Contributions |
|
Number
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 110 ]
|
Definition of telemetry, tracking and command
|
Canada
|
|
2003-03-03 |
|
[ 109 ]
|
Proposal for a preliminary draft new Recommendation - Methods to enhance TCP/IP performance over satellite links
|
Japan
|
263/4
|
2003-02-27 |
|
[ 108 ]
|
Test results using 2-segment splitting technique for enhancement TCP/IP performance
|
Japan
|
263/4
|
2003-02-27 |
|
[ 107 ]
|
Liaison statement - Reply to liaison statement on Transmission of Time & Date Information
|
ITU-T Working Parties 1/4 and 2/4
|
|
2003-02-21 |
|
[ 106 ]
|
Liaison statement: Information Security Management System for Telecommunication use
|
ITU-T Study Group 17
|
|
2003-02-18 |
|
[ 105 ]
|
Report of ITU-T SG 13 WP 3 meeting 29 October to 8 November 2002
|
EUTELSAT
|
|
2002-12-11 |
|
[ 104 ]
|
Report of ITU-T SG 13 WP 4 meeting (29 October - 8 November 2002)
|
EUTELSAT
|
|
2002-12-11 |
|
[ 103 ]
|
Report of ITU-T SG 13 WP 2 meeting from 29 October to 8 November 2002
|
EUTELSAT
|
|
2002-12-11 |
|
[ 102 ]
|
Report of the ITU-T SG 13 WP1 Meeting - 29 October to 8 November 2002
|
EUTELSAT
|
|
2002-12-11 |
|
[ 101 ]
|
Liaison statement on the ITU-T IP project to all ITU-T Study Groups, ITU-R Working Groups, IETF
|
ITU-T SG 13
|
|
2002-12-09 |
|
[ 100 ]
|
Liaison statement to all ITU-T Study Groups, ITU-R Working Groups, ETSI on the ITU-T NGN 2004 project
|
ITU-T SG 13
|
|
2002-12-09 |
|
[ 99 ]
|
Liaison statement: Recommendations ITU-T G.821, G.826 and G.829
|
ITU-T SG 13
|
|
2002-12-09 |
|
[ 98 ]
|
Liaison statement to ITU-R WP 4B on extensive use of E-model for delay performance targets and interim meeting plans
|
ITU-T SG 13
|
|
2002-12-05 |
|
[ 97 ]
|
Liaison statement to ITU-R Working Party 4B, Working Party 9A
|
ITU-T SG 13
|
|
2002-12-05 |
|
[ 96 ]
|
Liaison statement to WP 4B - Basic reference models and performance parameters of IP-Packet network transmission in the mobile-satellite service
|
WP 8D
|
|
2002-10-04 |
|
[ 95 ]
|
Liaison statement to ITU-R SG 4 and SG 8 and ITU-T SG 9
|
WP 6M
|
|
2002-09-09 |
|
[ 94 ]
|
Use of out-of-band and spurious domains
|
WP 1A
|
|
2002-08-06 |
|
[ 93 ]
|
Draft liaison statement to WP 4B, WP 6A and WP 6S on Recommendation J.96, Amendment 1
|
ITU-T SG 9
|
|
2002-07-09 |
|
[ 92 ]
(Rev.1) |
Liaison statement to Working Parties 4B and 9B and Joint Rapporteur Group 8A-9B - New versions of the access network transport (ANT) standardization plan and work plan
|
ITU-T SG 15
|
|
2001-10-01 |
|
[ 91 ]
(Rev.1) |
Liaison statement to WP 4B and 7A on transmission of time and date information
|
ITU-T SG 15
|
|
2001-10-01 |
|
[ 90 ]
(Rev.1) |
Development of ITU-T Recommendation G.167bis on Interactio of SPNE including IPCME
|
ITU-T SG 15
|
|
2001-10-01 |
|
[ 89 ]
(Rev.1) |
Report of the fifteenth meeting of Working Party 4B (Geneva, 3-10 April 2002)
|
Ch. WP 4B
|
|
2001-10-01 |
|
[ 88 ]
(Rev.1) |
New direction with respect to draft new Recommendation G.821.1
|
ITU-T SG 13
|
|
2001-10-01 |
|
[ 87 ]
(Rev.1) |
List of documents issued
|
BRSGD
|
|
2001-10-01 |
|
[ 86 ]
(Rev.1) |
Quality of service (QoS) architecture for satellite IP networks
|
USA
|
|
2001-10-01 |
|
[ 85 ]
(Rev.1) |
Performance and availability objectives for an FSS network operating in the 20/30 GHz band
|
USA
|
|
2001-10-01 |
|
[ 84 ]
(Rev.1) |
Fade duration statistics
|
Ch. WP 4B
|
|
2001-10-01 |
|
[ 83 ]
(Rev.1) |
Draft modification of Recommendation ITU-R S.1522 - Impact of loss of synchronization and timing recovery on availability in hypothetical reference digital paths
