Contributions |
|
Number
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 218 ]
|
Compatibility issues between ultra-wideband and science services (SG 7)
|
Finland
,
Netherlands (Kingdom of the)
,
Switzerland (Confederation of)
,
Sweden
,
Norway
,
France
|
|
2004-10-28 |
|
[ 217 ]
|
Interference from UWB devices into fixed satellite service in the downlink direction in the 4 GHz band
|
France
|
227/1
|
2004-10-28 |
|
[ 216 ]
|
Proposed amendment of the working document towards a preliminary draft new Report ITU-R SM.[UWB.COMP]
|
Germany (Federal Republic of)
|
|
2004-10-28 |
|
[ 215 ]
|
Compatibility between UWB applications and meteorological radars in the 2.8, 5.6 and 9.4 GHz band
|
France
|
|
2004-10-28 |
|
[ 214 ]
|
Proposed amendment of the working document towards a preliminary draft new Report ITU-R SM.[UWB.COMP]
|
Germany (Federal Republic of)
|
|
2004-10-28 |
|
[ 213 ]
|
Working document toward a preliminary draft new Report on compatibility studies of systems using UWB technology with systems operating within the mobile-satellite service (MSS)
|
France
|
|
2004-10-28 |
|
[ 212 ]
|
Proposed modifications to Section 3.3 (new Annex 2) (fixed service) - Subsections 0 to 6 (bands below 10.6 GHz) and new Appendix 3 of the preliminary draft new Report on [compatibility] studies between UWB devices and radiocommunication services
|
Intel
|
|
2004-10-28 |
|
[ 211 ]
|
Proposed modifications to Section 5.1.2 of the working document toward a preliminary draft new Report on compatibility studies of systems using UWB technology with systems operating within radiocommunication services
|
Intel
|
|
2004-10-28 |
|
[ 210 ]
|
Results of analysis for aggregate interference power received by a fixed-satellite service (FSS) Earth-station receiver from USB devices
|
United States of America
|
|
2004-10-27 |
|
[ 209 ]
|
Proposed modifications to working document toward a preliminary draft new Recommendation ITU-R SM.[UWB.CHAR] - Characteristics of ultra-wideband devices
|
United States of America
|
227/1, 226/1
|
2004-10-27 |
|
[ 208 ]
|
Interference analysis methodology to use when the potential interference source can be characterized as a radiating plane
|
United States of America
|
|
2004-10-27 |
|
[ 207 ]
|
Ultra-wideband modulations
|
United States of America
|
|
2004-10-27 |
|
[ 206 ]
|
Proposed revision to Annex A of the UWB characteristics preliminary draft new Recommendation
|
United States of America
|
|
2004-10-27 |
|
[ 205 ]
|
A list of abbreviations and references related to ultra-wideband devices
|
United States of America
|
|
2004-10-27 |
|
[ 204 ]
|
Proposed revision of Section 3.3 (new Annex 2) (fixed service) - Subsections 0 to 6 (bands below 10.6 GHz) and Appendix 3 of the preliminary draft new Report on [compatibility] studies between UWB devices and radicommunication services
|
Convener - Fixed service Annexes
,
WG-2 (DG 2-3)
|
|
2004-10-27 |
|
[ 203 ]
|
Information document - Characterization of ultra-wideband (UWB) pulse distortion in time domain
|
Canada
|
|
2004-10-27 |
|
[ 202 ]
|
Proposed changes to the framework working document
|
Canada
|
|
2004-10-27 |
|
[ 201 ]
|
Information document - Investigation of interference potential of various UWB wave forms
|
Motorola S.A.S.
|
|
2004-10-27 |
|
[ 200 ]
|
Proposed text for the section on radiocommunication services and characteristics in the Task Group 1/8 Report on compatibility studies
|
Canada
|
|
2004-10-27 |
|
[ 199 ]
|
Proposed modifications to the working document towards a PDNR ITU-R SM.[UWB.COMP]
|
Canada
|
|
2004-10-26 |
|
[ 198 ]
|
Proposed changes to [Document 1-8/TEMP/81] working document toward a preliminary draft new Recommendation ITU-R SM.[UWB.CHAR]
|
Robert Bosch GmbH, Siemens AG
|
|
2004-10-26 |
|
[ 197 ]
|
Proposed changes to Chapter 7.10.7 of [Document 1-8/TEMP/68] on compatibility studies between UWB devices around 24 GHz and radiocommunication services
|
Robert Bosch GmbH, Siemens AG
|
|
2004-10-26 |
|
[ 196 ]
|
Compatibility between earth exploration satellites (EESS) and ultra-wideband short range radars for automotive applications in the bands around 24 GHz
|
Robert Bosch GmbH
|
|
2004-10-26 |
|
[ 195 ]
|
Proposed changes to Chapter 7.4.1 of [Document 1-8/TEMP/68] on compatibility studies between UWB devices around 24 GHz and radiocommunication services
|
Robert Bosch GMBH, Siemens AG
|
|
2004-10-26 |
|
[ 194 ]
|
Proposed changes to Chapter 7.10.9 of [Document 1-8/TEMP/68] and to [Document 1-8/TEMP/75] on compatibility studies between UWB devices around 24 GHz and radiocommunication services
|
Robert Bosch GmbH, Siemens AG
|
|
2004-10-26 |
|
[ 193 ]
|
Proposed changes to Chapter 7.10.6 of [Document 1-8/TEMP/68] on compatibility studies between UWB devices around 24 GHz and radicommunication services
|
Robert Bosch GmbH, Siemens AG
|
|
2004-10-26 |
|
[ 192 ]
|
