International Telecommunication Union   ITU
Français  Espańol
 
Site map Contact Us Print version
  Home : ITU-R : WP1B : Contributions  Recently posted -  Search Meeting Documents
   
ITU-R WP1B  C 

ITU-R WP1B

Spectrum management methodologies

Results:136 total items.
Result page:  Previous -  1 - 2 - 3
Contributions  Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 36 ]  
 
Liaison from ITU-D Study Group 1 on Question 17/1     ITU-D SG 1     2004-09-21
[ 35 ]  
 
Liaison from ITU-D Study Group 1 - Question 18/1     ITU-D SG 1     2004-09-21
[ 34 ]  
+Add.1 
Proposed revision of Recommendation ITU-R SM.1538-1 - Technical and operating parameters and spectrum requirements for short-range radiocommunication devices     Germany (Federal Republic of)   213/1   2004-09-20
[ 33 ]  
 
Analysis of the replies from ITU-R Working Parties to Liaison statement sent by WP 1B related to preliminary draft new Recommendation ITU-R SM.[...] - Criteria for the evaluation of interference between Radiocommunication networks operating in a shared frequency band     Russian Federation   209/1   2004-09-16
[ 32 ]  
 
Preliminary draft new Recommendation ITU-R SM.[...] - Index for the evaluation of the effect of interference between radiocommunication networks operating in a shared frequency band     Russian Federation     2004-09-16
[ 31 ]  
 
Draft revision of Recommendation ITU-R SM.1046-1 - Definition of spectrum use and efficiency of a radio system     Russian Federation     2004-06-23
[ 30 ]  
 
Liaison statement to ITU-D Study Group 1 - Comments on the draft Report on satellite regulation in developing countries     WP 4B     2004-05-14
[ 29 ]  
 
Reply to the liaison statement from WP 1B on the application of a uniform criterion for evaluating interference between radiocommunication systems, operating in shared frequency bands     WP 6E     2004-05-13
[ 28 ]  
 
Liaison statement to Working Party 1B - Comments regarding PDNR SM.[REML]     WP 4A     2004-05-05
[ 27 ]  
 
Reply to the liaison statement from WP 1B on the application of a uniform criterion for evaluating interference between radiocommunication systems, operating in shared frequency bands     WP 6S     2004-05-04
[ 26 ]  
 
Liaison statement to ITU-R Working Party 1B and Working Parties 4A and 4B of Study Group 4     ITU-D Study Group 1     2004-04-07
[ 25 ]  
 
Liaison statement to WP 1B - Use of the REML (Relative Energy Margin Loss) interference metric in the radio astronomy service     WP 7D     2004-03-31
[ 24 ]  
 
Liaison statement to Working Party 1B - Response to WP 1B liaison statement on the application of a uniform criterion of evaluating interference between Radiocommunication networks     WP 7C     2004-03-26
[ 23 ]  
 
Liaison statement to Working Party 1B - Response to Working Party 1B liaison statement on the application of a uniform criterion of evaluating interference between radicommunication networks     WP 7B     2004-03-22
[ 22 ]  
 
Response to the liaison statement from Working Party 1B concerning criteria for evaluating interference between radiocommunication networks operating in shared frequency bands     WP 8F     2004-03-17
[ 21 ]  
 
Liaison statement to Working Party 1B - Application of a uniform criterion of evaluating interference between radiocommunication networks     WPs 9A and 9D     2004-02-27
[ 20 ]  
 
Liaison statement to Working Party 1B - The application of a uniform criterion of evaluating interference between radio communication networks     WP 4-9S     2004-02-18
[ 19 ]  
 
Response to the liaison statement from WP 1B - Criteria for the evaluation of interference between radiocommunication networks operating in a shared frequency band     WP 8D     2004-01-29
[ 18 ]  
 
Response to the Liaison statement from Working Party 1B concerning criteria for evaluation interference between radiocommunication networks operating in shared frequency bands     WP 8B     2004-01-15
[ 17 ]  
 
Liaison statement from Working Party 8A - Criteria for the evaluation of interference between radiocommunication networks operating in a shared frequency band     WP 8A     2003-12-15
[ 16 ]  
+Ann.1-8 
Report on the meeting of Working Party 1B - Geneva, 30 October to 5 November 2003     Chairman, WP 1B     2003-11-11
[ 15 ]  
 
Final List of Participants - Working Party 1B     Director, BR     2003-11-04
[ 14 ]  
 
List of documents issued     BR Study Group Department     2003-10-29
[ 13 ]  
 
Contribution to promote a Report on guidance on the regulatory framework for national spectrum management in answer to Question ITU-R 223/1     France   223/1   2003-10-29
[ 12 ]  
 
Proposed work programme for Working Party 1B     Chairman, WP 1B     2003-10-28
[ 11 ]  
 
Report of the Chairman of Study Group 1, its Working Parties and Task Group     Chairman, SG 1     2003-10-24
[ 10 ]  
 
Preliminary draft revision of Recommendation ITU-R SM.1538 - Technical parameters and spectrum requirements for short-range radiocommunication devices     Korea (Republic of)   213/1   2003-10-23
[ 9 ]  
 
Draft working document towards a preliminary draft new Report on Technical convergence with respect to terrestrial fixed, mobile, and broadcasting interactive multimedia applications     Sweden   224/1   2003-10-24
[ 8 ]  
 
Improving the international spectrum regulatory framework     United States of America     2003-10-23
[ 7 ]  
 
Draft new Question - Improving the international spectrum regulatory framework     United States of America     2003-10-21
[ 6 ]  
 
Contribution to carry on the work towards a preliminary draft new Recommendation on guidance on the regulatory framework for national spectrum management in answer to Question ITU-R 223/1     India (Republic of)   223/1   2003-10-20
[ 5 ]  
 
Draft Revision of Question ITU-R 209/1 - Parameters of radio systems and equipment required for spectrum management and the efficient use of the radio spectrum     Russian Federation   209/1   2003-10-15
[ 4 ]  
 
Working materials towards Draft New Recommendation ITU-R SM.[...] - Index for the evaluation of harmful effect of interference between radio communication networks operating in a shared frequency band     Russian Federation     2003-10-15
[ 3 ]  
 
Contribution to carry on the work towards a PDNR on guidance on the regulatory framework for national spectrum management in answer to Question ITU-R 223/1     Brazil (Federative Republic of)   223/1   2003-10-08
[ 2 ]  
 
Recommendations brought to the attention of Radiocommunication Study Group 1, its Working Parties or Task Groups     Chairman, SG 1     2003-08-15
[ 1 ]  
 
Documents to be carried over from the 2000-2003 study period     WP 1B     2003-07-15
Results:136 total items.
Result page:  Previous -  1 - 2 - 3  
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  ITU-R Web coordinator
Updated : 2020-12-17