International Telecommunication Union   ITU
Français  Espańol
 
Site map Contact Us Print version
  Home : ITU-R : WP7C : Contributions  Recently posted -  Search Meeting Documents
   
ITU-R WP7C  C 

ITU-R WP7C

Earth-exploration satellite systems and meteorological elements

Results:267 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11  - Next Next
Contributions  Documents / Contributions
 
Number 
Received Source Title Questions
[ 142 ]  
 
2002-02-11 TG 1/7   Liaison statement to Working Parties 7C, 9B and 9D - WRC-03 Agenda item 1.8.1 - Compatibility analysis between the earth exploration-satellite (passive) service in the 1 400-1 427 MHz band and the fixed service in the ...     N/A  
[ 141 ]  
 
2002-02-11 WP 8D   Liaison statement to WPs 7C, 7D, 8A, 8B and 9D - Elements for proposed draft CPM text regarding non-GSO MSS feeder-link allocations near 1.4 GHz     N/A  
[ 140 ]  
 
2002-02-11 TG 1/7   Liaison to WPs 1C, 4A, 6S, 7B, 7C, 7D, 8B, 8D, 9B, 9C and 9D     N/A  
[ 139 ]  
 
2002-02-11 WP 8D   LS to WP 7C - Comments on preliminary draft revised Recommendations ITU-R SA.1264 and SA.1158 regarding sharing between the MetAids and the MetSat services and the mobile-satellite service in the band 1 670-1 710 MHz     N/A  
[ 138 ]  
 
2002-02-11 WP 8D   Liaison statement to Working Parties 7C and 7E - Proposed elements for the CPM report regarding sharing between the metAids and the MetSat services and the mobile-satellite service in the band 1 670-1 690 MHz     N/A  
[ 137 ]  
 
2002-02-11 WP 1A   Liaison statement to Working Parties 4A, 6E, 6S, 7A, 7B, 7C, 8A, 8B, 8D, 8F and 9B - Definitions of the spectral properties of transmitter emissions     N/A  
[ 136 ]  
 
2002-02-11 WP 1A & 1B   Liaison statement to WPs 3J, 4A, 4B, 6E, 6S, 7B, 7D, 8A, 8B and 9D - Compatibility between Ultra Wideband (UWB) emissions and Radiocommunication Services     N/A  
[ 135 ]  
 
2002-02-11 Chairman, TG 1/7   Liaison statement Working Parties 4A, 6S, 7C, 7D, 8D, 9B, 9D and the Chairmen of Study Groups 4, 6, 7, 8 and 9     N/A  
[ 134 ]  
 
2002-02-11 WP 4A   Liaison statement to WP 7C and JTG 4-7-8-9 - Earth exploration-satellite service (active) allocation in the band 5 140-5 250 MHz     N/A  
[ 133 ]  
 
2002-02-11 WP 8A   Liaison statement to Working Party 7C - Studies related to WRC-03 agenda item 1.38 - Possible allocation to EESS (active) in the range 420-470 MHz     N/A  
[ 132 ]  
 
2002-02-11 WP 8A   Liaison statement to WPs 7E and 7C - CPM text for WRC-03 Agenda item 1.38     N/A  
[ 131 ]  
 
2002-02-11 JRG 8A-9B   Liaison statement to WP 7C (and WP 8B for information) - WRC-03, Agenda item 1.5, Resolution 736 (WRC-2000) resolves 1, 2 and 3: Sharing between wireless access systems in the mobile service (including RLANs) and fixed wireless access ...     N/A  
[ 130 ]  
 
2002-02-11 WP 7E   Preliminary draft CPM text     N/A  
[ 129 ]  
 
2002-02-11 WP 7E   Liaison statement to WPs 8D, 7C and 7D - Review of proposed preliminary elements for the CPM Report prepared by WP 8D regarding sharing between the Metaids and the Metsat services and the mobile-satellite service in the band ...     N/A  
[ 128 ]  
 
2002-02-11 WP 7E   Liaison statement to WPs 7C, 8A, 8B and 9D     N/A  
[ 127 ]  
 
2002-02-11 WP 4-9S   Liaison statement to SC02-4, Task Group 1/7, Working Parties 7C, 7D, 7E, 8A, 8B, 8F, 9B and 9D - Draft CPM texts addressing Resolutions 122 and 734     N/A  
[ 126 ]  
 
2002-02-11 WP 9B & 9D   Liaison statement to TG 1/7 and WP 7C on Agenda item 1.8.2 - Compatibility between Earth-Exploration Satellite Service (passive) systems and Fixed Service systems operating in adjacent bands near 31 GHz and 52 GHz     N/A  
[ 125 ]  
 
2002-02-11 WP 4A   Liaison to Working Parties 1A, 6S, 7B, 7C, 8D, Satellite Backlog Action Group and the Radiocommunications Bureau - Development of specifications for automating Article S5 and other provisions of the radio regulations     N/A  
[ 124 ]  
+Add.1 
2002-02-11 WP 4A   Liaison Statement to the Special Committee, Working Parties 1A, 6S, 7B, 7C and 8D and Note to the Director, Radiocommunication Bureau     N/A  
[ 123 ]  
 
2002-02-11 WP 9D   Liaison statement to Working Parties 7C and 7E - Studies related to WRC-03 agenda item 1.38 - Possible allocation to EESS (active) in the range 420-470 MHz     N/A  
[ 122 ]  
 
2002-02-11 WP 4A   Liaison statement to Task Group 1/7, Working Parties 6S, 7C, 7D, 7E, 8D and 9D - Methods under consideration regarding WRC-03 agenda item 1.8.2     N/A  
[ 121 ]  
 
2002-02-11 WP 9B & 9D   Liaison statement to TG 1/7 and WPs 4-9S, 7C, 7D, 7E, 8A, 8B and 8F - CPM texts addressing Resolutions 122 and 734     N/A  
[ 120 ]  
 
2002-02-11 Chapter Rapporteur   Proposed draft structure for Chapter 1 of the CPM Report to WRC-03 including already developed preliminary draft text elements     N/A  
[ 119 ]  
 
2002-02-11 WP 6S   Reply to Liaison statement from SG1, WP's 4A, 7C, 7D, 8D, TG 1-7     N/A  
[ 118 ]  
 
2002-02-11 France   Protection of Earth explortaion-satellite service (passive) bands     N/A  
Results:267 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

 

Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  ITU-R Web coordinator
Updated : 2003-04-28