Annex A.1.6 on RLAN in the preliminary draft new Report - Compatibility studies of systems using UWB technology with systems operating within radiocommunication services - Wireless access systems, including RLANs
|
Convenors of Annex 1.6 of TG 1/8 WG 2
|
|
2004-10-26 |
|
[ 191 ]
|
Summary of compatibility studies for WAS/RLAN
|
Convenors of Annex 1.6 of TG 1/8 WG 2
|
|
2004-10-26 |
|
[ 190 ]
|
Experimental data on IMT-DS and UWB compatibility
|
Infocomm Development Authority of Singapore (IDA)
|
227/1
|
2004-10-26 |
|
[ 189 ]
|
Experimental data on GSM/GPRS an UWB compatibility
|
Infocomm Development Authority of Singapore (IDA)
|
227/1
|
2004-10-26 |
|
[ 188 ]
|
Proposed text for § B1.7 of the working document towards a PDNR S.[UWB.CHAR] concerning UWB communication system capacity
|
Japan
|
|
2004-10-25 |
|
[ 187 ]
|
Proposed modification text for § B2.2 of he working document towards a PDNR SM.[UWB.CHAR] concerning UWB modulation schemes
|
Japan
|
|
2004-10-25 |
|
[ 186 ]
|
Proposed text for § 5.1.2 of the working document towards a PDN Report on compatibility studies of systems using UWB technology with systems operating within radiocommunication services concerning UWB mitigation techniques
|
Japan
|
|
2004-10-25 |
|
[ 185 ]
|
Proposed modification of § 6.1.1 of the working document towards a PDNR SM.[UWB.MES] concerning the radiated power measured by using a reverberation chamber
|
Japan
|
|
2004-10-25 |
|
[ 184 ]
|
Proposed modification of § 6.1.3.2.1 of the working document towards a PDNR SM.[UWB.MES] peak power measurement by using a spectrum analyser
|
Japan
|
|
2004-10-25 |
|
[ 183 ]
|
Proposed modification of § 6.1.3.4 of the working document towards a PDNR ITU-R SM.[UWB.MES] measurement initialization for RMS PSD
|
Japan
|
|
2004-10-25 |
|
[ 182 ]
|
Proposed modification of Section 6.1.7 of the working document towards a PDNR ITU-R SM.[UWB.MES] concerning compliance test
|
Japan
|
|
2004-10-25 |
|
[ 181 ]
|
Proposed modification of § 6.2.7.3 and § 6.2.7.4 of the working document towards a PDNR ITU-R SM.[UWB.MES] concerning signal processing and post-processing of waveform data
|
Japan
|
|
2004-10-25 |
|
[ 180 ]
(Rev.1) |
Proposed modification for the Appendix of the working document towards a PDNR ITU-R SM.[UWB.MES] concerning PSD measurement uncertainty on conventional spectrum analyser
|
Japan
|
|
2004-10-25 |
|
[ 179 ]
|
Revision of FS/UWB Report: subsections 2.2 and 7, Appendices 1 and 2 (Bands around 24 GHz) of Annex 2 (Fixed service)
|
Convener - Fixed Service Annexes - WG-2 (DG 2-3)
|
|
2004-10-25 |
|
[ 178 ]
|
Convenor of Annex 7 (radio astronomy) of Working Group 2 - Annex 7 (radio astronomy) of the preliminary draft new Report on compatibility studies between UWB devices and radiocommunication services
|
Convenor of Annex 7 (radio astronomy) of WG 2
|
|
2004-10-22 |
|
[ 177 ]
|
Update of Annex 1.8 of working document toward a preliminary draft new Report on Compatibility studies between ultra-wideband technology within radiocommunication services and the amateur and amateur satellite services
|
International Amateur Radio Union (IARU)
|
|
2004-10-11 |
|
[ 176 ]
|
Proposed modifications to the Chairman's Report of the third international meeting of the Task Group, Annex 3, Document 1-8/162 - Working document towards a PDNR ITU-R SM.[UWB.FRAME] "Spectrum management framework for ultra-wideband"
|
North American Broadcasters Association
|
|
2004-10-11 |
|
[ 175 ]
|
Proposed modifications to the Report on UWB compatibility studies
|
Canada
|
|
2004-10-06 |
|
[ 174 ]
|
On the deletion of additional studies carried forward from the first meeting of Task Group 1/8 on UWB compatibility with IMT-2000 systems
|
Canada
|
|
2004-10-06 |
|
[ 173 ]
|
Liaison statement to Task Group 1/8 - Compatibility between ultra-wideband devices and Earth exploration-satellite service
|
WP 7C
|
|
2004-10-06 |
|
[ 172 ]
|
Joint liaison statement to Task Group 1/8 - Fixed wireless access systems deployment characteristics and protection requirements for indoor deployed terminal stations
|
WPs 9A and 9D
|
|
2004-10-05 |
|
[ 171 ]
|
Modifications to the text on UWB compatibility with the land mobile service in the Task Group 1/8 Report on compatibility studies
|
Canada
|
|
2004-10-05 |
|
[ 170 ]
|
Liaison statement to Task Group 1/8 - Protection criteria applicable to space research (including deep space) and space operation service systems for the use of Task Group 1/8 in their compatibility studies
|
WP 7B
|
|
2004-10-04 |
|
[ 169 ]
+Corr.1 |
Revision of working document toward a preliminary draft new Report on compatibility studies of systems using UWB technology with systems operating within the mobile-satellite service (MSS) including summary table and conclusions
|
Convenor of Annex 4.1 (MSS) of WG 2
|
|
2004-10-01 |
Results:443 total items. Result page:
Previous -
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9
- Next
|
Multiple Document Download: Formats and Languages to be included (when available):