Contributions |
|
Number
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 50 ]
|
Proposed preliminary draft new Recommendation - Evaluation and planning of Fixed Service Radio System in a multipath fading environment
|
Tele-IP
|
|
2001-10-01 |
|
[ 49 ]
|
An introduction to the proposed preliminary draft new Recommendation evaluation and planning of radio systems in a multipath fading environment
|
Tele-IP
|
|
2001-10-01 |
|
[ 48 ]
|
Preliminary Draft Revision of Rec. ITU-R F.592 - Terminology used for Radio-Relay Systems
|
Russian Federation
|
|
2001-10-01 |
|
[ 47 ]
|
Inconsistency between error performance objectives approaches for bit rates below and above the primary rate
|
Russian Federation
|
|
2001-10-01 |
|
[ 46 ]
|
FS interference criteria in the 28 and 40 GHz band
|
France
|
|
2001-10-01 |
|
[ 45 ]
|
Working document toward DNR - Interference criteria to protect broadband wireless access systems in the fixed service from aggregate interference from GSO satellites of other services sharing the 37-40 GHz frequency band on a co-primary basis
|
United States of America
|
|
2001-10-01 |
|
[ 44 ]
|
DNR ITU-R F.[9A/PDIR]-Perform. degradation due to interfer. from other services sharing the same frequ. bands with real digital radio-relay links used in the intern. and nat. portions of a 27 500 km hypothetical ref. path at or above the prim. rat
|
United States of America
|
|
2001-10-01 |
|
[ 43 ]
|
Proposed amendments to PDNR ITU-R [9A/NGSO-3] - Interference criteria to protect the fixed service from time varying aggregate interference from other services sharing the 37-40 and 40.5-43.5 GHz bands on a co-primary basis
|
United States of America
|
|
2001-10-01 |
|
[ 42 ]
|
Comparison between the established and newly proposed methodologies for the evaluation of FSS interference impact on FS systems in frequency bands where precipitation attenuation is the predominant fading mechanism
|
United States of America
|
|
2001-10-01 |
|
[ 41 ]
|
Fixed Service parameters and future use of the frequency range 37.5 to 42.5 GHz
|
France
|
|
2001-10-01 |
|
[ 40 ]
|
Protection criteria for FS systems in the 6 GHz and 14 GHz band
|
France
|
|
2001-10-01 |
|
[ 39 ]
|
A process for incorporation of QoS into F-Series Recommendations
|
Canada
|
|
2001-10-01 |
|
[ 38 ]
|
Review of Recommendation ITU-R F.745 (Resolution ITU-R 44)
|
Brazil (Federative Republic of)
|
|
2001-10-01 |
|
[ 37 ]
|
Proposal for deletion of Recommendations ITU-R F.1189 and ITU-R F.1092
|
Brazil (Federative Republic of)
|
|
2001-10-01 |
|
[ 36 ]
|
Proposed modification to Recommendations ITU-R F.1491 and ITU-R F.1397
|
Brazil (Federative Republic of)
|
|
2001-10-01 |
|
[ 35 ]
|
Proposal for advancing the work on models for planning, evaluating the operation and estimating error performance of fixed radio systems
|
Telia AB, Farsta
|
|
2001-10-01 |
|
[ 34 ]
|
Proposed updating of certain Recommendations which are not reprinted including Recommendation ITU-R F.745
|
Japan
|
|
2001-10-01 |
|
[ 33 ]
|
Liaison statement to ITU-T Study Group 4 (Q.3/4, SG 11 (Q.BICC/11), SG 2 and ITU-R Working Parties 4B & 9A, JRG 8A-9B
|
ITU-T SG 13
|
|
2001-10-01 |
|
[ 32 ]
|
Liaison statement - Progress on Recommendations on availability of the physical layer
|
ITU-T SG 13
|
|
2001-10-01 |
|
[ 31 ]
|
Liaison statement to WP 9A - Derivation of fixed service interference criteria in the 5 925-6 425 MHz band
|
WP 4-9S
|
|
2001-10-01 |
|
[ 30 ]
|
Liaison to Study Group 9 - Conclusions of Study Group 9 meeting concerning future status of Joint Rapporteur Group 8A-9B and restructuring of SG 9 related activities
|
SG 8
|
|
2001-10-01 |
|
[ 29 ]
|
Liaison statement to Working Parties 9A, 9B and 4A - A new methodology to be used for the evaluation of the impact of space-to-Earth interference from the fixed-satellite service on the fixed service in frequency bands where ...
|
WP 4-9S
|
|
2001-10-01 |
|
[ 28 ]
|
Chairman's Report of the meeting of Working Party 9A held in Geneva (18-25 September 2000)
|
Chairman, WP 9A
|
|
2001-10-01 |
|
[ 27 ]
|
List of documents issued
|
BRSGD
|
|
2001-10-01 |
|
[ 26 ]
|
Consideration of the structure of ITU-R Study Group 9
|
Canada
|
|
2001-10-01 |
|
[ 25 ]
|
Elements for preliminary draft new Recommendation ITU-R F.[PFWA] - Error performance objectives for real digital radio links used in the access network section of the international or national portions of the synchronous hypothetical reference ...
