Contributions  |
|
Number
|
Received
|
Source
|
Title
|
Questions
|
|
[ 408 ]
|
2007-05-24 |
Russian Federation
|
On the allocation of the frequency band 3 400-4 200 MHz for operation of IMT-2000 systems
|
N/A
|
|
[ 407 ]
|
2007-05-25 |
Director, BR
|
Possible calculation of reference situation by the Bureau during the conference in response to changes to technical parameters and criteria in Appendix 30B
|
N/A
|
|
[ 406 ]
|
2007-05-25 |
Director, BR
|
Calculation of mutual interference among assignments in the list which are derived from Part B of the Plan ("existing system") in Appendix 30B
|
N/A
|
|
[ 405 ]
|
2007-05-21 |
Iran (Islamic Republic of)
|
Document on WRC-07 Agenda item 1.10 (for information only) - Approach 3, hybrid of sequential and non sequential approaches
|
N/A
|
|
[ 404 ]
|
2007-05-21 |
ITU-T Study Group 13
|
Liaison statement to Working Party 4A - NGN/satellite Workshop and meeting of the ICG-SAT
|
N/A
|
|
[ 403 ]
|
2007-05-21 |
WP 9B and 9D
|
Liaison statement to ITU-R Working Party 1B on the study of software defined radio and cognitive radio systems in Working Party 1B
|
N/A
|
|
[ 402 ]
|
2007-05-16 |
Asia Satellite Telecommunications Co. Ltd
|
Impact of IMT transmissions in the 4 GHz range on FSS reception without frequency overlap
|
N/A
|
|
[ 401 ]
|
2007-05-08 |
WP 6S
|
Reply to Liaison statement from 1B on the study of software defined radio and cognitive radio systems
|
N/A
|
|
[ 400 ]
|
2007-04-18 |
BR Study Group Department
|
ITU-R Study Group 8 Question to be brought to the attention of Working Parties 4A, 7B, 7C and 9D
|
N/A
|
|
[ 399 ]
|
2007-03-14 |
BR Study Group Department
|
Recommendation to be brought to the attention of Working Parties 4A, 6S, 7B, 8D and 4-9S
|
N/A
|
|
[ 398 ]
|
2007-02-16 |
WP 8F
|
Liaison statement to ITU-R Working Party 1B on the study of software defined radio and cognitive radio systems in Working Party 1B - (Copy for information to ITU-R WPs 1A, 4A, 4-9S, 6E, 6S, 7B, 7C, 7D, 8A, 8B, 8D, 9B and 9D)
|
N/A
|
|
[ 397 ]
|
2007-02-16 |
WP 7B
|
Liaison statement to Working Party 4A and Working Party 4B for information - Impact of Recommendation ITU-R S.1432 on the use of the band 18.1-18.3 GHz
|
N/A
|
|
[ 396 ]
|
2007-02-16 |
WP 7B
|
Draft liaison statement to Working Party 4A - PDNR on frequency sharing between Space VLBI and Lunar systems of the SRS and FSS systems in the 37.5-38 GHz band
|
211/7
|
|
[ 395 ]
|
2007-01-11 |
Coordination Committee for Vocabulary (CCV)
|
Liaison statement to Radiocommunication Study Groups and Working Parties - Terminology database
|
N/A
|
|
[ 394 ]
|
2006-11-24 |
WP 8B
|
Liaison statement to WP 4A - Coordination distances for cases involving ground-based earth stations and aircraft terrestrial stations
|
N/A
|
|
[ 393 ]
|
2006-11-14 |
WP 1A
|
Liaison statement to WP 4A - FSS OoB domain limit defined in Annex 5 of Recommendation ITU-R SM.1541
|
N/A
|
|
[ 392 ]
|
2006-11-09 |
WP 1B
|
Liaison statement to WPs 1A, 4A, 4-9S, 6E, 6S, 7B, 7C, 7D, 8A, 8B, 8D, 8F, 9B and 9D - The study of software defined radio and cognitive radio systems in Working Party 1B
|
N/A
|
|
[ 391 ]
|
2006-11-06 |
WP 8A
|
Liaison statement to Working Party 7C - For information to Working Parties 4A, 6J and 9D - Results of the studies relating to Agenda item 1.2 and draft CPM Report text
|
N/A
|
|
[ 390 ]
|
2006-10-30 |
BR Study Group Department
|
Recommendation to be brought to the attention of Working Parties 1A, 4A, 6S and 8D
|
N/A
|
|
[ 389 ]
+Ann.1-19 |
2006-10-06 |
Chairman, WP 4A
|
Chairman's report - Meeting 4 - 13 September 2006
|
N/A
|
|
[ 388 ]
+Corr.1 |
2006-10-06 |
WP 3M
|
Liaison statement to Working Parties 1A, 1C, 4A, 4-9S, 6E, 7B, 7C, 7D, 8A, 8B, 8F, 9A and 9D - Spreadsheet implementation of the clear-air portion of Recommendation ITU-R P.452-12
|
N/A
|
|
[ 387 ]
|
2006-09-25 |
BR Study Group Department
|
Recommendation to be brought to the attention of Working Party 4A
|
N/A
|
|
[ 386 ]
|
2006-09-25 |
BR, Study Group Department
|
Recommendation to be brought to the attention of Working Parties 4A, 6E, 7C, 8A and 8F
|
N/A
|
|
[ 385 ]
|
2006-09-12 |
Director, BR
|
Final List of Participants - Working Party 4A (Geneva, 4-13 September 2006)
|
N/A
|
|
[ 384 ]
|
2006-09-05 |
WP 7B
|
Liaison statement concerning the proposed preliminary draft new Reports ITU-R SA.[SVLBI FSS 38 GHz] and SA.[LUNAR FSS 38 GHz] for frequency sharing between SRS and FSS systems in the 37.5-38 GHz band
|
211/7, 202/7
|
Results:433 total items. Result page:
Previous -
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10 -
11 -
12 -
13 -
14 -
15 -
16 -
17 -
18
- Next

|
Multiple Document Download: Formats and Languages to be included (when available):