Contributions |
|
Number
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 140 ]
|
Liaison statement to Working Parties 1A, 1B and Study Group 1 - Recommendations ITU-R BS.1786 and ITU-R BT.1786 - Criterion to assess the impact of interference to the terrestrial broadcasting service (BS)
|
SG 6
|
|
2007-05-28 |
|
[ 139 ]
|
New Recommendation ITU-R BS.1786 (Doc. 6/315(Rev.2)) also categorized as ITU-R BT.1786 - Criterion to assess the impact of interference to the terrestrial broadcasting service (BS)
|
World Broadcasting Unions - Technical Committee
|
|
2007-05-24 |
|
[ 138 ]
|
Liaison statement to Radiocommunication Study Groups and Working Parties - Terminology database
|
Coordination Committee for Vocabulary (CCV)
|
|
2007-01-11 |
|
[ 137 ]
|
Activation of the CISPR Liaison Rapporteur Group
|
Rapp. of CISPR Liais. Rapp. Grp. of ITU-R SG 1
|
|
2006-12-14 |
|
[ 136 ]
|
Reply to liaison statement from Study Group 1 and Working Party 1B - Improving the international spectrum regulatory framework
|
Special Committee
|
|
2006-12-13 |
|
[ 135 ]
|
Report from the 2006 CISPR meeting
|
CISPR Liaison Rapporteur
|
|
2006-12-14 |
|
[ 134 ]
|
Final List of Participants - Study Group 1
Geneva, 16-17 October 2006
|
Director, BR
|
|
2006-10-16 |
|
[ 133 ]
|
List of documents issued
|
BR Study Group Department
|
|
2006-10-13 |
|
[ 132 ]
(Rev.1) |
Draft new Recommendation ITU-R SM.[Wideband] - Wideband instantaneous bandwidth spectrum monitoring systems
|
WP 1C
|
|
2006-10-13 |
|
[ 131 ]
(Rev.1) |
Draft new Recommendation ITU-R SM.[FCO - FBO] - Frequency channel occupancy measurements using frequency band measurements
|
WP 1C
|
|
2006-10-13 |
|
[ 130 ]
|
Draft new Question ITU-R [RAD.LOC] - Alternative techniques for radiolocation determination
|
WP 1C
|
|
2006-10-13 |
|
[ 129 ]
(Rev.1) |
Draft new Recommendation ITU-R SM.[SIDEBAND] - Measuring sideband emissions of T-DAB/T-DMB and DVB-T transmitters
|
WP 1C
|
|
2006-10-13 |
|
[ 128 ]
(Rev.1) |
Draft modification of Recommendation ITU-R SM.443-3 - Bandwidth measurement at monitoring stations
|
WP 1C
|
26/1
|
2006-10-13 |
|
[ 127 ]
(Rev.1) |
Draft new Recommendation ITU-R SM.[CEF] - Standard data exchange format for frequency band registrations and measurements at monitoring stations
|
WP 1C
|
|
2006-10-13 |
|
[ 126 ]
|
Draft new Question ITU-R [SPEC.OCC] - Measurement of spectrum occupancy
|
WP 1C
|
|
2006-10-13 |
|
[ 125 ]
|
Executive Report to Study Group 1
|
Acting Chairman, WP 1B
|
|
2006-10-13 |
|
[ 124 ]
|
Executive Report to Study Group 1
|
Chairman, WP 1C
|
|
2006-10-13 |
|
[ 123 ]
(Rev.1) |
Draft revision of Recommendation ITU-R SM.575 - Protection of fixed monitoring stations against radio-frequency interference
|
WP 1C
|
32/1, 31/1
|
2006-10-13 |
|
[ 122 ]
+Add.1 |
Executive Report to Study Group 1
|
Chairman, WP 1A
|
|
2006-10-13 |
|
[ 121 ]
(Rev.1) |
Draft revision of Recommendation ITU-R SM.378-6 - Field-strength measurements at monitoring stations
|
WP 1C
|
24/1
|
2006-10-13 |
|
[ 120 ]
|
Draft new ITU-R Recommendation to be brought to the attention of Study Group 1
|
BR, Study Grp. Dpt.
