International Telecommunication Union   ITU
Français  Espańol
 
Site map Contact Us Print version
  Home : ITU-R : WP7D : Contributions  Recently posted -  Search Meeting Documents
   
ITU-R WP7D  C 

ITU-R WP7D

Radio-astronomy

Results:157 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7  - Next Next
Contributions  Documents / Contributions
 
Number 
Received Source Title Questions
[ 82 ]  
 
2002-02-11 USA   Draft new Recommendation (DNR) - Technical and operational characteristics of ground-based astronomical facilities operating between 10 THz and 1 000 THz     N/A  
[ 81 ]  
 
2002-02-11 WP 8D   LS to WPs 7C, 7D and 7E - Proposed elements for the CPM Report regarding sharing between the MetAids and the MetSat services and the mobile-satellite service in the band 1 670-1 690 MHz     N/A  
[ 80 ]  
 
2002-02-11 Chapter Rapporteur   Proposed draft structure for Chapter 1 of the CPM Report to WRC-03 including already developed preliminary draft text elements     N/A  
[ 79 ]  
 
2002-02-11 WP 9D   Liaison statement to TG 1/7 and WP 7D     N/A  
[ 78 ]  
 
2002-02-11 WP 8D   Liaison statement to WPs 4A, 7B, 7D, 7E and 9D - Agenda item 1.11 of WRC-03     N/A  
[ 77 ]  
 
2002-02-11 WP 8D   Liaison statement to Working Party 7D - Agenda item 1.15 and Resolution 604: Unwanted emission levels produced by RNSS in the band 5 010-5 030 MHz into radio astronomy in the 4 990-5 000 MHz band     N/A  
[ 76 ]  
 
2002-02-11 WP 8D   Liaison statement to WPs 7C, 7D, 8A, 8B and 9D - Elements for proposed draft CPM text regarding non-GSO MSS feeder-link allocations near 1.4 GHz     N/A  
[ 75 ]  
 
2002-02-11 TG 1/7   Liaison to WPs 1C, 4A, 6S, 7B, 7C, 7D, 8B, 8D, 9B, 9C and 9D     N/A  
[ 74 ]  
 
2002-02-11 WP 1A & 1B   Liaison statement to WPs 3J, 4A, 4B, 6E, 6S, 7B, 7D, 8A, 8B and 9D - Compatibility between Ultra Wideband (UWB) emissions and Radiocommunication Services     N/A  
[ 73 ]  
 
2002-02-11 Chairman, TG 1/7   Liaison statement Working Parties 4A, 6S, 7C, 7D, 8D, 9B, 9D and the Chairmen of Study Groups 4, 6, 7, 8 and 9     N/A  
[ 72 ]  
 
2002-02-11 WP 9D   Liaison statement from WP 9D - Resolution 79 (WRC-2000) on the coordination distance between radio astronomy and earth stations in bands above 30 GHz and P-MP high density applications in the fixed servce     N/A  
[ 71 ]  
 
2002-02-11 WP 8D   Liaison statement to WPs 4A, 7D and TG 1/7 - Interference calculations between radio astronomy telescopes and non-GSO satellite systems     N/A  
[ 70 ]  
 
2002-02-11 USA   Working Document towards CPM text regarding sharing between the AMSS and the Radio Astronomy service in the 14-14.5 GHz band     N/A  
[ 69 ]  
 
2002-02-11 WP 7E   Liaison statement to WPs 8D, 7C and 7D - Review of proposed preliminary elements for the CPM Report prepared by WP 8D regarding sharing between the Metaids and the Metsat services and the mobile-satellite service in the band ...     N/A  
[ 68 ]  
 
2002-02-11 WP 7E   Liaison statement to WP 8D on compatibility between the AMSS and the radio astronomy service in the 14.0-14.5 GHz band     N/A  
[ 67 ]  
 
2002-02-11 SG 7   Note by Study Group 7 Chairman     N/A  
[ 66 ]  
 
2002-02-11 WP 4-9S   Liaison statement to SC02-4, Task Group 1/7, Working Parties 7C, 7D, 7E, 8A, 8B, 8F, 9B and 9D - Draft CPM texts addressing Resolutions 122 and 734     N/A  
[ 65 ]  
+Corr.1 
2002-02-11 WP 4A   Liaison statement to Working Parties 6S, 7D, 7E, 8D and Task Group 1/7 - Interference calculations between radio astronomy telescopes and non-GSO satellite systems     N/A  
[ 64 ]  
 
2002-02-11 WP 4A   Liaison statement to Working Parties 6S, 7D, 7E, 8A and 9D and Task Group 1/7 - CPM text for agenda item 1.32 (Resolution 128)     N/A  
[ 63 ]  
 
2002-02-11 WP 4A   Liaison statement to Task Group 1/7, Working Parties 6S, 7C, 7D, 7E, 8D and 9D - Methods under consideration regarding WRC-03 agenda item 1.8.2     N/A  
[ 62 ]  
 
2002-02-11 WP 4A   Liaison statement to WP 4-9S, WPs 7D and 7E - Possible allocation of the 47.2-50.2 GHz band (or parts of it) to the fixed-satellite service (space-to-Earth)     N/A  
[ 61 ]  
 
2002-02-11 WP 9B & 9D   Liaison statement to TG 1/7 and WPs 4-9S, 7C, 7D, 7E, 8A, 8B and 8F - CPM texts addressing Resolutions 122 and 734     N/A  
[ 60 ]  
 
2002-02-11 Chapter Rapporteur   Proposed draft structure for Chapter 1 of the CPM Report to WRC-03 including already developed preliminary draft text elements     N/A  
[ 59 ]  
 
2002-02-11 WP 6S   Reply to Liaison statement from SG1, WP's 4A, 7C, 7D, 8D, TG 1-7     N/A  
[ 58 ]  
 
2002-02-11 WP 6S   Reply to Liaison statement to TG 1-7, WP's 4A, 7D, 7E and 8D     N/A  
Results:157 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

 

Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  ITU-R Web coordinator
Updated : 2003-04-28