|
Canada
|
|
2001-10-01 |
|
[ 24 ]
|
FS interference criteria in the 38 and 40 GHz band
|
France
|
|
2001-10-01 |
|
[ 23 ]
|
Draft revision of Recommendation ITU-R F.1491 - Error performance objectives for real digital radio links used in the national portion of a 27 500 km hypothetical reference path at or above the primary rate
|
Russian Federation
|
|
2001-10-01 |
|
[ 22 ]
|
Draft revision of Rec. ITU-R F.1189-1 - Error performance objectives for constant bit rate digital paths at or above the primary rate carried by digital radio-relay systems which may form part or all of the national portion of a 27 500 km ...
|
Russian Federation
|
|
2001-10-01 |
|
[ 21 ]
|
Draft revision of Rec. ITU-R F.1092 - Error performance objectives for constant bit rate digital path at or above the primary rate carried by digital radio-relay systems which may form part of the international portion of a 27 500 km ...
|
Russian Federation
|
|
2001-10-01 |
|
[ 20 ]
|
Draft revision of Recommendation ITU-R F.1397 - Error performance objectives for real digital radio links used in the international portion of a 27 500 km hypothetical reference path at or above the primary rate
|
Russian Federation
|
|
2001-10-01 |
|
[ 19 ]
|
Review of scopes of Working Parties within Study Group 9 - Considerations on merging WP 9B and JRG 8A-9B into a unique WP 8-9W
|
Siemens Information and Communication Networks SpA
|
|
2001-10-01 |
|
[ 18 ]
|
Impact of the new ITU-T Recommendation G.828 on design of digital radio-relay links
|
Russian Federation
|
|
2001-10-01 |
|
[ 17 ]
|
Proposed amendments to preliminary draft new Recommendation [9A/NGSO-3] - Interference criteria to protect the fixed service time varying aggregate interference from other services sharing the 37-40 GHz and 40.5-43.5 GHz bands on a co-primary basi
|
United States of America
|
|
2001-10-01 |
|
[ 16 ]
|
Potential upgrade of JRG 8A-9B to a Joint Working Party
|
United States of America
|
|
2001-10-01 |
|
[ 15 ]
|
Review of Study Group 9 questions for applicability of the provisional alternate approval procedure
|
United States of America
|
|
2001-10-01 |
|
[ 14 ]
|
Proposed deletion of certain Recommendations which are not reprinted and proposed revision of Recommendation ITU-R F.745
|
Japan
|
|
2001-10-01 |
|
[ 13 ]
+Add.1 |
Additional report to the next Working Party 9A meeting
|
Chairman, WP 9A
|
|
2001-10-01 |
|
[ 12 ]
|
Updating of certain maintained Recommendations in Section 9A
|
Chairman, WP 9A
|
|
2001-10-01 |
|
[ 11 ]
|
Questions identified as suitable for approval by the alternative procedure according to Resolution ITU-R 45
|
Chairman, SG 9
|
|
2001-10-01 |
|
[ 10 ]
|
Recommendations to be brought to the attention of Study Group 9 Working Parties
|
Chairman, SG 9
|
|
2001-10-01 |
|
[ 9 ]
+Add.1 |
Consideration on future status of JRG 8A-9B and review of scopes of Working Parties within Study Group 9
|
Chairman, WP 9B
|
|
2001-10-01 |
|
[ 8 ]
|
Questions to be brought to the attention of Study Group 9 Working Parties
|
Chairman, SG 9
|
|
2001-10-01 |
|
[ 7 ]
|
Liaison statement from Working Party 3M to Working Party 9A concerning propagation aspects of bringing-into-service digital radio-relay systems
|
WP 3M
|
|
2001-10-01 |
|
[ 6 ]
|
Liaison statement from Working Party 3M to Working Party 9A concerning multipath fading prediction for link hop lengths less than 7km
|
WP 3M
|
|
2001-10-01 |
|
[ 5 ]
|
Liaison statement from Working Party 3M to Working Party 9A concerning number of fade events and fade duration statistics
|
WP 3M
|
|
2001-10-01 |
|
[ 4 ]
|
Liaison statement from Working Party 3M to Working Party 9A concerning SDH performance prediction and proposed revisions to Recommendation ITU-R P.530-8
|
WP 3M
|
|
2001-10-01 |
|
[ 3 ]
|
Liaison statement from Working Party 3M to Working Party 9A concerning The design of digital radio-relay systems and minimizing outage due to multipath propagation
|
WP 3M
|
|
2001-10-01 |
|
[ 2 ]
|
Liaison statement from Working Party 3M to Working Party 9A concerning Joint Rapporteur Group 3M-9A
|
WP 3M
|
|
2001-10-01 |
|
[ 1 ]
|
Documents to be carried forward to the next study period (2000-2002)
|
BR Secretariat
|
|
2001-10-01 |
Results:125 total items. Result page:
Previous -
1 -
2 -
3
-
|
Multiple Document Download: Formats and Languages to be included (when available):