|
India
|
|
2001-10-01 |
|
[ 82 ]
(Rev.1) |
Activities within Q.13/SG 13 - Hypothetical reference model of satellite IP network interconnected to terrestrial IP network
|
Japan
|
|
2001-10-01 |
|
[ 81 ]
(Rev.1) |
Report of the ITU-T SG 13 meeting in Geneva, 22 January to 1 February 2002
|
EUTELSAT
|
|
2001-10-01 |
|
[ 80 ]
(Rev.1) |
Time and date signals
|
EUTELSAT
|
|
2001-10-01 |
|
[ 79 ]
(Rev.1) |
Liaison statement - Draft new Question Q.[ets/16] on Emergency Telecommunications Service (ETS)
|
ITU-T SG 16
|
|
2001-10-01 |
|
[ 78 ]
(Rev.1) |
Timestamps in satellite transport systems
|
EUTELSAT
|
|
2001-10-01 |
|
[ 77 ]
(Rev.1) |
Liaison statement from ITU-T SG 13 on draft Recommendation Y.1541
|
ITU-T SG 13
|
|
2001-10-01 |
|
[ 76 ]
(Rev.1) |
Liaison statement - Liaison statement on Interim Q. 13/13 Rapporteur Meeting - "Interoperability of Satellite and Terrestrial Networks
|
ITU-T SG 13
|
|
2001-10-01 |
|
[ 75 ]
(Rev.1) |
Preparation for the development of a new Recommendation to complement G.optperf
|
EUTELSAT
|
|
2001-10-01 |
|
[ 74 ]
(Rev.1) |
Liaison statement from WP 8D - Basic reference models and performance parameters of IP packet network transmission in the mobile-satellite service
|
WP 8D
|
|
2001-10-01 |
|
[ 73 ]
(Rev.1) |
Liaison statement to WPs 3J, 4A, 4B, 6E, 6S, 7B, 7D, 8A, 8B and 9D - Compatibility between Ultra Wideband (UWB) emissions and Radiocommunication Services
|
WP 1A & 1B
|
|
2001-10-01 |
|
[ 72 ]
(Rev.1) |
Liaison statement to SG 8, WP 4B, JRG 8A-9B and WP 9B
|
ITU-T SG 15 WP 5/15
|
|
2001-10-01 |
|
[ 71 ]
(Rev.1) |
Liaison statement to ITU-R WP 4B - Reply to LS on G.IPCME
|
ITU-T SG 15
|
|
2001-10-01 |
|
[ 70 ]
(Rev.1) |
Part 1 - Report of the fourteenth meeting of Working Party 4B (Geneva, 1-8 October 2001)
|
Ch. WP 4B
|
|
2001-10-01 |
|
[ 69 ]
(Rev.1) |
Liaison statement to ITU-R WP 9A, 4B, JRG 8A-9B, ITU-T SG 17 and SG 12 - Revisions for draft new Recommendation Y.1541 - Network performance objectives for IP-based services
|
ITU-T SG 13
|
|
2001-10-01 |
|
[ 68 ]
(Rev.1) |
List of documents issued
|
BRSGD
|
|
2001-10-01 |
|
[ 67 ]
(Rev.1) |
Working document towards a draft new Recommendation - Influence of BER over QoS for TCP and UDP traffic over satellite networks with differentiated services
|
USA
|
|
2001-10-01 |
|
[ 66 ]
(Rev.1) |
Quality of Service - Support in the Internet - Elaboration of the concept and the influence of the operation of TCP on the end-to-end performance
|
EUTELSAT
|
|
2001-10-01 |
|
[ 65 ]
(Rev.1) |
Report of the 1st meeting of the ICG on satellite matters (Ankara, Turkey, 26-28 June 2001)
|
Ch. ICG-SAT
|
|
2001-10-01 |
|
[ 64 ]
(Rev.1) |
A performance comparison of Ku band versus frequencies above 17 GHz in the fixed satellite service for the use of telemetry, tracking and command (TT&C) above 17 GHz
|
Canada
|
|
2001-10-01 |
|
[ 63 ]
(Rev.1) |
Report on ITU-T SG 15 activities
|
EUTELSAT
|
|
2001-10-01 |
|
[ 62 ]
(Rev.1) |
Discussion on Satellite IP network system and relation between physical layer and IP parameters (Question ITU-R 263/4)
|
Japan
|
|
2001-10-01 |
|
[ 61 ]
(Rev.1) |
Working Document towards a draft new Recommendation on TCP/IP performance over satellite links - A possible method to enhance TCP/IP performance over satellite links
|
Japan
|
|
2001-10-01 |
Results:135 total items. Result page:
-
1 -
2 -
3
- Next
|
Multiple Document Download: Formats and Languages to be included (when available):