|
|
2006-10-13 |
|
[ 119 ]
(Rev.1) |
Draft revision of Recommendation ITU-R SM.854-1 - Direction finding and location determination at monitoring stations of signals below 30 MHz
|
WP 1C
|
|
2006-10-13 |
|
[ 118 ]
(Rev.1) |
Draft revision of Recommendation ITU-R SM.1056 - Limitation of radiation from industrial, scientific and medical (ISM) equipment
|
WP 1A
|
70/1
|
2006-10-13 |
|
[ 117 ]
(Rev.1) |
Draft revision of Recommendation ITU-R SM.1138 - Determination of necessary bandwidths including examples for their calculation and associated examples for the designation of emissions
|
WP 1A
|
|
2006-10-13 |
|
[ 116 ]
(Rev.1) |
Draft revision of Recommendation ITU-R SM.1134 - Intermodulation interference calculations in the land-mobile service
|
WP 1A
|
44/1
|
2006-10-13 |
|
[ 115 ]
(Rev.1) |
Draft revision of Recommendation ITU-R SM.182-4
|
WP 1C
|
29/1
|
2006-10-13 |
|
[ 114 ]
(Rev.1) |
Draft revision of Recommendation ITU-R SM.377-3 - Accuracy of frequency measurements at stations for international monitoring
|
WP 1C
|
22/1
|
2006-10-13 |
|
[ 113 ]
|
Draft new Question ITU-R [RFID] - Study of radio frequency identification
|
WP 1A
|
|
2006-10-13 |
|
[ 112 ]
(Rev.1) |
Draft revision of Recommendation ITU-R SM.337-4 - Frequency and distance separations
|
WP 1A
|
72/1
|
2006-10-13 |
|
[ 111 ]
|
Draft new Question ITU-R [INTERF_MODEL] - Study of interference models taking into account interference both from radio and non-radio equipment or installations
|
WP 1A
|
|
2006-10-13 |
|
[ 110 ]
|
Draft new Report ITU-R SM.[GUID_REGUL_FRAM] - Guidance on the regulatory framework for national spectrum management
|
WP 1B
|
|
2006-10-12 |
|
[ 109 ]
|
Co-Chairman for Resolution 9 - Work plan for the Joint Group on Resolution 9
|
ITU-D SG 2
|
|
2006-10-12 |
|
[ 108 ]
(Rev.1) |
Draft revision of Recommendation ITU-R SM.1599 - Determination of the geographical and frequency distribution of the spectrum utilization factor for frequency planning purposes
|
WP 1B
|
66/1
|
2006-10-12 |
|
[ 107 ]
|
Executive Report on the meeting of Task Group 1/9 (Geneva, 11-15 September 2006) - Preparation for WRC-07 Agenda items 1.20 and 1.21 concerning the protection of passive service bands from unwanted emissions
|
Chairman, Task Group 1/9
|
|
2006-10-11 |
|
[ 106 ]
|
Proposed modifications to the draft new Report ITU-R SM.[RAS]
|
Canada
|
|
2006-10-09 |
|
[ 105 ]
|
Liaison statement to ITU-R Study Group 1 - Resolution 9
|
ITU-D SG 2
|
|
2006-10-10 |
|
[ 104 ]
|
Summary record of the meeting of radiocommunication Study Group 1
|
Chairman, Study Group 1
|
|
2006-10-06 |
|
[ 103 ]
|
Draft new Report ITU-R SM.[EESS] - Studies related to the impact of active services allocated in adjacent or nearby bands on EESS passive service
|
TG 1/9
|
|
2006-10-04 |
|
[ 102 ]
|
Addition to the working document toward a preliminary draft new Report - Overview of powerline telecommunication (PLT) systems interference to broadcast services
|
NABA
|
221/1
|
2006-09-22 |
|
[ 101 ]
|
Modification to the working document towards a preliminary draft new Recommendation - Power line high data rate telecommunications systems
|
NABA
|
221/1
|
2006-09-22 |
|
[ 100 ]
|
Draft new Report ITU-R SM. [RAS] - Studies related to the impact of active space services allocated in adjacent or nearby bands on radio astronomy service
|
TG 1/9
|
|
2006-09-26 |
|
[ 99 ]
(Rev.1) |
Proposal of a new study Question
|
Germany (Federal Republic of)
|
|
2006-09-20 |
|
[ 98 ]
|
Liaison statement to Study Group 1 - Methods and techniques used in space radio monitoring
|
WP 6S
|
232/1
|
2006-08-30 |
|
[ 97 ]
|
Draft liaison statement from Study Group 1 to the Coordination Committee for Vocabulary - Answer to point 7 of the liaison statement from CCV (Doc. 1/94)
|
SG 1 Rapp. for Editorial and Vocabulary Group
|
|
2006-08-21 |
|
[ 96 ]
|
Protection of broadcasting services from interference caused by emission of devices without a corresponding frequency allocation in the radio regulations
|
World Broadcastin Unions - Technical Committee
|
227/1
|
2006-06-01 |
|
[ 95 ]
|
Liaison statement to ITU-R SGs - Request for registration and dissemination of ITU-T technology watch function
|
TSAG
|
|
2005-11-17 |
|
[ 94 ]
|
Liaison statement to ITU-R Study Groups from the Coordination Committee for Vocabulary
|
Coord. Committee for Vocabulary
|
|
2005-11-14 |
|
[ 93 ]
|
Draft revision of Resolution 9 (Rev. Istanbul, 2002)
|
ITU-D, SG 2
|
|
2005-10-25 |
|
[ 92 ]
|
Final List of Participants - Study Group 1
|
Director, BR
|
|
2005-10-24 |
|
[ 91 ]
|
List of documents issued
|
BR Study Group Department
|
|
2005-10-21 |
Results:165 total items. Result page:
-
1 -
2 -
3 -
4
- Next
|
Multiple Document Download: Formats and Languages to be included (when available):