chairman, WP 1A
|
|
2009-09-23 |
|
[ 79 ]
|
Draft liaison statement to Coordination Committee for Vocabulary (CCV) - Proposed definitions for "Software Defined Radio (SDR)" and "cognitive Radio System (CRS)"
|
SG 1
|
|
2009-09-23 |
|
[ 78 ]
|
Draft reply liaison statement to ITU-D SG 2 - Resolution 9 (Rev.Doha, 2006), draft guidelines for the establishment of a system of fees
|
SG 1
|
|
2009-09-23 |
|
[ 77 ]
|
Draft new Report ITU-R SM.[SRD] - Technical and operating parameters and spectrum use for short-range radiocommunication devices
|
WP 1B
|
|
2009-09-23 |
|
[ 76 ]
|
Preliminary review of ITU-R Questions assigned to Study Group 1
|
Rapp. Group on ITU-R Questions
|
|
2009-09-23 |
|
[ 74 ]
|
Draft new Report ITU-R SM.[PLT-MEASUREMENT] - Measurement methods for power line high data rate telecommunication systems
|
WP 1C
|
|
2009-09-23 |
|
[ 73 ]
|
Draft new Report ITU-R SM.[INSP] - The role of spectrum monitoring in support of inspections
|
WP 1C
|
|
2009-09-23 |
Results:197 total items. Result page:
Previous -
1 -
2 -
3 -
4
- Next
|
Multiple Document Download: Formats and Languages to be included (when available):